Gunner P2-LR000918 (3).... TERR~-MAIL INC. --
GEOTECHNICA~ ENVIRONMENTAL AND MATEgt,,.-xLS ENGINEERS
DALL.4S FORT t. VORTH HOUSTON LONGVIEW .4USTIN
11050.4bles Lane. Dallas, Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 9-'18.'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-077A City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DAIA
Streneth (psi'): :00 .. Placement Date: 8."14-'00
Slump (in. }: x - q Sampled By: M. Yahyazdeh
Air Content {% }: "- ~ Weather: Clear
Concrete Temp t:F) 85 to 95 Supplier. Mix: TXI. 9505
FIELD DATA: SET #1
Ticket #: 2708240 Time Batched: 6:27 AM Time Sampled: 7:30 AM
Slump (in.): 5 1 2 Air Content I.%): N.'A Unit Weight ~pcf~: N.."A
Conc. Temp. (°F'}: 90 Ambient Temp. (cF): 90 Yardage (c.y.): 80 -' 290
Placement Location: Slab on Grade - Budding 16
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CY.'..iNI)ERS MOLDED AND CURED PI:'.R ASTM C3I. 'TESTED PER ASTM C39. C.-\PPED PER ASTM (".231
Set # Age Max Load Strength
Cylinder .=.' Test Date Area (sq.in) Notes
1 (Days) (lbs) (psi)
081401 8/21i00 7 86000 28.27 3040
081402 9il 1.,'00 28 122020 28.27 4320
081403 9/11/00 28 118490 28.27 4190
ICAR
081404 Discard
NORMAL CYI_INDER SIZE ,'4' X 12". AREA 28 2" .--q. m.. UNLESS NOTED ABOVE.
UNBONDED CAP SYS I'EM USED UNLESS OTHERWISE NO'I-ED ABOVE.
FIELD -TESTS ARE PERAI?I.ICABLEASTMSTAND~RDS:("lo~.C,-~.('R ~" "~,-.C23~
~d Gary D. Dry,
Page l of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
- TERIL~k-MAR, INC. -
GEOTECHNICAL ENVIRONMENTAL AND MATERI:xLS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGI,TEW AUSTIN
11050.dbles Lane. Dallax. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 9.'18. O0 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-077A CRT of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 8 14.'00
Slump (in. ~: 3 - ~ Sampled By: M. Yahvazdeh
Air Content t°'ol: 2 _ ~ Weather: Clear
Concrete Temp laF}: 85 to 95 Supplier.- Mix: TXI. 9505
FIELD DATA: SET #2
Ticket .~: 2708363 Time Batched: ""~",..~. AM Time Sampled: 8:35 AM
Slump ('in.): 5 I 2 Air Content i%~: N-'A Unit Weight Ipcf): N.-'A
Conc. Temp. i:'F: 02 :\mbient Temp. ~=F): 92 Yardage I c.y.): 160 ." 290
Placement Location: Slab on Grade - Building 17
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOI_DED AND ("URI!D PER :\SIM C31. 'rESTED PER .\S'i-M C'39, C.:\PPED PER .-\STM C! 22 [
Set ~ .&,,e Max Load Strenmh
Cvlinder v_. Test Date Area (sq.in) Notes
2 (Days) (lbs) {psi)
08 l 4(.)5 8."21 .."00 7 75140 28.27 2660
081406 9.-'ll.-"00 28 124280 28.27 4400
081407 9.'11/00 28 121770 28.27 4310
KAR
081408 Discard
(.I~ NORMAL CYLINDER SIZE 6" X 12", .&REA 28.2.7 :,em.. UNLESS NOTED ABOVE.
{2) UNBONDED CAP SYSTF:M USED tJNLESS OTHER\VISE NOTED ABOVE.
1'31 FIELD TESTS .ARE PER \PIq.I('ABI_.E ASTM 5q'~ ..... · ' ~' "~ ~ ~
.. AND \RD,',. (2, :8. ( . 4.,-. (_ ~ 72. (-'23
Gary D. Dr3',
Page 2 of 3 Project .Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC. -
GEOTECHNICA,_, ENVIRONMENTAL AND MATER~,,LS ENGINEERS
D.dLL,4S FORT WORTH HOUSTON LONGFIEW ,4USTIN
11050.4bles Lane. Dallas. To:vas 75229 Phone.'972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION' TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 9' 18-O0 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-077A Ci~.' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (.psi): 3000 Placement Date: 8 14.'00
Slump (in.): 2 - < Sampled By: M. Yahvazdeh
Air Content (%): ~ - ~ Weather: Clear
Concrete Temp i:F~: 85 to 95 Supplier Mix: TXI 9505
FIELD DATA: SET//3
Ticket ~;' 270840'7 '/ime Batched: 8:35 A.M Time Sampled: 10:00 AM
Slump (in.): 6 Air Content ¢%): N-A Unit Weight ~pct'): N."A
Conc. Temp. I:F'}: O~- .\mbient Temp. (~F): 92 Yardage ~'c.y.): 260 ..' 90
Placement Location: Slab on Grade - Buiktmg l-
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYL'.N DERS MOLDED AND CURED PER AS'I'M (_"3 I. TESTED PER ASTM C79. ('.-\PPED PEP, ASTM C I231
Set ~ Cylinder ~: Test Date Age Max Load Area (sq.in) Strength Notes
3 (Days) (lbs) (psi)
081409 8.21/00 7 85970 28.27 3040
081410 9..'11/00 28 117000 28.27 4140
081411 9.-'I 1/00 28 115780 28.27 4100
KAR
08 l 412 Discard
(I.~NORM&LCYI_ NDF.{SIZE6"X 12". AREA 28.2- sq m..L'NLESSNOTEDABOVE.
~ ~ L'NBONDED ('..'si' '-;YS FEM (. SE[) UNLESS O'I't~I£RWISE NOTED ABOVE.
(3~ FIELD I'ESTS .\RE PER \PP!.K' \BI.E ASI'M ST.\'\ f) \Ri')S C': 3,~. (_':43. (7172. ('23:
Page 3 of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.