Loading...
Creekview Add PD-CS 871110DRAFT RECOMMENDED REQUIREMENTS FOR BUILDING. PERMITS ALONG GRAPEVINE CREEK MOORE ROAD TO DENTON TAP ROAD 1) 2) 3) 4) v) s) 9) ~o) ~) Show compliance with city flood plain management ordinance. No fill in the flood plain) t,,---,(./o r' F/,;,,d~'~. Require slope stability and foundation analysis by a qualified geotechnical engineer if within 30 feet of the creek 'bank. Provide surveyed, cross sections and/or preco nsm. tction surveys certified by tkegis~ err, d Public Surveyor. Provide as-built surveys certified by Registered Public Surveyor. Provide' grading and/or construction plans sealed by a registered professional engineer. Show compliance with City-Wide Storm Water MT. anagement Plan including de'tails on proposed erosion control, if required. Show 2- year and ].00-year water surface elevation h~r fully developed land use conditions. Show 2 and 100-year velocities for a fully developed land use condition. Provide structural analysis and details for walls or piers in the flood plain. Provide "Hold Harmless" statement to the City of Coppell on constr~]ction plans. DRAFT BUILDING REQUIR.EM'ENTS IN TH.F_, FLOOD PLAIN EXAMPLE REQUESTS. Swimming Pool 'in the Flood Plain: O Note: You have to have a FNC to have a swimming pool Only breakaway fences or fences parallel to flow 'allowed in the flood plain. The City of Dallas does not allow swimming pools, period. Fence: No unless it can be shown that its not an obstruction, ie. No wood!! Breakaway - that will stay (not float away) or open up and stay parallel. Tennis Court/Basketball Court o Breakaway Fences o Grading Plan - Construction plan certified by Registered Eng/neer