Loading...
Gunner P2-LR000901 TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT It/ORTH HOUSTON LONGVIEW AUSTL, V 11050.4bles Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COlVlPRESSION TEST REPORT DISTRIBUTION: CLIENT: North 3wnerican Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9/1.'00 C.D. Construction - Garreth Campbell TMI REPORT it: DC00-040-064 CiD' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 7."28.'00 Slump (in.): 1 - 5 Sampled By: E. Jennings Air Content (%): 3 - 6 Weather: Clear Concrete Temp (°F): N.-'A Supplier..Mix: TXI FIELD DATA: SET #1 Ticket #: 2694522 Time Batched: 5:31 AM Time Sampled: 6:30 AM Slump (in.): 6_ Air Content (%): 3 1.,'2 Unit Weight ('pcf): N..'A Cone. Temp. (°F): 85. Ambient Temp. (=F): 80 Yardage (c.y.): 60 c.v. Placement Location: Pavin~ lot - North of leasine buildino_ Sample Location: North of leasin~ buildin~o - 25'N & 15' W of SE comer of SE parkin~ spaces Remarks: Slump non-compliant. Mike Ward notified, elected to place concrete CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C39. CAPPED PER ASTM Cf:31 Set # Cylinder # Test Date Age Max Load Strength 1 ' (Days) (lbs) Area (sq.in) (psi) Notes 072801 8/4/'00 7 83940 28.27 2970 072802 8.-'25,."00 28 1 13940 28.27 4030 072803 8/25/00 28 117620 28.27 4160 KAR 072804 Discard (1) NORMAL CYLINDER SIZE 6" X 12". AREA 28.27 sq. in., L.~LESS NOTED ABOVE. (2) UNBONDED CAP SYSTEM USED UNLESS OTHER\VISE NOTED ABOVE. (3) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C 143. C172, C23 l sd d / Gary D. Page 1 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERR~&-MAR, INC. - GEOTECHNICA, · ENVIRONMENTAL .-SAND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW AUSTIN l l050 Ables Lane, Dallas. Texas /.>.:-9 Phone:972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group ~ Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 9;'1.."00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-064 Ci~' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 7;'28/00 Slump (in.): 1 - 5 Sampled By: E. Jennints Air Content (%): 3 - 6 Weather: Clear Concrete Temp (°F): N/A Supplier,'Mix: TXI FIELD DATA: SET #2 Ticket a: 2694~9.. Time Batched: 7:54 AM Time Sampled: 8:50 AM Slump (in.): 8 1/2 Air Content (%): 3 1/2 Unit Weight (pcf): N/A Conc. Temp. ('F): 92 Ambient Temp. (:F): 9_~5 Yardage (c.y.): 160 Placement Location: Paving lot - North of leasine building Sample Location: 30' N & 10' E of SW comer of SW parking_ spaces Remarks: Slump non-compliant. Mike Ward notified, elected to place concrete. CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C39, CAPPED PER ASTM C1231 Set # Age Max Load Strength 2 Cylinder # Test Date (Days) (.lbs) Area (sq.in) (psi) Notes 072805 8;'4/00 7 68020 28.27 2410 072806 8/25/00 28 96090 28.27 3400 072807 8/25i00 28 97020 28.27 3430 KAR 072808 Discard i, 1 ) NOILMAL CYLINDER SIZE 6" X ,a . AREA _~x..:. sq. in., UNLESS NOTED ABOVE (2) UNBONDED CAP SYSTEM USED UNLESS OTHERWISE NOTED ABOVE. (3~. FIELD TESTS A~ PER APPLICABLE ASTM STANDARDS: C138, C ,4o.~ C-~.~, C231 sd Gao' D. Dry, Page 2 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERLa~LS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW .4USTIN 11050 Ables Lane, Dallas, Texas 75229 Phone.'972-488-8800 Fear.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North .&raerican Communities - Kurt Heinbecker REPORT DATE: 9..' 1,'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-064 City_' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength {psi): 3000 Placement Date: 7;28'00 Slump (in.): 1 - 5 Sampled By: E. Jenninzs Air Content (%): 3 - 6 Weather: Clear Concrete Temp (°F): N.."A Supplier.-Mix: TXI FIELD DATA: SET #3 Ticket #: 2694797 Time Batched: 7:54 .'~,\'I Time Sampled: 8:50 AM Slump (in.): 8 1;2 Air Content (%): 3 1."2 Unit Weight (pcf): N..'A Conc. Temp. {°F): 92 Ambient Temp. (°F): 9_~5 Yardage (c.y.): 160 Placement Location: Pavin.o - North access to leasing buildin~ Sample Location: 10' S & 15' E of West expansion, joint to fire lane Remarks: Slump non-compliant. Mike Ward notified, elected to place concrete. CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C3 -',. TESTED PER :\STM C39. CAPPED PER ASTM C1231 Set =,' Age Max Load Strength 3 Cylinder # Test Date (Days) (lbs) Area (sq.in) (psi) Notes 072809 8/4/00 7 71440 28.27 2530 072810 8/25..."00 28 102060 28.27 3610 072811 8/25/00 28 109360 28.27 3870 KAR 072812 Discard I (,1) NOI~MAL CYLINDER SIZE 6" X 12", ARF,A 28.27 sq. in., UNLESS NOTED ABOVE. (2) UNBONDED CAP SYSTEM USED UNLESS OTHF,RWISE NOTED ABOVE. ~d Gary D. D~', Page 3 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.