CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-'3000 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-084 Cit.',, ofCoppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength I psi~: 3000 Placement Date: $'17:'00
Slump (in.): ~ - ~ Sampled By: Moe II
Air Content {%): 3 - ~ Weather: Clear
Concrete Temp ~.:F): 85 tO 95 Supplier Mix: TXI 8203
FIELD DATA: SET #1
Ticket .-.: 27 ! 2158 Time Batched: 5:47 AM Time Sampled: 6:45 AM
Slump {in.l: Z Air Content %1: 4.._22 t:nit \Veight ~pcf}: N.-'A
Conc. Temp. t :'FI: 9(_2 Ambient Temp. (:F'I: 85 Yardage lc.y.): 30.300
Placement Location: Front of building
Sample Location: Stauon 39-96
Remarks:
CONCRETE COMPRESSION TEST RESULTS
(."¢I.INDERs MOLDED AND CURED PER ASTM ('31. 'rESTED PER ASTM ('3O. C,xPPED PER .-xSTM ('~ 2:..!
Set ~ Cylinder ~ Test Date Age Max Load Area (sq.in) Strength Notes
1 (Days) (lbs) (psi)
081701 8..-'24.."00 7 73520 28.27 2600
081702 9."14/00 28 101210 28.30 3580
081703 9." 14/00 28 104970 28.30 3710
KAR
081704 Discard
,1 ~ NORMAL CYI_iNI)ER SiZE t." X :2". AREA ..... sa m.. UNLESS NOTED ABOVE
t2'~ UNBONDED CAP SYSTEM I 'SIiI-) UNLESS o'rl IERWISE NOTED .-\BOVE.
~3~ FIELD '['ESTS ARE PI:R .-\PP!.i('.\BLE ASTM S'I'.-\ND-\I~t.')S: CI38. ('143, t'l:2, C23i
~d Garx D Drx.
Page 1 of 3 Project .Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
GEOTECHNICAL ENVIRONMENTAL :4~ND MATERIALS ENGINEERS
D.4LLAS FORT IFORTH HOUSTON LONGFIEI.F .4 USTIN
//050.4hies Lane. Da/hts. Tcras .75229 Phone.'972-48:g,-8800 Fax.'9?2-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrmgton Apartments North American Communities - Kurt Hembecker
REPORT DATE: 8 30 00 C.D. Construction - Garreth Campbell
IMI REPORI #: DC00-040-084 Ci~' of Coppell - Greg Jones
SPECIFICAIIONS PROJECI DATA
Strength !psi): 3000 Placement Date: 8. 17'00
Slump lin.): ~ - q Sampled By: Mge II
Air Content {%1: '- - q Weather: Clear
Concrete Temp (:F.}: 85 to 95 Supplier Mix: TXI .- 8203
FIELD DATA: SET #2
Ticket #: _ 1_o04 Time Batched: 7:10 ANI Time Sampled: 8:1:, AM
Slump (in.}: 5 Air Content !':'t,): 4_ Unit Weight {pet'}: N..'A
Conc. Temp. (':F): 92 Ambient Temp. I.:'F): 100 Yardage ~c.v.}: 140 300
Placement Location: Front of building ~:9
Sample Location: Station 59-88
Remarks:
CONCRETE COMPRESSION TEST RESULTS
t 'YI .iNDERS \IOLDED AND ( t'RED PER ASTM C_'- i, TESTED PER .-\.'q'l 3.1 (_'30. ('APPED PER ASTM ('! 23 ~
Set A=e Max Load Strength
2 Cylindcr ~- Test Date (Days) (lbs) Area (sq.in) (psi) Notes
081705 8.'24,"00 7 71160 28.27 2520
081706 9-'14.."00 28 I 10270 28.30 3900
081 7(')7 9.-'14.."00 28 104580 28.30 3700
IC&R
081708 Discard
~!i NORMAL CY!_INDFR SIZE h" X '_ . AREA "~ ~- -"
· . , .... ~,.. m.. UNLESS NOTED ABOVE.
12) t!NBONDED ('AP SYS'I'I:M I. SI:D UNLESS OI'I-IER\VISE NOTED :\BOVE.
13) FIELD TESTS ARE PER .\PPI_R.'.\BLE :\STM WF.-\ND.-XRDS ("158. C143. C172, C'23!
sd Gar\ D Dr,,,
Page 2 of 3 Project :Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
t
TERRA-M.&R, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.4LLAS FORT WORTH HOUSTON LONGV1EW ,4L-~TIN
i 1050.4hies Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fa.r:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUIION:
CLIENT: North American Conmmmties Archon Group- Angle Raxve
PROJECT: Karrmgton Apartments North American Communities - Kurt Heinbecker
REPORT DAIE: 8 30. 00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-084 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength I psi): ?-000 Placement Date: 8-17 '00
Slump (lin.}: '- - q Sampled By: Moe II
Air Content {'! o }: 3 - q Weather: Clear
Concrete Temp ~:FI: 8~ to 95 Supplier'Mix: TXI 8203
FIELD DATA: SET #3
Ticket ~': _ 1_464 Time Batched: 8:29 AM Time Sampled: 10:00 AM
Slump (in.}: ~ 1 2 Air Content (°o}: 5.2 Unit \Veight Ipcf}: N."A
Conc. Temp. I ':FI: 95 Ambient Temp. I':F}: 105 Yardage ~ c.y.): 250 -' 300
Placement Location: Front of building ~9
Sample Location: Station 60-83
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('Yi.IN DERS MOLDED AND (':. 'RkD PER AS'I'M (_'3 I. TESTED PER A.';TM (.'~9. CAPPED [>ER .-\bTM ('i 231
Set ~- Age Max Load Strength
3 Cylinder: Test Date (Days) (lbs') Area (sq.in) (psi) Notes
081709 8..-'24;00 7 68470 28.27 2420
0817,,,10 9:14,"00 28 89780 28.30 3170
081711 9.'14/00 28 91880 28.30 3250
IC&R
0817." 12 Discard
(i } NORMAL £'YLINDEF, SIZE :3" X [2". AREA 28.2- >.q.m.. UNLESS NOTED ABOVE.
(2' UNBONDED CAP 5, Y>;':'EM t. SED UNLESS OTIIERWISE NOTED ABOVE.
,.'3 ~ FIELD TESTS ..\RV P!kR .-\l ~ I.I('.\BLE ASTM STAND.-XRDS C i .'-.~. ('i 43. C [ 72. C23 [
sd Gar~ D Dry,
Page 3 of 3 Project ,Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.