Loading...
Gunner P2-LR000830 (2) GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS D,4LL,4S FORT WORTH HOUSTON LONGVIEW ,4 USTIN 11050.,tblex Lane. Dalla.s. Tt:¥as 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8-'30.-00 C.D. Construcuon - Garreth Campbell TMI REPORT #: DC00-040-084 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength {psil: 3000 Placement Date: 8.'17 00 Slump (in..): 2 _ ~ Sampled By: Moe II .Air Content I '!,, ~: ~- - '~ Weather: Clear Concrete Temp (:F }: 85 to 95 Supplier. Mix: TXI '8203 FIELD DATA: SET #1 Ticket ~: ? 12158 Time Batched: 5:47 AM Time Sampled: 6:45 AM Slump (in. ~: 7 Air Content i%~: 4._.2 Unit Weight I pcf): N.-'A Conc. Temp. ~ :F ~: 90 Ambient Temp. I °F}: 8_~S Yardage { c.y..~: 30."~00 Placement Location: Front of building --.8 Sample kocation: Station 39-96 Remarks: CONCRETE COMPRESSION TEST RESULTS ('YI.INDERS MOLDED AND ('.'.,'RED PER .-\STM ('3 :, TESTED PER ASTM C39. C'Aiq~ED PER .\STM ("1231 Set ~ A~e Max Load Strenuth ? Cylinder ~ Test Date ~ Area (sq.in) ~ Notes 1 (Days) (lbs) (psi) 081701 8.:24/00 7 73520 28.27 2600 081702 9:14.-'00 28 101210 28.30 3580 08 1703 9--' 14/00 28 104970 28.30 3710 KAR 081 704 Hold \'ORM.-\I.. CYLINDER SIZF 0" X 2". AREA _8.~ .-,,~ m. UNLESS NOTED ABOVE UNBONDED ('.-M' SYSTEM USED UNLESS OTIIERWISE NOTED ABOVE. FIELD TESTS AR\! I'ER .-\PPLI('.-kBI.E ASTM S'FANI).\RDs- CI3~. C'l-'3. ('172. ('23~ Page 1 of' 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS D.dLLAS FORT WORTH HOUSTON LONGVIEW AUSTIN 11050 Ables Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrmgton Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.'30-00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-084 Cib' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi ~: 3000 Placement Date: 8.'17 00 Slump ~in.): 3 - 5 Sampled By: Moe II Air Content ~ ?.'..'~l: 3 - ~ Weather: Clear Concrete Temp ~:F): 85 to 95 Supplier. Mix: TXI '8203 FIELD DATA: SET #2 Ticket #: 2712304 Time Batched: 7:10 AM Time Sampled: 8:15 AM Slump (in. I: 2 .Air Content i%): 4_ Unit Weight ~pcB: N."A Conc. Temp. I=F~: 92 Ambient Temp. (=F): 100 Yardage I.c.y. }: 140 .-' 300 Placement Location: Front of building Sample Location: Statiou 59-88 Remarks: CONCRETE COMPRESSION TEST RESULTS ('YI. INI)ERS MOI.DED AND ('I..:RED PER ASTM C3 I. TESTED PER AS-FM C'39. CAPPED PER ASTM ("'!23 i Set # Cylinder ~- Test Date Age Max Load Area(sq.in) Strength Notes 2 (Days) (lbs) (psi) 081705 8.."24/00 7 71160 28.27 2520 081706 9.."14/00 28 110270 28.30 3900 081707 9.-' 14/00 28 104580 28.30 3700 KAR 081708 Hold (; ) NORMAl. CY[ INDliR SIZE ;," X; 2"..AREA _,.S 2.7 sq. m.. UNLESS NOTED ABO\-'E. ~2) UNBONI)ED ('.\P 5Yb,'I'EM USED UNLESS OT.q!:RWISE NOTED ABOVE ~3) FIELD TESTS .-\ RI'q P.r:R .\I~PI.IC.\BI.E .-\S'FM ST.-\NDARDS: C 38. ('i43, C172. C231 ~,i Gary D. Dry, Page 2 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. 1- ERILA-MAR~ INC. - GEOTECHNICAL ENVIRONMENTAL AND MATERL-~LS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW ,4 USThV 11050.4blex Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax'972-488-8080 CONCRETE INSPECTION AND COMPASSION TEST ~PORT DIST~BUTION: CLIENT: North American Commnities Archon Group - Angie Rawe PROJECT: Kamngton Apar~ents No~ American Co--unities - Kurt Heinbecker ~PORT DATE: 830.-00 C.D. Construction - Garreth Campbell Tb~ ~PORT ~: DC00-040-084 City of Coppell - Greg Jones SPECIFICATIONS PRO,CT DATA Suength ~psi): 3000 Placement Date: 8 '17 '00 Slump fin.): 3 - 5 Sampled By: Moe Il Air Content ~ °a ~: 2 _ 5 Weather: Clear Concrete Temp ~:F): 85 t0 95 Supplier-Mix: TXI 8203 HELD DATA: SET ~3 Ticket ~: _: 1_464 Time Batched: 8:29 AM Time Sampled: I0:00 AM Slump (in. }: ~ 1 2 Air Content (%): 5.2 Unit Weight (pct3: N.-'A Conc. Temp. (':F ~: 9~ Ambient Temp. (°F): 105 Yardage (c.y. ~: 250 ' 300 Placement Location: Front of building ~9 Sample Location: Station 60-83 Rem~ks: CONCRETE COMPRESSION TEST RESULTS ('X.'l i NDERS MOLDED AND (':.;RI-!D PER ASTM ('31. TESTED PER ASTM ('39. CAPPED PEP, ASTM C'. 23 I Set .~ Cylinder ~ Test Date Age Max Load Strength 3 ' (Day.'s) (lbs) Area (sq.in) (psi) Notes 081709 8/24/00 ? 68470 28.27 2420 081710 9!14/00 28 89780 28.30 3170 081711 9/14/00 28 91880 28.30 3250 ICAR 081712 Hold ~I~ NORMAL CYL NDE'P, SiZE -',f' X 12". AREA 28.2- sc. in. L. NLESS NO'FED ABOVE ~2) UNBONDED ('.-\P .x.'t'S'I'EM USED UNLESS OTilERWISE NOTED ABOVE. ~'3) FIELD TESTS .S, RE PI_:R .\PP'_I('.\BLE AS'FM STANI).-xRDS: C138. £'143, C172. C231 Page 3 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.