Gunner P2-LR000824 - T ERI~4,-NIAR, INC. -
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT ~YORTH HOUSTON LONGVIEI~' ,4USTIN
11050 Ables Lane. Dallas. Te:x'as 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group -Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-'24.00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 Ci~' ofCoppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 8..'8.'00
Slump (in.): 4 - 6 Sampled By: E. Jennnings
Air Content {% }: N 'A Weather: Clear
Concrete Temp I':F): ,N.A Supplier."Mix: TXI
FIELD DATA: SET #1
~, 0_,4,4 Time Batched: 6:35 AM Time Sampled: 7:30 AM
Ticket ~: ~" ' ~
Slump I, in.}: 3 1.2 Air Content (%): N. A Unit Weight Ipct): N.-'A
Con(. Temp. (:'F): 88 Ambient Temp. (:F): ~ Yardage lc.3-. }: 50 ¢.y.
Placement Location: Slab on grade. Builidng ~14 - 60' N & 10' E of SW bnilding corner
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOLDED AND ('URED PER ASTM ('31. TESTED PER ASTM ('39. CAPPED PER ASTM CI231
Set # Age Max Load Strength
Cylinder ¢ Test Date Area (sq.in) Notes
1 (Days) (lbs) (psi)
080801 8/15/00 7 80900 28.27 2860
080802 9/5/00 28 102230 28.27 3620
080803 9/5/00 28 108150 28.27 3830
KAR
080804 Hold
NORMAt. CYI_[NDER SIZE b" X ~. 2". AREA 28.2? sq. m.. UNLESS NOTED ABOVE
UNBONDED ('AP SYS'['EM USED UNLESS OTHERWISE NOTED ABOVE.
FIELD TESTS ARE PER .\PPLI('.\BLE ASTM STANDARDS- (_ 1-,8. (' ........ .~c.. (_ 1 ~. ( __,~ '~"
~d Gary D. Dl?',
Page I of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
-- TERI:Lk-MAR, INC. -
GEOTECHNICAL ENVIRONMENTAL AND MATER~.~xLS ENGINEERS
D,dLLAS FORT WORTH HOUSTON LONGVIEW .4 USTIN
I 1050.4 bles Lane. Dallas. ?exas ~ ~' ' ~ o
/_,z_:~ Phone.'972-488-8800 F~.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-'24. 00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi'): ~000 Placement Date: 8-'$.'00
Slump (in.): 4 - 6 Sampled By: E. Jennnings
Air Content ~.%): N-A Weather: Clear
Concrete Temp ~ -~F): N;A Supplier'Mix: TXI
FIELD DATA: SET #2
Ticket .=.': 2"03620 Time Batched: 8:19 AM Time Sampled: 9:10 AM
Slump ('in.): 5 Air Content ~?i,~: N."A Unit Weight (pcf): N.A
Conc. Temp. I ~F ~: 9(.~) Ambient Temp. ~F): 86 Yardage I c.y. ): 150 c.y.
Placement Locanon: Slab on grade, building --14 - 10' N & 30' E of SW builidng corner
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYLINDERS MOLDED AN[) CURED PERAS'I'M C3:. TESTED PER AS'rM C39. CAPPED PER AS-FM CI23i
Set # Age Max Load Strength
Cylinder # Test Date Area (sq.in) Notes
2 ~Days) (lbs) (psi)
080805 8/15/00 7 69740 28.27 2470
080806 9/5/00 28 111030 28.27 3930
080807 9/5/00 28 108440 28.27 3840
KAR
080808 Hold
(I ~ NORMAL CYLINDER SIZE 6" X :2". AREA 28.27sq in.. UNLESS NOTED ABOVE.
~2~ UNBONDED C.-\P SYS'i'EM USED UNLESS OTI I[-:RWISE NOTED ABOVE.
t'
i3'~. FIELDYESTSARmI.:RAI~PI.ICABI_EASTMSThNL)ARDS:CI38.
