Gunner P2-LR001207 TERRA-MAR. [NC. '-'
GEOTECHNICA,. ENVIRONMENTAL _~ND *IATERJALS ENGINEERS
DALL,dS FORT WORTH HOUSTON LONGI-'IEW ,4USTIN
1 !('150.4bles Lane. Dallas. Texas~5.-' z- ~ ~9 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Commumnes Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 12. -:-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-105 Cit3~ of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 11 29-00
Slump (in.): 4 to 5 Sampled By: A. Haves
Air Content (% }: 3 to 6 Weather: Sunny
Concrete Temp ~':FI: 100 Supplier.-Mix: TXI 8203
FIELD DATA: SET #1
Ticket ~: ?84598 Time Batched: 9:26 AM Time Sampled: l 1:30 AM
Slump {lin. }: ~ 1 2 Air Conteut I%}: 4 Unit Weight Cpct'}: N."A
Conc. Temp. I :F }: -0 .-\mb~ent Temp. I ~F): 6._~'- Yardage { c.y. } 10 of 10
Placement Locanon: Paving tbr club house parking
Sample Location: Paving for club house parking
Remarks:
CONCRETE COMPRESSION TEST RESULTS
( h-I .iNDERS MOLDED AN[) t I RED PER .\STM C3 ',. TESTED PER ASTM C39. ('APPED PER .\S'I-M ('2231
Set *; Cylinder .=' Test Date Age Max Load Strength Notes
I ' (Days) (lbs) Area (sq.in) (psi)
112901 12;6;00 -.' 64780 28.27 2290
112902 12.'27.."00 28
i 12903 1227;00 28
IC~kR
! ! 2904 Hold
NORM..\ L CYLINDER 'c, IZE ~,". X : 2"..-\REA 2q..2- ~,.~ m. ~. 'N'. ~_cb.h~ N()TED ABOVE
UNBONI)ED ('AP :-;'r'STES. I t.'SIiD UNLESS OTI IFRWISI~ x.()TEl) .-\B{.)\-'E.
ELD TESTS .-\RF PI.R x'~, . ..
.: I ~_:( .\EIL. E .\S'['\-I S !.'..\D.\RI'>5; ('i ~.q.(']43. C'172. C27!
Page I of I CML Manager - Dallas
Note: This report is for the exclusive use 'of the client addressed. This report may not be reproduced except in its
endr.:y, without the written consent of TMI. Results apply only to above tests.