Loading...
Gunner P2-LR000824 - T ERI~4,-NIAR, INC. - GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT ~YORTH HOUSTON LONGVIEI~' ,4USTIN 11050 Ables Lane. Dallas. Te:x'as 75229 Phone:972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group -Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.-'24.00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 Ci~' ofCoppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8..'8.'00 Slump (in.): 4 - 6 Sampled By: E. Jennnings Air Content {% }: N 'A Weather: Clear Concrete Temp I':F): ,N.A Supplier."Mix: TXI FIELD DATA: SET #1 ~, 0_,4,4 Time Batched: 6:35 AM Time Sampled: 7:30 AM Ticket ~: ~" ' ~ Slump I, in.}: 3 1.2 Air Content (%): N. A Unit Weight Ipct): N.-'A Con(. Temp. (:'F): 88 Ambient Temp. (:F): ~ Yardage lc.3-. }: 50 ¢.y. Placement Location: Slab on grade. Builidng ~14 - 60' N & 10' E of SW bnilding corner Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YLINDERS MOLDED AND ('URED PER ASTM ('31. TESTED PER ASTM ('39. CAPPED PER ASTM CI231 Set # Age Max Load Strength Cylinder ¢ Test Date Area (sq.in) Notes 1 (Days) (lbs) (psi) 080801 8/15/00 7 80900 28.27 2860 080802 9/5/00 28 102230 28.27 3620 080803 9/5/00 28 108150 28.27 3830 KAR 080804 Hold NORMAt. CYI_[NDER SIZE b" X ~. 2". AREA 28.2? sq. m.. UNLESS NOTED ABOVE UNBONDED ('AP SYS'['EM USED UNLESS OTHERWISE NOTED ABOVE. FIELD TESTS ARE PER .\PPLI('.\BLE ASTM STANDARDS- (_ 1-,8. (' ........ .~c.. (_ 1 ~. ( __,~ '~" ~d Gary D. Dl?', Page I of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. -- TERI:Lk-MAR, INC. - GEOTECHNICAL ENVIRONMENTAL AND MATER~.~xLS ENGINEERS D,dLLAS FORT WORTH HOUSTON LONGVIEW .4 USTIN I 1050.4 bles Lane. Dallas. ?exas ~ ~' ' ~ o /_,z_:~ Phone.'972-488-8800 F~.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.-'24. 00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi'): ~000 Placement Date: 8-'$.'00 Slump (in.): 4 - 6 Sampled By: E. Jennnings Air Content ~.%): N-A Weather: Clear Concrete Temp ~ -~F): N;A Supplier'Mix: TXI FIELD DATA: SET #2 Ticket .=.': 2"03620 Time Batched: 8:19 AM Time Sampled: 9:10 AM Slump ('in.): 5 Air Content ~?i,~: N."A Unit Weight (pcf): N.A Conc. Temp. I ~F ~: 9(.~) Ambient Temp. ~F): 86 Yardage I c.y. ): 150 c.y. Placement Locanon: Slab on grade, building --14 - 10' N & 30' E of SW builidng corner Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AN[) CURED PERAS'I'M C3:. TESTED PER AS'rM C39. CAPPED PER AS-FM CI23i Set # Age Max Load Strength Cylinder # Test Date Area (sq.in) Notes 2 ~Days) (lbs) (psi) 080805 8/15/00 7 69740 28.27 2470 080806 9/5/00 28 111030 28.27 3930 080807 9/5/00 28 108440 28.27 3840 KAR 080808 Hold (I ~ NORMAL CYLINDER SIZE 6" X :2". AREA 28.27sq in.. UNLESS NOTED ABOVE. ~2~ UNBONDED C.-\P SYS'i'EM USED UNLESS OTI I[-:RWISE NOTED ABOVE. t' i3'~. FIELDYESTSARmI.:RAI~PI.ICABI_EASTMSThNL)ARDS:CI38. Page 2 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TE RRA-M~aA1, INC. - GEOTECHNIC~ ENVIRONMENTAL AND MATERI.~xLS ENGINEERS DALLAS FOR T IVORTH HOL..:~TON LONGt-'IEW .4 USTIN 1/050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION': CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.-'24.'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 City of Coppeil - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi}: 3000 Placement Date: 8."8 00 Slump (in.'): 4 - 6 Sampled By: E. Jennnings Air Content (%): N'A Weather: Clear Concrete Temp I :F): N A Supplier.