Page 2 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TE RRA-M~aA1, INC. -
GEOTECHNIC~ ENVIRONMENTAL AND MATERI.~xLS ENGINEERS
DALLAS FOR T IVORTH HOL..:~TON LONGt-'IEW .4 USTIN
1/050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION':
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-'24.'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 City of Coppeil - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi}: 3000 Placement Date: 8."8 00
Slump (in.'): 4 - 6 Sampled By: E. Jennnings
Air Content (%): N'A Weather: Clear
Concrete Temp I :F): N A Supplier.-Mix: TXI
FIELD DATA: SET #3
Ticket ~: 2703771 Time Batched: 9:22 AM Time Sampled: 10:20 AM
Slump (in. }: fi Air Content ~'?:,): N:'A Unit Weight (pc t-) N.-'A
Cone. Temp. I':F'I: 94 Ambient Temp. (:F): 92 Yardage Ic.y.): 250 c.v.
Placement Locmion: Slab on grade, building =14 - 45' S & 40' \V of NE building comer
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YL',NDERS MOLDED AND t'URF_D PER ASTM (_'31, TESTED PER AS'I'M C39. ('.\PPED PER AS-I-M (;1231
Set # Cvlinder .=,' Test Date Age Max Load Strength
3 ' (Days) (lbs) Area (sq.in') - Notes
(psi)
080809 8.."15.:'00 7 69550 28.27 2460
080810 9/5:"00 28 103990 28.27 3680
080811 9..'5.."00 28 104690 28.27 3700
IC~kR
080812 Hold
NORMAL CYLINDEI~, SIZE 6" X ]2". AREA 28.2- se in.. UNLESS NOTED ABOVE.
UNBONDED CAP SY.$'FEM I;SEI) UNLESS OTI [[-_'I~,;VlSE NOTED ABOVE.
FIELD TESTS ..\RE PER .-\PPI_iCABLE ASTM ST \ND.-\RDS: (_'138. ('143. C'172. (."23]
Page 3 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
- TERR_,~-MAR, INC. -
GEOTECHNICA._. ENVIRONMENTAL AND MATERt.4LS ENGINEERS
D.4LLAS FORT IFOR TH HOUSTON LONG VIEI'F A UST[N
l l050.4bles Lane. Da#as. Texas 75229 Phone.'972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Conm~unities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.24,'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength {psi.): 3000 Placement Date: 8."8.'00
Slump (in.): 4 - 6 Sampled By: E. Jennnings
Air Content (%1: N.'A Weather: Clear
Concrete Temp {°F): N."A Supplier-'Mix: TXI
FIELD DATA: SET #4
Ticket a: ; .. 0.,,9._ Time Batched: 10:49 AM Time Sampled: I1:45 AM
Slump (in.}: 6 A~r Content {'t~:i,'}: :N A Unit Weight (peri: N."A
Cone. Temp. I.:F): 9--6 Ambient Temp. I?F): 9._44 Yardage ic.y.): 330 c.y.
Placement kocation: Slab on grade, building 14. South washroom area
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOLDED AND ('[.:RED PER ASTM ("31,'rESTED PER ASTM C39. CAPPED PER ASTM Ci231
Set # Age Max Load Strength
Cylinder -~ Test Date Area (sq.in) Notes
4 (Days) (lbs) (psi)
080813 8/15.."00 7 72510 28.27 2560
080814 9.-"5.."00 28 98540 28.27 3490
080815 9/5..-00 28 98720 28.27 3490
080816 Hold
tI:NORMALCYLINI)I:RSIZEfl"X 12",AREA28.2r:q m..UNI.ESSNOTEDABOVE.
121 UNBONDED CAP SYSTEM I.:SED UNLESS OTI IER\VISE NOTED ABOVE.
~3~ FIELD TESTS ARE PER .\[ [ LI('ABLE ASTM STAND..\RDS ('138.('1"3.('172.('231
GarYlD. ~ry, ~¢/~
Page 4 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
- TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.4LLAS FORT WORTH HOUSTON LONGI,~IEI'V .4USTI;V
11050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Conmaunities - Kurt Heinbecker
REPORT DATE: 8-24-00 C.D. Construction - Garreth Campbell
TMI REPORI #: DC00-040-072 City of Coppell - Greg Jones
- SPECIFICATIONS PROJECT DAIA
Strength Ipsi): 3000. Placement Date: 8 '8.00
Slump (in. I: 4 - 6 Sampled By: E. Jennnings
Air Content (%1: N A Weather: qYlear
Concrete Tempt :'F): N.A Supplier Mix: TXI:9505
FIELD DATA: SET #1
-~': x ~ 6:35 'l-ime Sampled: 7:30 AM
Ticket =.: .~- 0- 4_4 Time Batched: AM
Slump [,in.): ~ Air Content I%}: N'A L-nit Weight (pcfl: N.'A
Conc. Temp. I':F'I: 8.8 Ambient Temp. I':F.}: 84 Yardage Ic.y.l: 50 c.y.
Placement Location: Slab on grade. Builidng =14 - 60' N & I0' E of SW building corner
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YI_iNDERS M()I_.DED AND ('[ :RED PER ASTM (.'.'- ~. TESTED PER :\STM C39. C.-\PPED PER ..\S'[M C: 23 I
Set '~ Aue Max Load Strength
~ Cylinder ~ Test Date ~ Area (sq.in) ~ Notes
1 (Days) (lbs) (psi)
080801 8.." 15.-'00 7 80900 28.27 2860
080802 9/5:00 28 102230 28.27 3620
080803 9/5,'00 28 [08 150 28.27 3830
IC~R
080804 Discard
(1 ~ NORMAL CYI.INDER SIZE o" X 12", ARE:\ _8 _.- ~-~, m.. I~:NI.ESS NOTED ABOVE.
t2~ UNBONDED CAP SYSI'E~ :SED UNLESS OI'IlI!RWISE NOTED ABO\:E:.
,c f, ,[ f - ir_ ' "='~ C231
(3~ FIELD TESTS AR[i [ ..R A, I ._,( ABL~ ASTM S'I.-\NDARDS: (7138. [':43. C ....
sd . . ry,
Page 1 of 4 Project .Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERIL&-MAR, INC.
GEOTECHNICAL ENVIRONMENTXL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW ..-tUSTIN
!1050,4hies Lane. Dallas. Texas 75229 Phone:972-488-$800 Fax:972-488-$080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Hembecker
REPORT DATE: 8.'24.00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 Ci~' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi'l: _, 00 Placement Date: 8.-8.'00
Slump i in.): 4 - 6 Sampled By: E. Jennnings
Air Content I% I: N A Weather: Cleat'
Concrete Temp {:FI: N-A Supplier Mix: TXI.-'9505
FIELD DAIA: SET #2
Ticket #: 270,~620 Time Batched: 8:19 AM Time Sampled: 9:10 AM
Slump (in.):. ~ Air Content i",,}: N'A Unit Wei,,ht= (per'l: N..A
Conc. Iemp. (:F}: 90 Ambient Temp. (:F'}: 86 Yardage lc.3'.}: 150 q:.y.
Placement Location: Slab on grade, building ~-14 - 10' N & 30' E of SW builidng comer
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('x.'I.i\DEI~,S MOLDED AND (I. RED PER ASTM (.'31. TESTED PER AbT\I ('59. C..\I~PED PER ASTM ('125~
Set ~ Age Max Load Strength
Cylinder ~ Test Date Area (sq.in) Notes
2 (Days) (lbs) (psi)
080805 8:15.-"00 7 69740 28.27 2470
080806 9.."5/00 28 1 11030 28.27 3930
080807 9.."5.."00 28 108440 28.27 3840
KAR
080808 Discard
( l ) NORMAL CYLINDER SIZE (~" X [ 2". AREA 28.2'7 .~q. :n.. UNLESS NOTED ..\BO\q/.
