Loading...
WA9302-CS 950428 E~, ~l~lishe,4 > 929 Natgun Coqx-}ration Recast Concrete April 28, 1995 Ebven Teal Rc, Street 'TX 76266 Reference: 6.0 bIG Village Parkway Ground Storage Reservoir NO. 2 Project No. WA-9302 ~' · Ccppell, Texas Bids Due: May 8, 1995 Gent. lemen: We are requesting quotations on various portions of the above-referenced project. The work shall be completed in strict accordance with the plans and specifications entitled, "6.0 MG Village Parkway Ground Storage Reservoir No. 2; Project No.. WA-9302; Coppall, Texas" as prepared by Shimek, Jacobs, & Finklea, 8333 Douglas Avenue, Suite 820, Dallas, Texas 75225, 214-361-7900. Plans and specifications may be obtained at the off~.ce cf the engineer. Quotations are requested on the following items and are to be received in our office at II Teal Road, Wakefield, Massachusetts 01880-1292 not later than 10:00 a.m., CDT~ Monday, May 8, 1995. The project will be constructed in 1995 and completed in 1996. !T__E}L!E_z__~._l_e._c.~.t__r_i_c__a._n..d Telemeterinq - LUblP SUM ITEM: Work to be performed under this item includes furnishing all ':labor, materials, e~~%, .a~ indian:tam,on of* the':~ank. ~er level c~a/~-..~..g., p~=~'l'!}en-ses, etc. to~' provi6e-=~a ~plete, complet'e ..... a~cor~~',:.:'~.~ .... _~he drawings and- s~e~f~cations to . provide a '~'i'~ system. Ma~.~? :~ J. Handrich In conclusion, this Request for~.~ation is intended to cover all electric, lighting, level senslnq, and telemetering ~rk. All applicable sections of the specifications and/or any related specifications required by the contract documents and/or plans shall be adhered to. All permits and fees required for the above-stated work sha~l ~e included in the applicable price. All' applicable wage ra~es shall be applied. Reference is made to the President's Executive Order No'. 11246. Insurance certificates with limits as stated l~n the specifications are required. Please provide separately a cost for performance and payment bond. The attached Confirmation of Quotation sheet shall be completed and delivered via facsimile to Natgun Corporation. If there are any questions regarding the above work, please do not hesitate to contact the writer. Very truly yours, NATGUN CORPORATION Wakefield, MA office Frederick A. McDonough, Jr. Vice President-Construction NATGON CORPORATION FACSIMILE NUMBER: 617-245-3279 ~O_N_F.' I~!~_%_T~9.N QF___Q_U.Q.'.T.A__TI_O_.N_ Reference: 6.0 big Village Parkway Ground Storage Reservoir No~ 2 FrojecL No. WA-9302 Coppell, Texas Bids Due: ~y 8, 1995 UNIT LUMP SUM !.TE_:._~ DESCRIPTION PRICE ~ .... ] E T=~ec~rc and Telemeterin9 ~,,~h4,'~ '~ ~te,.+~.,~. The s,,bcont'ractor will require weeks to complete its work. fh. .-'.hall serve as a confirmation of verbal quotation given on the refere~.-...,u p~:c, ject in accordance with the terms of the request ~2:',,'- -C..c~otation issued by Natgun Corporation dated DATE: