Gunner P2-LR001002 (2) TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALL.4S FORT I'I'ORTH HOUSTON LONGI"IEW ..,Il_'STIN
,: ]t;St~.4bie.~- Lane. Dalla.~ ........ To:fas 75229 Phone.'972-488-8800 Far-O-"-.~'g-,S.
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North Alnerican Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 10 '2'00 C.D. Construction - Garreth Campbell
TMI REPORI #: D('00-040-095 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psil: 3000 Placement Date: 9 1-00
Slump (in.l: 1 - 5 Sampled By: ('. Kalu
Air Content ¢!o): '- - 6 Weather: Clear
Concrete Temp i~?F ~: 95 Supplier.-Mix: TXI
FIELD DATA: SET #1
Ticket V: 27254'73 Time Batched: 6:43 AM Time Sampled: 7:45 AM
Slump (in.): N A Air Content (%): 4_.2s Unit \Veight {pcf): N."A
Conc. Temp. I~Fl: 97 Ambient Temp. (':F): 98 Yardage lc.3'.): 20
Placement Location: Pax mg
Sample Location: Approximately 20' N & 35' W of SW comer of Building
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('h'i. IN:)~'R:-, MOLDED AND ('~ 'RED PER ASTM (31. TESTED PER ASTM C39. CAI"PED PEI~, ASTM (Z 22.
Set # A~e Max Load Strength
9 Cylinder r: Test Date ~ .Area (sq.in) ~ Notes
_ ~ Day's) (lbs) (psi)
090105 9.-'8;00 7 68150 28.27 2410
090106 9.'29'00 28 89540 28.27 3170
090107 9'29/00 28 87450 28.27 3090
KAR
0901 (.18 Discard
~:, NORMAL CYLINDER SIZE ~," X '..:"". AREA 28.27 .-,q. :n.. UNLESS NOTED ABOVE
~2, UNBONDED (.'..%P SYS'I-EM [ 'SED UNLESS OTHI!R\VISE NOTED ABOVE
.........a, FIEI D TEST'-; .AP, k PER ..\PPLI('AIILE ASTM
Gar)' D.
-Page I of 3 CME Manager- Dallas
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT H'ORTH HOL-'STON LO.\'GI'IEW AUSTIN
i /tlSO.41#ea Lane. Dtdlas. Texa~ 75229 Phone.'972-486'-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: Nol-th American Corm~unities Archon Group - Angie Rawe
PROJECT: Karrmgmn Apartmems North American Communities - Kurt Heinbecker
REPORT DATE: 10 2 '00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-095 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (.psi): 3300 Placement Date: 9-'1 '00
Slump (in. 1: i - 5 Sampled By: C. Kalu
Air Content (.° o.}: 3 - 6 Weather: Clear
Concrete Temp (:F): ~ Supplier."Mix: TXI
FIELD DATA: SET #2
Ticket .~: .~ .-~. 9_,0 Time Batched: 10:02 AM Time Sampled: 11:01 AM
Slump {in.): ~ .-\ir Content (%): 5.8 [.-nit Weight {pcf): N.~A
Conc. Temp. {~-F): 100 Antbient Temp. (~F): 103 Yardage lc.3'.): 150
Placement Location: Paving
Sample Location: Paving: approximately 20' N & 30' W of SW corner of Building =14
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('Y L.i'ql)I:R:', MO[_DED AND ('1 :RED PER ASTM ("3!. TESTED PER AS'i-M C39. ('APPED PER .-\STM ('i 231
Set # Cylinder = Test Date Age Max Load Area (sq.in) Strength Notes
3 (Days) (lbs) (psi)
0901 (i9 9."8,:00 7 67890 28.27 2400
090110 9.'29/00 28 85640 28.27 3030
090111 9'29/00 28 92970 28.27 3290
IC4,R
0901 12 Discard
,! { NORMAL CY[.INDER SIZE ~" X 12". ARE.-\ 2F,.2'~ sq ,n.. UNI_ESS NOTED ABOVE
,2~ UNBONDEI) ('AP Sx.'S'! EX-; IJSED UNLESS OTHER\: !SE NOTED ABOVE.
~3, FIELD TESTS ARE PER ..\PPLI('ABI_E AS'i"M S'I'.-\NI)..xRDS. C{ 38. ( 14.:. ( , · .;. ( .:_.
,~d GaD' D. Dry,
Page 2 of 3 CMS Manager - Dallas
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERR~4-MAR, INC.
GEOTECHNICA,~ ENVIRONMENTAL AND MATER~:~LS ENGINEERS
D.4LL4S FOR T I-t'OR TH HOL:STO:V LOA G I 'IEI'I' .4 USTIN
i /tiStt.qble.~ Lane. Dal[a.~. Te.¥a.~ "5229 Phone.'972-455~$$O0 Fax.'g72-458-8080
CONCRETE INSPECTION AND COMPRESSION TESI REPORT
DISTRIBUTION:
CLIENT: North American Conm~uniues Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 10 2 00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-095 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 9-1'00
Slump (in.l: I - q Sampled By: C. Kall~
Air Content (%}: n - 6 Weather: Clear
Concrete Temp (:Fl: 95 Supplier.'Mix:
FIELD DATA: SET #4
Iicket ~: 2726282 Time Batched: 12:56 PM Time Sampled: 1:50 PM
Slump (in.): O 1 2 Air Content {"i,): 4.75 [.7nlt Weight (pcf}: N..'A
Conc. Temp. (::Fl: ~ Ambient Temp. (°F'I: 102 Yardage (c.y.):
Placement Location: Paving
Sample Location: Approximately 40' \V & 20' N of NW corner of Building ~:14
Remarks: *Indicates that the 28 day strength does not meet the required specifications.
CONCRETE COMPRESSION TEST RESULTS
('YI_I\I)LRS MOLDED AND ('[ 'RI(1) PER ASTM C31 TESTED PER Ab'I'M (.'39. ('AI>PED PER .-\S. M £ , 231
Set # .Age Max Load Strength
Cylinder ~ Test Date Area (sq.in) Notes
4 IDays) (lbs) (psi)
090113 9.'8,'00 7 57550 "8
_ .z. 2040
090114 9.'29,'00 28 80390 28.27 2840*
090115 9"29/00 28 81050 ~8.2 ,' 2870*
KAR
090116 10.-"27100 56
(I ', NORMAL CYLINDFR .',;IZF o" X i2". AREA 28.2- sc m. UNLESS NOTED ABOVE.
(2~ UNBONDED ('AP SY.'-i'I'!SM -',.'SED UNLESS OTi !k R\VI.$,E NOTED ABOVE
1'3~ FIELD TESTS ..\ RI:. PI:R AIq'LI('ABLE ASTM S'2 A'qD.-\RDS: ('! 38. (' 143. ( .... (_:l
sd Gan D Dh,
Page 3 of 3 CME Manager - Dallas
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.