~2'~ UNBONDFD CAP SYSTEM ~.':ql:D UNLESS O'I-I [ERV¢ISE NOTED ABOVE.
i3) FIELD TESTS Al{F! PFR ..\I'I~i.V,'.-\B[_E ASTM ST.kNI).-\RDs: CI38. ( . a, (. 1 -~, (__.~I
~ /~ D~.~Drv.~//~
Page 2 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.dLL,4S FORT WORTH HOUSTON LO.¥G~'TEW .4USTIN
l i050..Ibles Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8 24'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strenoth Ipsi): 3000 Placement Date: 8 8.-00
Slump (in. ~: 4 - 6 Sampled By: E. Jennnings
Air Content ¢'-,,~: N A Weather: Clear
Concrete Temp I :F ~: N. A Supplier:Mix: TXI.'9505
FIELD DATA: SET #3
Ticket v:: 2703771 Time Batched: 9:22 AM Time Sampled: 10:20 AM
Slump (in.): _6 Air Content (%}: N.'A Unit Weight ( pct'):
Conc. Temp. t':F): 94 Ambient Temp. (:F}: 92 Yardage (c.v.): 250 c.v.
Placement Location: Slab on grade, bnilding al4 - 45' S & 40' W of NE building corner
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
t'YI_INDER.'; \-IOLDED AND ~ 'I.'REI) PER ASTM ('3 l, TESTED ['ER AS,'!'M ('3'). CAPPED PER .\STM £': 231
Set '~ A~e Max Load Strenuth
? Cylinder ~ Test Date ~ Area (sq.in) ~ Notes
3 (Days) (lbs) (psi)
080809 8-'15;00 7 69550 28.27 2460
080810 9i5/00 28 103990 28.27 3680
080811 9.."5/00 28 104690 28.27 3700
}CAR
080812 Discard
(1 } NORMAL CYLINDER SIZE ,:," X 12% ARE.-\ 28.27 se. :n.. UNLESS NOI'ED .&BOX-'E
(2) [.;'NBONDF. D CAP 5;x.'$'I'EM i 'SE[') I,'NLI:.SS (.)'['l IFR',V;Y;E NOTED .\BOVE.
13; FIELD TESIS -\Rli !'Iii~, .\I'I'I.!('..\Ill_E .-\STM S'l- \N'.).\RDS: ('138. C143. (;172. (7231
Gary D. Dry,
Page 3 of 4 Project .Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGI/IEW .4USTIN
l l050 Ables Lane. Daila.s. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROSECT: Ka,'rington Apartmerrts North American Communities - Kurt Heinbecker
REPORT DATE: 8-24.-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 Cit3` of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3!)00 Placement Date: 8..'8-'00
Slump (in.): 4 - 6 Sampled By': E. Jennnings
Air Content ~"i,): N A Weather: Clear
Concrete Temp I :F }: N. A Supplier.-'Mix: TXI.-'9505
FIELD DATA: SET #4
Ticket .-.: 2':03972 Time Batched: 10:49 AM Time Sampled: 11:45 AM
Slump (in.): 6_ Air Content {%}: N'A Unit Weight Ipcfl: N.A
Conc. Temp. (:F ~: 96 Ambient Temp. { :F}: 90, Yardage lc.3-'. ~: 330 c.v.
Placement Location: Slab on grade, building 14. South washroom area
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
Cx.':.:N DERS MOLDED AND ('t.'REI) PER ASTM (.'3 I. TESTED PER ..\STM C30. CAPPED PER ASTM C'. 23 I
Set # Age Max Load Strength
Cylinder ~ Test Date Area (sq.in) Notes
4 (Days) (lbs) (psi)
080813 8:15/00 7 72510 28.27 2560
080814. 9/5/00 28 9854.0 28.27 3490
080815 9/5/00 28 98720 28.27 3490
KAR
080816 Discard
NORMAL CYLINDER SIZE fi" N 12". AREA 28 27 5,4- ;a.. UNLESS NOTED ABOVE.
