Loading...
Gunner P2-LR000918 - TERIL&-MAR, INC. - GEOTECHNICA~ ENVIRONMENTAL AND :MATEI~.xLS ENGINEERS D,4LL,4S FOR T WORTH HOUSTON LONG VIEW .4 USTIN i1050 Ables Lane. Dalhm Texas 75229 Phone.'972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9 18 00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-083 CiD' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength ipsi~: 3000 Placement Date: 8.16."00 Slump {in.): ~' - ~ Sampled By: 5i. Yahvazdeh Air Content (%): N A Weather: Clear Concrete Temp I :'F): FIELD DATA: SET #1 Ticket #: 2710799 Time Batched: 5:53 AM Time Sampled: 7:00 AM Slump (in.): 4 l 2 Air Content ~%): N.-'A Unit Weight lpcf): N.'A Conc. Temp. ~ ?F'}: 91._2) .\mbient Temp. (:'F): N.-A Yardage I.c.y. I: 40 ' 300 Placement Location: Slab on Grade - Building V:l S Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YI.INI)I~RS MOl_DEl)AND ('URED PER ASTM ('31. TESTED PER ASTM C39. C:\I~PED PER AST\I C'.23i Set ~ Age Max Load Strength Cylinder -~ Test Date Area (sq.in) Notes 1 fDays) (lbs) (psi) 081601 8/23/00 7 92860 28.27 3280 081602 9/13.."00 28 121510 28.27 4300 081603 9;13/00 28 128670 28.27 4550 ICS. R i N()RMAL CYLINDER SIZE a" X 12". AREA 28.2- sq in.. UNLESS NO'rED ABOVE. t2~ UNBONDED CAP SYSTEM t. SL:D UNLESS OT[ I[-:R~VISE NOTE[) ABOVE ,3~ F1EI_D TESTS ARE I ER .\1 I ...ICABLE ASTM ST.-\NDARDS: ¢'138. ('24_'-. ('1~2. C231 scl ~~&~~ Page 1 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. - GEOTECHNICAL ENVIRONMENT:-~L AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGV[EI-F AUSTIN /1050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION': CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt H¢inbecker REPORT DATE: 9-'18.00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-083 City of Coppell - Greg Jones SPECIFICAIIONS PROJECI DAIA Strength (psi'): }000 Placement Date: 8.-16 00 Slump (in.): '- - '~ Sampled By: M. Yahvazdeh Air Content {% ~: N-A Weather: Clear Concrete Temp lf-F): 85 to 95 Supplier'Mix: TXI. 9505 FIELD DATA: SET #2 Ticket .=: 2710936 Time Batched: 7:14 AM Time Sampled: 8:30 AM Slump (in.): 6 1 2 Air Content (%): ,N.-'A Unit Weight (pct'}: N.-'A Cone. Temp. (:Fl: 95 Ambient Temp. (°F}: 95 Yardage fc.v.}: 1,30.270 Placement Location: Slab on Grade - Budding s18 Sample Location: Remarks: CONCRETE COMPRESSION TEST .RESULTS ('YI INDERS M(')LDED AND ('!.'RED PER AS'I-M C31. TESTED PER AS'FM C30. ('APPED PER .-\STM ('123; Set # Cylinder # Test Date Age Max Load Area (sq.in) Strength Notes 2 (Dab's) (lbs) (psi) 081604 8:-'23.;00 7 70740 28.27 2500 081605 9.-'13,"00 28 98410 28.27 3480 081606 9..'13;00 28 103010 28.27 3640 IC4,R (il NORMAl_ ('YI.INDER SIZE ,'¢' X 12". AREA 28.27 st:. il'~.. UNLESS NOTED ABOVE. i2~ UNBONDED CAP SYSTEM USED UNLESS OTHERW!SE NOTED ABOVE. t3., FIELD TESTS ARE PER ..XI'I'I_I('.-XBLE ASTM STANDARDS: CI38. C143. C172. C231 ~e Gary D. Dry, Page 2 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERIL&-MAR, INC. - GEOTECHNICA,~ ENVIRONMENTAL AND MATEI~.~LS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW .4USTIN 11050.4bles Lane. Dalla.s. Tc:tas 75229 Phone.'972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9.-'18.'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-083 C/t3.' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8.-'16.00 Slump (in.): 3 - 5 Sampled By: Y.I. Yahvazdeh Air Content I%): N. A Weather: Clear Concrete Temp t:F): 85 to 95 Supplier.-'Mix: TXI - 9505 FIELD DATA: SET #3 Ticket #: 2711134 Time Batched: 8:57 AM Time Sampled: 10:15 AM Slump (in.): fi Air Content (%): N'A Unit Weight (pc£): N."A Conc. Temp. t:F!: -)..~ Ambient Temp. (°F): 100 Yardage tc.y.): 230:"270 Placement Location: Slab on Grade - Building #19 Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YLINDERS MOLDED AND ( :. RED PER AS'FM ('31. FES'I-ED !'ER ..\*'FM ('39. ('..\PPED PER..\STM L'1231 Set v; Age Max Load Strength Cylinder ~ Test Date Area (sq./n) Notes 3 (Days) (lbs) (.psi) 081607 8/23/00 ? 87820 28.27 3110 081608 9."13/00 28 117000 28.27 4140 081609 9/13/00 28 114290 28.27 4040 KAR (! ~ NORM.-\L ('YLINDER SIZE ~" X !2% AREA 28.27 .,,.q :n.. L'NLESS NOTED ABOVE. ~2.'. UNBONDED (.'.-\P SYSTEM I..:SED UNLESS OTHER'&-ISE NOTED ..\B()\.'E. ~3') FIELD I'ESTS .-\RE I'FR ..\PI'I.I('.-XBI.E .-\STM ST.xND.-\RDS. CI38. (';43. C1'2. ('231 ~d Gary D Dry, -- Page 3 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.