Gunner P2-LR000831 (2) ' - TERRA-MAR, INC. -
GEOTECHNICA~ ENVIRONMENTAL AND MATE~.,~LS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW ,4USThV
I lOSO Ables Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax:9/,-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group -Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-'31.-00 C.D. Construction - Garreth Campbell
T~II REPORT #: DC00-040-090 Ciw of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): ,3000 Placement Date: 8.23.:00
Slump (in.): 5 +"-I Sampled By.': S. Adli
Air Content (%): 4-_2 Weather: Clear
Concrete Temp (°F): 95 Max. Supplier.Mix: TXI: 8203
FIELD DATA: SET #1
Ticket .~: 2716765 Time Batched: 5:58 AM Time Sampled: 6:30 AM
Slump (in. I: 4 1 2 Air Content ("o): 4._.~ Unit Weight (.pct): N:'A
Conc. Temp. t:F): 85 Ambient Temp. I°F): 80 Yardage (c.y.'): 20..'300
Placement Location: South paving - 300' East of property line. parking lot
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOLDED AND CURED PER ASTM C31. TESTED PER ASTM C39. CAPPED PER ASTM C1231
Set ,~ Cylinder # Test Date Age Max Load Area (sq.in) Strength Notes
1 (Days) (lbs) (psi)
082301 8..-'30/00 7 84870 28.27 3000
082302 9/20/00 28
082303 9/20/00 28
KAR
082304 Hold
( 1 ) NORMAL CYLINDER SIZE 0" X 12". AR. EA 28.27 sq. in.. UNLESS NOTED ABOVE.
12) UNBONDED CAP SYSTEM I_/SF, D UNLESS OTHERWISE NOTED ABO\-'E.
i,3~ FIELD TESTS :\RE PER .-\PPI.IC:kBLE ASTM STANDARDS: C138. ('IX3. (.1 .,. ( __ I
~d Ga~.' D. Drv,
Page 1 of 2 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
-. TERI~4,-MAR, INC. -
GEOTECHNIC.-,_ ENVIRONMENTAL AND MATEIx~.xLS ENGINEERS
D.4LLAS FORT WORTH HOUSTON LONGVIEW AUSTIN
1i050 Ables Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND CO,MPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.31.-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-090 CiW of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): .~000 Placement Date: 8-"23-'00
Slump (in.): 5 - - 1 Sampled By: S. Adli
Air Content (% I: 4-__~ Weather: Clear
Concrete Temp/°F): 95 Max. Supplier.-Mix: TXI .-' 8203
FIELD DATA: SET #2
Ticket #: 2716906 Time Batched: 7:10 AM Time Sampled: 8:20 AM
Slump (in.): fi Air Content I"'oI: 4_ Unit \Veight tpct'): N.-'A
Cone. Temp. (:F): 90 Ambient Temp. ~'¢FI: ~ Yardage Ic.y.): 110.-'150
Placement Location: South paving - 360' East of property line. parking lot
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39. CAPPED PER ASTM C'123!
Set .e; Cvlinder# Test Date Age ,Max Load Strenzth
2 ' ('Days) (lbs) Area (sq.in) - Notes
(psi)
082305 8/30/00 7 60700 28.27 2150
082306 9/20,"00 28
082307 9/20/00 28
ICa. R
082308 Hold
(I ~ NOi'LMAL CYLINDER SIZE O" XI_"". AREA 28.27 sq. ~n.. UNLESS NOTED ABOVE.
(2) UNBONDED CAP SYSTEM USED L'NLESS OTHERWISE NOTED ABOVE.
(3'~ FIELD TESTS ARE PER APPI_I('.-\BLE ASTM ST.-kNDARDS: ¢'t38. C143. CI '72, C231
~ Gar)' D. Dr)',
Page 2 of 2 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.