UNBONDED (.'AP SYS'i'I:M USED UNLESS OTi IERWIM~ NOTED AB()VE
FIE. D -'ES'FS ARE PER APPI .I('ABLE ASTM S'I'ANDAIiI')S' ("1~8. ("':4~. C172. ('231
sd r~,
Page 4 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC. -
GEOTECHNICAL ENVIRONMENTAL ,6dND MATERI,ALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW AUSTIN
11050.4bles Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.'24.-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 8.8-'00
Slump (in.}: 4 - 6 Sampled By: £. Jennnings
Air Content (%): N-A Weather: Clear
Concrete Temp {°F): N. A Supplier:Mix: TXI
FIELD DATA: SET #1
Ticket -~: 2703424 Time Batched: 6:35 AM Time Sampled: 7:30 AM
Slump (in.): 3 I 2 Air Content I%): N."A Unit Weight I pcf): N;'A
Conc. Temp. t~F): 88 Ambient Temp. (°F): 84 Yardage Ic.y.): 50 c.y.
Placement Location: Slab on grade. Builidng *14 - 60' N & 10' E of SW building comer
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOI.DED AND ('URED PER ASTM C31. TESTED PER ASTM C39. CAPPED PER ASTM £'i 23 i
Set ~4 A~e Max Load Strength
'~ Cylinder # Test Date ~ Area (sq.in) ~ Notes
1 (Days) (lbs) (psi)
080801 8; l 5;00 7 80900 28.27 2860
080802 9:'5/00 28
080803 9/5;00 28
KAR
080804 Hold
(1 } NORMAL CYLINDER SIZE 6" X ' ~" AREA 28 27 s~. in., UNLESS NOTED ABOVE.
(2) UNBONDED CAP SYSTEM L. SED L..~LESS OTHERWISE NOTED ABOVE.
(3) FIELD TESTS ARE !-'ER .-XPPLICAI~I_E ASTM STANDARDS: C138, CI43. C1'72, C231
sd Gar?D. Dr>', llt~Z~
Page 1 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, Without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICA~ ENVIRONMENTAL AND MATER~:xLS ENGINEERS
DdLL.4S FORT WORTH HOUSTON LONGVIEW .4USTIN
l l050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8-24-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 City ofCoppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength ~psi): 3000 Placement Date: 8.'8-00
Slump (in.): 4 - 6 Sampled By: E. Jennnings
Air Content ~%): N. A Weather: Clear
Concrete Temp (:F): N..'A Supplier:Mix: TXI
FIELD DATA: SET #2
Ticket ~-: 2703620 Time Batched: 8:19 AM Time Sampled: 9:10 AM
Slump {'in.): ~ Air Content Iq'>0: N-A L-nit Weight (pcB: N."A
Conc. Temp. (=F): 90 Ambient Temp. ~ ~-F): 86 Yardage I c.v. I: 150 c.y.
Placement Location: Slab on grade, building ::14 - 10' N & 30' E ofSW builidng corner
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYLINDERS MOLDED AND CLRED PER ASTM C31. TESTED PER AS'I'M ('30. CAPPED PER ASTM ('1231
Set # Age Max Load Strength
2 Cylinder ~- Test Date (Days) (lbs) Area (sq.in) (psi) Notes
080805 8/15/00 -7, 69740 28.27 2470
080806 9/5/00 28
080807 9/5/00 28
ICa~R
080808 Hold
(I) NORMAL CYI.INDER SIZE 6" X 12", .AREA 28.27 _,q. m., UNLESS ×OTED ABOVE
t-. UNBONDED CAP SYS'I'I_:M USED UNLESS OTHERWISE NOTED ABOVE
~3) FIELD TESTS ARI! PER .\PPL[CABLE ASTM STANDARDS: ('~ ?,. (-'~'3. CI72. C2) 1
Page 2 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety. Without the written consent of TMI. Results apply only to above tests.
- TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.4LLAS FORT WORTH HOUSTON LONG~'IEW .4U'STIN
11050 dbles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Hembecker
REPORT DATE: 8.24.'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-072 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 8.-'8-00
Slump {in.): 4 - 6 Sampled By: E. Jennnings
A ir Content (% }: N A Weather: Clear
Concrete Temp (':F): N-A Supplier. Mix: TXI
FIELD DATA: SET #3
Ticket a: 2703771 Time Batched: 9.__ AM Time Sampled: 10:20 AM
Slump (in.): fi .Air Content {%): N'A Unit Weight (pcf): N.-'A
Conc. Temp. {':F): 94 Ambient Temp. (°F): 92 Yardage (c.y.~: 250 c.y.
Placement Location: Slab on grade, building .--.-14 - 45' S & 40' W of NE building corner
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YI_INDERS MOLDED AND CURED PER ASTM (_"31, TESTED PER ASTM C39. CAPI'EI.) PER .-\STM ('1231
Set ~ A~e Max Load Strength
?' Cylinder -~ Test Date ~ Area (sq.in) Notes
3 (Days) (lbs) (psi)
0808{)9 8.15/00 7 69550 28.27 2460
080810 9/5/00 28
08081 1 9/5/00 28
KAR
080812 Hold
( '~ NORMAl_ CYLINDER SIZE 6" X '2". ARE.& 25.27 sq 'n.. UNLESS NOTED ABOVE.
~~~ UNB()NDED C:\P SYSi'EM ! SEI) !;NI.ESS O'FF I RW SE NOTED .-\BOX-'E.
~3~ FIELD TESTS ARE I'ER APPI.I('.XBLE ASTM S'I' \ND.-\RDS: C138.(.- ...... :4:.( ....
sd . · D;y,
Page 3 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.4LLAS FORT WORTH HOUSTON LONGF[EW AUSTIN
11050.4hies Lane. Dallas'. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrmgton Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.'24.-'00 C.D. Construction - Garreth Campbell
T_MI REPORT #: DC00-040-072 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength ~psi): 3000 Placement Date: 8-'8-00
Slump ('in. ~: 4 - 6 Sampled By: E. Jennnings
Air Content i%): N A Weather: Clear
Concrete Temp (=F): N.'A Supplier-'Mix: TXI
FIELD DATA: SET #4
Ticket v:.
.... ~9.~ Time Batched: 10:49 AM Time Sampled: 11:45 AM
Slump (in.): _6 Air Content i%'}: N:A Unit Weight Ipcf}: N;A
Conc. Temp. f:F): 96 .Ambient Temp. I=F.}: 94 Yardage Ic.y. }: 330 c.v.
Placement Location: Slab on grade, building 14. South washroom area
Sample Location:
Remarks:
CONCRETE COMPRESSION TEST RESULTS
(. YLINDERS MOLDED AND CURED PER :\STM ('3:. rESTED PER .~s-rx-t c30. CAPPED PER .-\STM ('!231
Set # Age Max Load Strength
4 Cylinder ~ Test Date IDays) (lbs) ,Area (sq.in) (psi) Notes
080813 8.:15/00 7 72510 28.27 2560
080814 9:"5.,00 28
080815 9.."5.."00 28
080816 Hold
I !', NORMY. I. CYI.!NDER SIZE tv'.. X I_~"..-\REA 28.2- sq. m. UNLESS NOTED ABOVE.
