Loading...
Gunner P2-LR000918 (2) TERRA-MAR. INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOL~STON LONGVIEW .4USTIN l i050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-$080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9. 18.-00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-074 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8."10."00 Slump (in.): 4 - 6 Sampled By: E. Jennings Air Content I'%'): N A Weather: Clear Concrete Temp (:F): N A Supplier Mix: TXI.'9505 FIELD DATA: SET #1 Ticket .-.: 2'705955 Time Batched: 6:07 AM Time Sampled: 7:10 AM Slump ('in.): 7 I '2 Air Conteut {"o): N-'A L-nit Weight ~pct): N-'A Conc. Temp. i -'F): 88 Ambient Temp. {:Fl: 84 Yardage (c.y.): 90 c.y. Placement Location: Building pad .---. 15. center of pad - 20' W & 10' S of middle of'pad Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ( Y LiNDERS \IOLDED AND CURED PER ASTM C3i. FES'i-ED PER ..\bi'M ('39. ('Ai'I'ED PER ASTM (_'1231 Set # Age Max Load Strength Cylinder .e. Test Date Area (sq.in) Notes 1 (Days) (lbs) (psi) 081001 8/17/00 7 68610 28.27 2430 081002 9/7/00 28 97 180 28.27 3440 08 1003 9/7;'00 28 95120 28.27 3360 KAR 081004 Discard (1) NORMAL ('YI_INDER SIZE 6" X 12". AREA 28 27 sq. in.. UNLESS NOTED ABOVE. (2) UNBONDED ('AP SYSTEM USED L'NLESS O'['HERWISE NOIED ABOVE. t3.~ FIELD TESTS .\RE PER .\PI~I_I('ABLE ASTM STANDARDS: C138. ("!43. C1 z2, ('231 sd arx D Dr,,. Page I of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS D.dLLAS FOR T WORTH HOUSTON LONGFIEW .4 USTIN 11050.4bles Lane, Dallas. T¢:¥a$ 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9."18'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-074 City ofCoppell - Greg Sones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8.'10:00 Slump (in.): 4 - 6 Sampled By: E. Jennings Air Content (%}: N. A Weather: Clear Concrete Temp t':F): N. A Supplier'Mix: TXI '9505 FIELD DATA: SET #2 Ticket #: 2706146 Time Batched: 7:48 A.X.-I Time Sampled: 8:35 A.M Slump (in.): fi Air Content ~%): N-A Unit Weight ~pcf): N.'A Conc. Temp. (:F): 90 Ambient Temp. I:F): 89 Yardage lc.y..! 160 c.v. Placement Locanon: Building pad .--.15. S. end of pad - 30' N & 10' E from S\V comer of building Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YI .:NDERS MOI_DED AND ('I,'RED PER AS'i'M ~'3 ~. TESTED PER ASTS, i ('_;9. ('.-\l?fff) PER ASTM (':2_" I Set a Age Max Load Strength Cylinder .=." Test Date Area (sq.in) Notes 2 (Days) (lbs) (psi) 081005 8.-'17/00 7 73480 28.27 2600 081006 9/7/00 28 105990 28.27 3750 081007 9/7/00 28 103860 28.27 3670 IC&R 081008 Discard (I ~ NORMAL CYLINDER SIZE O" X I~'' AREA 28.27 sq. m.. UNLESS NOTED ABOVE. (.2) UNBONDED CY.P SYS'I'I~M USED UNLESS O'FHERWISE NOTED ABOVE (3:.. FIELD TESTS ARE P!iR .\PPI_I('..\BI.E AS'FM S'I'.-XNi').-\RDS- ~d / Ga~' D. Dry, Page 2 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW .4L.'STIN 1 !050,4bles Lane. Dallas. Tt:ras .. '5 ~9 Phone:972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrmgton Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9-18.-00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-074 Ci¢' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): ?,-000 Placement Date: 8.'10.00 Slump (in.,}: 4 - 6 Sampled By: E. Jennings Air Content (% }: N .-\ Weather: Clear Concrete Temp (:F;: N-A Supplier'Mix: TXI. 9505 FIELD DATA: SET #3 Ticket ~: 2?06434 Time Batched: 10:22 AM Time Sampled: 11:00 AM Slump (in.): 6 Air Content i°o): N.'A Unit Weight lpcf} N..'A Conc. Temp. ~fF`}: 96 Ambient Temp. ~°F) 96 Yardage lc.3,..}: 80 c.v. Placement Location: Building pad --.15. N. end of pad - 10' S. & center from NW corner of building Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YI .'."/[)ERS MOI.DED AND ~ '! Rk D PER ASTM ('_~ i. TESTED PER ASTM C30. CAPPED PER AS'I-*I ( ': 22- I Age Max Load Strength Set .=.' Cylinder 4 Test Date Area (sq.in) Notes 3 { Days) (lbs) (psi) 081009 8,'17.."00 7 79090 28.27 2800 0810 l 0 9.-"7.-"00 28 104310 28.27 3690 081011 9.-"7.-"00 28 113450 28.27 4010 ICAR 08 ! 012 Discard { 1 ) NORM.-kL CYLINI)ER SIZE ,3" X 12". AREA 28.27 sq :n.. UNLESS NOTED ABOVE 12) L:NBONDED CAP SYSTEM t.'SED .',_.-``/LESS O'[-HER\V[SE NOTED ABOVE. (3~ FIELD TESTS .&RE. [-_-R .-\1 i I_I('.\BI,E ASTM S'I- \nil) \RDS: C 3R, Ci?, C172, ('231 Drv, Page 3 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.