Gunner P2-LR000830 (2) GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D,4LL,4S FORT WORTH HOUSTON LONGVIEW ,4 USTIN
11050.,tblex Lane. Dalla.s. Tt:¥as 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8-'30.-00 C.D. Construcuon - Garreth Campbell
TMI REPORT #: DC00-040-084 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength {psil: 3000 Placement Date: 8.'17 00
Slump (in..): 2 _ ~ Sampled By: Moe II
.Air Content I '!,, ~: ~- - '~ Weather: Clear
Concrete Temp (:F }: 85 to 95 Supplier. Mix: TXI '8203
FIELD DATA: SET #1
Ticket ~: ? 12158 Time Batched: 5:47 AM Time Sampled: 6:45 AM
Slump (in. ~: 7 Air Content i%~: 4._.2 Unit Weight I pcf): N.-'A
Conc. Temp. ~ :F ~: 90 Ambient Temp. I °F}: 8_~S Yardage { c.y..~: 30."~00
Placement Location: Front of building --.8
Sample kocation: Station 39-96
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YI.INDERS MOLDED AND ('.'.,'RED PER .-\STM ('3 :, TESTED PER ASTM C39. C'Aiq~ED PER .\STM ("1231
Set ~ A~e Max Load Strenuth
? Cylinder ~ Test Date ~ Area (sq.in) ~ Notes
1 (Days) (lbs) (psi)
081701 8.:24/00 7 73520 28.27 2600
081702 9:14.-'00 28 101210 28.30 3580
08 1703 9--' 14/00 28 104970 28.30 3710
KAR
081 704 Hold
\'ORM.-\I.. CYLINDER SIZF 0" X 2". AREA _8.~ .-,,~ m. UNLESS NOTED ABOVE
UNBONDED ('.-M' SYSTEM USED UNLESS OTIIERWISE NOTED ABOVE.
FIELD TESTS AR\! I'ER .-\PPLI('.-kBI.E ASTM S'FANI).\RDs- CI3~. C'l-'3. ('172. ('23~
Page 1 of' 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.dLLAS FORT WORTH HOUSTON LONGVIEW AUSTIN
11050 Ables Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrmgton Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.'30-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-084 Cib' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi ~: 3000 Placement Date: 8.'17 00
Slump ~in.): 3 - 5 Sampled By: Moe II
Air Content ~ ?.'..'~l: 3 - ~ Weather: Clear
Concrete Temp ~:F): 85 to 95 Supplier. Mix: TXI '8203
FIELD DATA: SET #2
Ticket #: 2712304 Time Batched: 7:10 AM Time Sampled: 8:15 AM
Slump (in. I: 2 .Air Content i%): 4_ Unit Weight ~pcB: N."A
Conc. Temp. I=F~: 92 Ambient Temp. (=F): 100 Yardage I.c.y. }: 140 .-' 300
Placement Location: Front of building
Sample Location: Statiou 59-88
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YI. INI)ERS MOI.DED AND ('I..:RED PER ASTM C3 I. TESTED PER AS-FM C'39. CAPPED PER ASTM ("'!23 i
Set # Cylinder ~- Test Date Age Max Load Area(sq.in) Strength Notes
2 (Days) (lbs) (psi)
081705 8.."24/00 7 71160 28.27 2520
081706 9.."14/00 28 110270 28.30 3900
081707 9.-' 14/00 28 104580 28.30 3700
KAR
081708 Hold
(; ) NORMAl. CY[ INDliR SIZE ;," X; 2"..AREA _,.S 2.7 sq. m.. UNLESS NOTED ABO\-'E.
~2) UNBONI)ED ('.\P 5Yb,'I'EM USED UNLESS OT.q!:RWISE NOTED ABOVE
~3) FIELD TESTS .-\ RI'q P.r:R .\I~PI.IC.\BI.E .-\S'FM ST.-\NDARDS: C 38. ('i43, C172. C231
~,i Gary D. Dry,
Page 2 of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
1- ERILA-MAR~ INC. -
GEOTECHNICAL ENVIRONMENTAL AND MATERL-~LS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW ,4 USThV
11050.4blex Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax'972-488-8080
CONCRETE INSPECTION AND COMPASSION TEST ~PORT
DIST~BUTION:
CLIENT: North American Commnities Archon Group - Angie Rawe
PROJECT: Kamngton Apar~ents No~ American Co--unities - Kurt Heinbecker
~PORT DATE: 830.-00 C.D. Construction - Garreth Campbell
Tb~ ~PORT ~: DC00-040-084 City of Coppell - Greg Jones
SPECIFICATIONS PRO,CT DATA
Suength ~psi): 3000 Placement Date: 8 '17 '00
Slump fin.): 3 - 5 Sampled By: Moe Il
Air Content ~ °a ~: 2 _ 5 Weather: Clear
Concrete Temp ~:F): 85 t0 95 Supplier-Mix: TXI 8203
HELD DATA: SET ~3
Ticket ~: _: 1_464 Time Batched: 8:29 AM Time Sampled: I0:00 AM
Slump (in. }: ~ 1 2 Air Content (%): 5.2 Unit Weight (pct3: N.-'A
Conc. Temp. (':F ~: 9~ Ambient Temp. (°F): 105 Yardage (c.y. ~: 250 ' 300
Placement Location: Front of building ~9
Sample Location: Station 60-83
Rem~ks:
CONCRETE COMPRESSION TEST RESULTS
('X.'l i NDERS MOLDED AND (':.;RI-!D PER ASTM ('31. TESTED PER ASTM ('39. CAPPED PEP, ASTM C'. 23 I
Set .~ Cylinder ~ Test Date Age Max Load Strength
3 ' (Day.'s) (lbs) Area (sq.in) (psi) Notes
081709 8/24/00 ? 68470 28.27 2420
081710 9!14/00 28 89780 28.30 3170
081711 9/14/00 28 91880 28.30 3250
ICAR
081712 Hold
~I~ NORMAL CYL NDE'P, SiZE -',f' X 12". AREA 28.2- sc. in. L. NLESS NO'FED ABOVE
~2) UNBONDED ('.-\P .x.'t'S'I'EM USED UNLESS OTilERWISE NOTED ABOVE.
~'3) FIELD TESTS .S, RE PI_:R .\PP'_I('.\BLE AS'FM STANI).-xRDS: C138. £'143, C172. C231
Page 3 of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.