Gunner P2-LR000831 TERIL&-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW AUSTIN
11050 Ables Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fccr.'972-488-8080
CYLINDER COLLECTION REPORT SHEET
DISTRIBUTION:
CLIENT: North Amaerican Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North ,~nerican Communities - Kurt Heinbecker
REPORT DATE: 8.."31/00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-085A City of Coppell - Greg Jones
CYLINDER COLLECTION REPORT SHEET
On August 19, 2000 TMI representative M. Ardito went to the above referenced project to collect
concrete cylinders that were cast on August 15, 2000. A total of 8 cylinders were transported to the
Dallas lab for proper storage and testing.
Page 1 of 1 . Dr'y, !
Project Manager
Note: This report is for the exclusive use of the Client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.