Loading...
Gunner P2-LR000921 (2) '- TERRA-MAR, INC. '- GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS D.4LLAS FORT WORTH HOUSTON LONGVIEW AUSThV 11050 Ables Lane. Dallas. Tt:x'as 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9-'21.00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-095 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 9'1 00 Slump (in.): I - 5 Sampled By: C. Kalu Air Content (% ~: 3 - 6 \Veather: Clear Concrete Temp ~ ~F I: 9_~~ Supplier.-Mix: TXI FIELD DATA: SET #1 Ticket -7.: 2725473 Time Batched: 6:43 AM Time Sampled: 7:45 AM Slump (in.): N A Air Content I%~: 4.5 Unit Weight Ipcf): N..'A Conc. Temp. (~F~: 97 Ambient Temp. (~F): 98 Yardage ~c.y. ~: 20 Placement Location: Paving Sample Location: Approximately 20' N & 35' W of SW comer of Building --'13 Remarks: CONCRETE COMPRESSION TEST RESULTS C':'I_INDERS MOLDED AND ('UI~,kD PER ASTM ('3 I. TESTED PER AS'tM C39. ('APPED PER ASI'M C: 231 Set # Age Max Load Strength Cylinder ~- Test Date Area (sq.in) Notes 1 (Days) (lbs) (psi) 090101 9/8/00 7 68150 28.27 2410 090102 9."29/00 28 090103 9.-'29/00 28 KAR 090 104 Hold t.I ~ NORMAL. CYI.INDER SIZE ,'," X :2". AREA 28.2~ .~q. 'n.. UNLESS NOTE[) ABOVE ~2) UNBONDED CAP SY~-I'EM I'SED L'NLESS OTiIERWISE NOTED ABOVE ~3, FIELD TESTS ARE PER Al'I'Ll( ABLE ASTM STANDARDS. C]38. ('143, C]72. C23'. sd Gary D. Dry, Page 1 of 3 CME Manager - Dallas Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. '- TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LO:¥GFIEW .4 USTL¥ 11050 Ables Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBL-TION: CLIENT: North American Conm~unities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9-21.-00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-095 CiR' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength Ipsi): 3000 Placement Date: 9.'1.00 Slump lin. l: I - 5 Sampled By: C. Kalu Air Content ~'?',,!: ~- - 6 Weather: Clear Concrete Temp (:F): 95 Supplier'Mix: TXI FIELD DATA: SET #2 Ticket ~: 2725930 Time Batched: 10:02 .-\M Time Sampled: 11:01 AM Slump (in.J: 5 Air Content t%): 5.~8 Unit Weight lpc¢): N.-A Conc. Temp. f':Fl: 1()(~) Ambient Temp. (°F): 103 Yardage {c.y.l: 150 Placement Location: Paving Sample Location: Paving: approximately 20' N & 30'W of SW corner of Building el4 Remarks: CONCRETE COMPRESSION TEST RESULTS CYI.INDERS MOLDED AND (!_ RED PER ASTM C31,TESTED PER AS'FM t'39. C.-\PPED PER ASTM £']231 Set e Age Max Load Strength Cylinder =. Test Date Area (sq.in) Notes 3 (Days) (lbs) (psi) 090109 9/8/00 7 67890 28.27 2400 090110 9/29/00 28 090111 9/29i00 28 ICAR 090112 Hold (i ~ NORMAL CYLINDER SIZE (¢' X 12"..AREA 28.2- sq. :n.. UNLESS NOTED ABOVE. ~2~ UNBONDED CAP SYSTEM t. SED UNLESS OTHER\VISE NOTED ABOVE. (3'~ FIELD TESTS -\RE PER .-\PPI_I('ABLE ASTM ST.\ND.ARDS: ('138. ('i-1.3. (_'!72. C231 Gar}' D. . Page 2 of 3 CME Manager - Dallas Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGI,'IEW .4 USTIN 11!)50,4hies Lane. Dallas. Tt:xas 75229 Phone.'972-488-$800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9.-21 00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-095 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 9.-'1.00 Slump (in.): I - 5 Sampled By-': C. Kalu Air Content /°,,~: 2 _ 6 Weather: Clear Concrete Temp ( :F ~: 95 Supplier.-Mix: TXI FIELD DATA: SET g4 Ticket ~.... ,_~-r'wo,~'>. ~,,_,:_ Time Batched: 12:56 PM Time Sampled: 1:50 PM Slump (in.): 6 1 2 Air Content (%): 4.75 L'nit \Veight (pcB: N-A Conc. Temp. t':F): 9._E~ Ambient Temp. (=F): 102 Yardage (c y. ): 250 Placement Location: Paving Sample Location: Approximately 40' W & 20' N of NW corner of Building ~14 Remarks: CONCRETE COMPRESSION TEST RESULTS ("¢LI\I')I:?,S MOLDED AND t '! 'RED PER ASTM ('3 I. I'ESTED PER ..\:4T\l ("3'). ('APPED Pi_:R .kSTN1 (': 231 Set ~ Cylinder v. Test Date Age Max Load Area (sq.in) Strength Notes 4 (Days) (lbs) (psi) 090113 9.."8:"00 7 57550 28.27 2040 090114 9/29/00 28 0901 l 5 9/29/00 28 IC'AR 090116 Hold (i ~ NORMAL CYLINDER blZE ~" X 12", AREA 2S 2- :,,~. :n.. UNLESS NOTED ABOVE ¢2~ I_,:NBONI'JED (,'.-\P SYS'I'EM USED UNLESS O'I'HERV~'!.SE NOTED .-\BOVE. ,3'~ FIELD TESTS ARE PER ..\PI LI('ABLE ASTM S'- \ND.-\RDS: C'; *.,.1. C~:3. ('172. ('231 Page 3 of 3 CME -:Manager- Dallas Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.