Loading...
Gunner P2-LR000830 (3) TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGV[EW AUSTIN l l050 Ables Lane, Dallas, Texas 75229 Phone.'972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North .American Communities - Kurt Heinbecker REPORT DATE: 8/30/00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-084 City of Copl~ell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8,'17.-'00 Slump (in.): 3 - 5 Sampled By: Moe II Air Content (%): 3 - 5 Weather: Clear Concrete Temp (°F): 85 to 95 Supplier:Mix: TXI: 8203 FIELD DATA: SET #1 Ticket #: 2712158 Time Batched: 5:47 AM Time Sampled: 6:45 AM Slump (in.): 7 Air Content (%): 4.2 Unit Weight (pcf): N/A Conc. Temp. (°F): 90 Ambient Temp. (CF): 85 Yardage (c.y.): 30:"300 Placement Location: Front of building #8 Sample Location: Station 39-96 Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C3 l. TESTED PER ASTM C39. CAPPED PER ASTM C123 ~ Set # Age Max Load Strength 1 Cylinder # Test Date (Days) (lbs) Area (sq.in) (psi) Notes 081701 8/24/00 7 73520 28.27 2600 081702 9/14/00 28 081703 9/14/00 28 KAR 081704 Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., UNLESS NOTED ABOVE. (2) UNBONDED CAP SYSTEM USED UNLESS OTHERWISE NOTED ABOVE. (3) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138, C143. C172. C231 ~/Gary D. Dry, ~ Page 1 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. - GEOTECHNICA~ ENVIRONMENTAL AND MATERa.~LS ENGINEERS DALLAS FORT ~VORTH HOUSTON LONGVIEW AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North Mnerican Communities Archon Group -Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8/30/00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-084 City. ofCo00ell - Gre.e Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8/17/00 Slump (in.): 3 - 5 Sampled By: Moe II Air Content (%): 3 - 5 Weather: Clear Concrete Temp (°F): 85 to 95 Supplier/Mix: TXI / 8203 FIELD DATA: SET//2 Ticket #: 2712304 Time Batched: 7:10 AM Time Sampled: 8:15 A/vi Slump (in.): 5 Air Content (%): 4 Unit Weight (pcf): N/A Conc. Temp. (°F): 9._~2 Ambient Temp. (°F): 100 Yardage (c.y.): 140 ;' 300 Placement Location: Front of building #9 Sample Location: Station 59-~88 Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39. CAPPED PER ASTM Ct23t Set # Age Max Load Strength Notes 2 Cylinder # Test Date (Days) (lbs) .Area (sq.in) (psi) 081705 8/24/00 7 71160 28.27 2520 081706 9/14/'00 28 081707 9/14/00 28 KAR 081708 Hold (I) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., L~LESS NOTED ABOVE. (2) U.~BONDED CAP SYSTEM USED U~'NLESS OTHERWISE NOTED ABOVE. (3) FIELD TESTS ARE PER APPLICABLE ASTM STANDA~S: C138, C143, C172. C231 ,d ~ / GaryD. D~,/ Page 2 of 3 Project Managgr Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR~ INC. - GEOTECHNICAL ENVIRONMENTAL A_ND MATER~,-~LS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW AUSTIN 11050 Ables Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - .4a~gie Rawe PROJECT: Karrington Apartments North .~nerican Communities - Kurt Heinbecker REPORT DATE: 8/30,'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-084 City of Co0pell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8/17/00 Slump (in.): 3 - 5 Sampled By: Moe II Air Content (%): 3 - 5 Weather: Clear Concrete Temp (°F): 85 to 95 Supplier/Mix: TXI / 8203 FIELD DATA: SET #3 Ticket #: 2712464 Time Batched: 8:29 AM Time Sampled: 10:00 AM Slump (in.): 5 I,"2 Air Content (%): 5.__~2 Unit Weight (pcf): N;A Conc. Temp. (°F): 95 Ambient Temp. (°F): 105 Yardage (c.y.): 250 / 300 Placement Location: Front of building #9 Sample Location: Station 60-83 Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39. CAPPED PER ASTM C 1231 Set # Age Max Load Strength 3 Cylinder # Test Date (Days) (lbs) Area (sq.in) (psi) Notes 081709 8/'24/00 7 68470 28.27 2420 081710 9/14/00 28 081711 9/14/00 28 KAR 081712 Hold (1) NORMAL CYLINDER SIZE 6" X 12", AREA 28.27 sq. in., U,'NLESS NOTED ABOVE. (2) U~BONDED CAP SYSTEM USED L~LESS OTHERWISE NOTED ,M3OVE. ~n~ [ Gary D. D~t, / Page 3 of 3 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.