Gunner P2-LR001211 TER~4~-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT I-~,'ORTH HOUSTON LONGt"IEW .4USTIN
11050 Ables Lane. Dalla.s. Texas 75229 Phone.'972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Comnmnities - Kurt Helnbeckcr
REPORT DATE: 12:11.00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-104 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 11.10.00
Slump (in.): 1 - < Sampled By: C. Kalu
Air Content {%): 3 - 6 Weather: Clear
Concrete Temp (=F): .s,s-9~ Supplier-Mix: TXI .. 8203
FIELD DATA: SET #1
Ticket #: 27~4809 Time Batched: .. 10:t I _.\M Time Sampled: 11:00 AM
Slump (in.): 4 1 2 Air Content I%,}: 4.8. Unit \Veight tpcI): N:A
Conc. Temp. t:F): 70 Ambient Temp. I:F): 56 Yardage Ic.y.l: 19 c.v.
Placement Location: Paving
Sample Location: A. pproximately 60' North & 60' West of Southwest corne:' of building --.3.
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOLDED AND C",.RI!D PER ASTM C31. TESTED PER ..\STM ('.'.9. CAPPED P!'!R .-\STM (":23 I
Set= ~ Age Max Load Strength
Cylinder ~. Test Date Area (sq.in) Notes
I (Days) (lbs) (psi.I
11 1001 1 I..:17;'00 7 ,'7"3280 28.27 2590
I 11002 12."8/00 28 106620 28.27 3770
111003 12;8;'00 28 120030 28.27 4250
IC'&R
14 1.094 Discard
(!) NORMAL CYI_INI-)I;I~ .SIZE ,.'," X ! 2"..-\[,~EA 28 '- >q m. 1 '\I.I_:SS \'()TED .-\BO\"E.
(23 UNBONDED (.'.\P SYSTEM i '.gild i.'NLESS OTHI!RWINE \(')TED .\B()VE.
(31 F1ELD -FESI'S .-\RE I'ER .-\PPLIC.\ItI.E ..\STM ST \\D.\I~DS,- ('12$. ("1-3. (". 72. (.'231
sd " ' -' l,sloo
CME Manager - Dallas
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.