!2', L'NBONDED C.\P SYSTEM LSEI') UNLESS OT[ IER'3.'ISE NOTED .\BOVE
!3 ~ FIELD TESTS .-\RE ['[iR .-\PPLIC.\BLE AS'FM ST.\NI_)ARDS: CI38. ('1-;3. (.'172. ("23'
Page 4 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC. -
GEOTECHNICAL ENVIRONMENTAL :.~-ND MATERI.-qLS ENGINEERS
DALLAS FORT WORTH HOC'STON LONGVIEW AUSTIN
11050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-'24'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-062 Cit'5.' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 7 '25-'00
Slump (in.): 5 Sampled By: E. Jennings
Air Content (% I: ~ _ 7 Weather: Clear
Concrete Temp (°F): Supplier-Mix: TXI
FIELD DATA: SET #1
Ticket .=.: 1450690 Time Batched: 4:48 AM Time Sampled: 5:40 AM
Slump (in.): 5 Air Content (%): N;A Unit Weight {pct): 3000
Conc. Temp. I.:F): 85 Ambient Temp. (=F): 69 Yardage (c.y. }: 2_QO
Placement Location: Parking slab ' clubhouse head in parking area
Sample Location:
Remarks: Air meter seal leaked: unable to perform accurate air test on this sample.
CONCRETE COMPRESSION TEST RESULTS
t'YLINDERS MOLDED AND CURED PER AS'i'M C31, TESTED PER AS'I'M C39. CAPPED PER ASTM C1231
Set # Age Max Load Strength
Cylinder e. Test Date Area (sq.in) Notes
1 (Days) (lbs) (psi)
072501 8:1.-00 7 78590 28.27 2780
072502 8.-'22/00 28 115650 ~8._, 4090
072503 8-'22/00 28 119420 28.27 4220
072504 Discard
(1 ~ NORMAL CYLINDER SIZE o" X i2". AREA 28 2? sq. :n.. UNLESS NOTED ABOVE.
t2~ L'NBONDED ('AP SYSTEM I_.SED UNkESS OTHERXA'ISE NOTED ABOVE
~3~ FIELD TESTS ARE PER ..\PPI.ICABLE :\STM S'FANDARDS C;38, (_'143, C172. C231
Additional Distribution:
Gary b. Dr.;', I1[~'~
Page 1 of 2 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERICA-MAR, INC. "-
GEOTECHNICAI~ ENVIRONMENTAL AND MATEI~.4LS ENGINEERS
DALLAS FORT t~'ORTH HOUSTON LONGVIEW AUSTIN
11050 Ables Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'9.,'_'-488-8 ')80
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISIRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-'24.-'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-062 City,' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength ~psi'): 3000 Placement Date: 7"25 00
Slump {'in. ~: 5 Sampled By: E. Jennings
Air Content (%}: ', _ '7 Weather: Clear
Concrete Temp I~F'}: Supplier.'Mix: TXI
FIELD DATA: SET #2
Ticket ~: 1546449 Time Batched: 8:41 AM Time Sampled: 9:40 AM
Slump lin.): 4_ Air Content I%): N-'A l_.'nit Weight (pcfl: 3000
Conc. Temp. !:'F): 9() Ambient Temp. I:F'): 82 Yardage Ic.y.): 120
Placement Location: Utility garage across from buildin~ pad 6
Sample Location:
Remarks: Air meter seal leaked - unable to perform accurate air tests.
CONCRETE COMPRESSION TEST RESULTS
CYLINDERS MOI.DED AND CURED PER ASTM C_'- i. TESTED PER AS'I'M C39. CAPPED PER ASTM C123 I
Set # Age Max Load ,aa'ea Strength
Cylinder.~ Test Date Notes
2 (Days) (lbs) (sq.in) (psi)
072505 8/1.-"00 7 87080 28.27 3080
072506 8:22/00 28 115650 28.27 4090
072507 8/22.."00 28 119420 28.27 4220
072508 Discard
(1) NORMAL CYI.INDER SIZE 6" X 12", ARE \ 28.2~ sq. :n.. UNI.ESS NOTED ABOVE.
!2) UNBONI)FI') (':',P SYSTEM USED UNLESS OTHERWISE NOTED ABOVE.
1.3 ~ FIEI_D TESTS :\RE PER APPLICABLE :\STM STANDARDS. £'i 38. C 143. C172. (_'23 I
Additional Distribution:
:d Gary D. Dr>,, ~t~J{o~
Page 2 of 2 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its