Loading...
WA9302-CS 950511 SHIMEK, JACOBS & FINKLEA CONSUITING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225 (214) 361-7900 ROSS L. IACOBS, RE. JAMES E. LAUGHLIN, P.E. RONALD V. CONWAY, JOHN W. BIRKHOFF, P.E. MATT ARMSTRONG, P.E. JOE R. CARTER, P.E. GARY C. HENDRICKS, RE. May l 1, 1995 c. L. SHIMEK, RE. Mr. Kenneth M. Griffin, P.E. Asst. City Managera)ir. of Public Works/City Engineer City of Coppell Post Office Box 478 Coppell, Texas 75019-0478 Re: Vill.age Parkway Ground Storage Reservoir No. 2 We have checked bids received at 2:00 P.M., May 8, 1995 for construction of the Village Parkway Ground Storage Reservoir project. We are enclosing five copies of the tabulation of bids received. The two anticipated contractors submitted bids for this project. The lowest bid received was submitted by Natgun Corporation of Wakefield, Massachusetts, in the amount of $2,809,305.00. This contractor has a record of satisfactory performance on work of this type. We have reviewed their financial statement and fred it acceptable. Accordingly, based on the information available to us we recommend that the City accept the proposal of Natgun Corporation and award a contract on the basis of $2,809,305.00. We are also enclosing the financial and additional experience records submitted by Natgun along with our copies of the bid documents. We are available at your convenience to discuss any questions you may have with our recommendation. Sincere ' Enclosures ce: Mr. Howard Pafford PROJECT: TABULATION OF CITY OF COPPELL, TEXAS Village Parkway Ground Storage Reservoir No. 2 Project No. WA-9302: Bid No. QO395-01 IITEM APPROXIMATE O N . QUANTITIES 1 1 2 590 ~ 3 3 4 3 5 1 6 1 7 590 8 1 9 17 10 50 11 45,000 ~ 12 2,210 13 4 14 4 BIDS DATE: May 8, 1995 SHIMEK, JACOBS & FINKLEA CONSULTING ENGINEERS Dallas, Texas UNIT DESCRIPTION L.S. 6-MG, Precast, Wire-Wound Prestressed Conc Ground Storage Reservoir L.F. Furnishing and Installing 36" Reinforced Concrete Cylinder Pipe Ea. Furnishing and Installing 36" Direct Burial Butterfly Valves Ea. Connect to Existing 36" Water Lines, incl. Removal of all Plugs, Blind Flanges, etc. L.S. Coating Exterior of the Proposed 6 Million Gallons Ground Storage Reservoir L.S. Modifications to Exist Exterior Ladder on the Exist Ground Storage Reservoir No. 1 LF. Design, Furnish, Install, Maintain & Remove Trench Safety Devices for 36" WL Const L.S. Furnishing and Installing Site Irrigation, Complete and Operational Ea. Furnishing and Planting 3" Live Oak Tree Ea. Furnishing and Planting One Gallon Coral Honeysuckle S.F. Furnishing and Distributing Bermuda Grass Hydromulched S,Y. Furnishing and Placing Bermuda Grass Solid Sod Ea. Removal and disposal of existing trees Ea. Removal, Relocating and Transplanting existing Cedar Elm Trees TOTAL AMOUNT BID (Items I Through 14) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COST: $3,000,000.00 NOTE: Engineers Opinion of Probable Cost Not Itemized. Calendar Days Bid BID OF Natgun Corporation 11 Teal Road Wakefield, MA 01880 UNIT BID PRICE $2,525,838.00 $236.00 $12,880.00 $5,175.00 $60,815.00 $2,520.00 $4.60 $10,665.00 $219.00 $14.40 $0.05 $2.70 $57.00 $115.00 EXTENSION $2,525,838.00 $139,240.00 $38,640.00 $15,525.00 $60,815.00 $2,520.00 $2,714.00 $10,665.00 $3,723.00 $720.00 $2,250.00 $5,967.0C $228.0C $460.0~ $2,809,305.0 300 BID OF Preload, Inc. 839 Stewart Ave. Garden City, N.Y. 11530 UNIT BID PRICE $2,690,677.00 $236.00 $17,250.00 $24,100.00 $2,500.00 $1.20 $10,670.00 $14.50 $2.80 $60.00 $115.00 EXTENSION $2,690,677.00 $139,240.00' $51,750.00;; $24,100.O0~i ~r $10,670.00~ $725.0G! $2,700.0C $460.00! $2,964,398.00 300 ?~qe 1 of I