Loading...
Creekview Add PD-CS 871111iaDivl NATHAN D. MAIER CONSULTING ENGINEERS, INC. FILE C0, ¥ Ms. Shohre Daneshmand City of Coppell P.O. Box 478 Coppell, Texas 75019 November 11, 1987 Re: Floodplain Reclamation Report NDM No.: 87-6-62 Dear Ms. Daneshmand: Submitted herewith are four (4) copies of our revised Floodplain Reclama- tion Report for the Creek View Addition in Coppell, Texas. The hydraulic models presented in this report have been coordinated with Mr. Carl Anderson of PAWA-Winkelmann and included the revisions that have been made for the proposed Denton Tap Road bridge, as well as the "as-built" conditions for the Moore Road bridge, a completed fill project downstream from Moore Road, and our proposed Creek View project. The data included in this report are in accordance with Federal Emergency Management Agency (FEMA) requirements for the FIS discharges. Information pertaining to the 100-year ultimate water surface profiles will be submitted in a separate report for review by the City of Coppell. Upon your review and approval of the attached report, we respectfully request tha you forward two copies to FEMA to obtain a letter of map revision. If you have any questions, please feel free to give me a call. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC. Dennis L. Johnson, P.E. DLJ/rdp cc: Bill Thompson Thompson Management Carl Anderson PAWA - Winkelmann Three NorthPark/8800 N. Central Expwy./$uite 300/Dallas. Texas 75231/(214) 739-4741