Gunner P2-LR001228 TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL A~ND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW AUSTIN
11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Conmaunities - Kurt Heinbecker
REPORT DATE: 12728100 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-106 CiR' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 4000 Placement Date: 11/30."00
Slump ('in.): 5 -;- 1 Sampled By: A. Haves
Air Content (%): 4 -..'-2 Weather: Sunny: Nice
Concrete Temp (°F): I00 Supplier-Mix: TXI ' 8272
FIELD DATA: SET #1
Ticket ~: 2'785841 Time Batched: 10:47 AM Time Sampled: 1:18 PM
Slump (in.): 6 Air Content (%): 5 Unit Weight (pcf):
Conc. Temp. I?F): ~ Ambient Temp. (°F): 6.---' Yardage (c.y.): 12 of 12
Placement Location: Paving at Club House Parking Area
Sample Location: Center portion of Paving at Club House Parking
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYLINDERS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C39. CAPPED PER ASTM C123t
Set # Age Max Load Strength
Cylinder # Test Date Area (sq.in) Notes
1 (Days) (lbs) (psi)
113001 12/7,'00 7 110150 28.27 3900
113002 12/28/00 28 141180 28.27 4990
113003 12/28/00 28 153340 28.27 5420
KAR
113004 Discard
~1 ~ NORMAL CYI_INDER SIZE 6" X 12". AREA 28.27 sq. in., UNLESS NOTED ABOVE.
~2'~ UNBONDED CAP SYSTEM USED UNLESS OTHERWISE NOTED ABOVE.
(31 FIELD TESTS .\RE PER APPI.ICABLE ASTM STANDARDS: C!3g. Cia_L C,'. 72. C231
Page I of 1 CME Manager- Dallas
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.