-Mix: TXI FIELD DATA: SET #3 Ticket ~: 2703771 Time Batched: 9:22 AM Time Sampled: 10:20 AM Slump (in. }: fi Air Content ~'?:,): N:'A Unit Weight (pc t-) N.-'A Cone. Temp. I':F'I: 94 Ambient Temp. (:F): 92 Yardage Ic.y.): 250 c.v. Placement Locmion: Slab on grade, building =14 - 45' S & 40' \V of NE building comer Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YL',NDERS MOLDED AND t'URF_D PER ASTM (_'31, TESTED PER AS'I'M C39. ('.\PPED PER AS-I-M (;1231 Set # Cvlinder .=,' Test Date Age Max Load Strength 3 ' (Days) (lbs) Area (sq.in') - Notes (psi) 080809 8.."15.:'00 7 69550 28.27 2460 080810 9/5:"00 28 103990 28.27 3680 080811 9..'5.."00 28 104690 28.27 3700 IC~kR 080812 Hold NORMAL CYLINDEI~, SIZE 6" X ]2". AREA 28.2- se in.. UNLESS NOTED ABOVE. UNBONDED CAP SY.$'FEM I;SEI) UNLESS OTI [[-_'I~,;VlSE NOTED ABOVE. FIELD TESTS ..\RE PER .-\PPI_iCABLE ASTM ST \ND.-\RDS: (_'138. ('143. C'172. (."23] Page 3 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. - TERR_,~-MAR, INC. - GEOTECHNICA._. ENVIRONMENTAL AND MATERt.4LS ENGINEERS D.4LLAS FORT IFOR TH HOUSTON LONG VIEI'F A UST[N l l050.4bles Lane. Da#as. Texas 75229 Phone.'972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Conm~unities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.24,'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 CiD' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength {psi.): 3000 Placement Date: 8."8.'00 Slump (in.): 4 - 6 Sampled By: E. Jennnings Air Content (%1: N.'A Weather: Clear Concrete Temp {°F): N."A Supplier-'Mix: TXI FIELD DATA: SET #4 Ticket a: ; .. 0.,,9._ Time Batched: 10:49 AM Time Sampled: I1:45 AM Slump (in.}: 6 A~r Content {'t~:i,'}: :N A Unit Weight (peri: N."A Cone. Temp. I.:F): 9--6 Ambient Temp. I?F): 9._44 Yardage ic.y.): 330 c.y. Placement kocation: Slab on grade, building 14. South washroom area Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YLINDERS MOLDED AND ('[.:RED PER ASTM ("31,'rESTED PER ASTM C39. CAPPED PER ASTM Ci231 Set # Age Max Load Strength Cylinder -~ Test Date Area (sq.in) Notes 4 (Days) (lbs) (psi) 080813 8/15.."00 7 72510 28.27 2560 080814 9.-"5.."00 28 98540 28.27 3490 080815 9/5..-00 28 98720 28.27 3490 080816 Hold tI:NORMALCYLINI)I:RSIZEfl"X 12",AREA28.2r:q m..UNI.ESSNOTEDABOVE. 121 UNBONDED CAP SYSTEM I.:SED UNLESS OTI IER\VISE NOTED ABOVE. ~3~ FIELD TESTS ARE PER .\[ [ LI('ABLE ASTM STAND..\RDS ('138.('1"3.('172.('231 GarYlD. ~ry, ~¢/~ Page 4 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. - TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS D.4LLAS FORT WORTH HOUSTON LONGI,~IEI'V .4USTI;V 11050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Conmaunities - Kurt Heinbecker REPORT DATE: 8-24-00 C.D. Construction - Garreth Campbell TMI REPORI #: DC00-040-072 City of Coppell - Greg Jones - SPECIFICATIONS PROJECT DAIA Strength Ipsi): 3000. Placement Date: 8 '8.00 Slump (in. I: 4 - 6 Sampled By: E. Jennnings Air Content (%1: N A Weather: qYlear Concrete Tempt :'F): N.A Supplier Mix: TXI:9505 FIELD DATA: SET #1 -~': x ~ 6:35 'l-ime Sampled: 7:30 AM Ticket =.: .~- 0- 4_4 Time Batched: AM Slump [,in.): ~ Air Content I%}: N'A L-nit Weight (pcfl: N.'A Conc. Temp. I':F'I: 8.8 Ambient Temp. I':F.}: 84 Yardage Ic.y.l: 50 c.y. Placement Location: Slab on grade. Builidng =14 - 60' N & I0' E of SW building corner Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YI_iNDERS M()I_.DED AND ('[ :RED PER ASTM (.'.'- ~. TESTED PER :\STM C39. C.-\PPED PER ..\S'[M C: 23 I Set '~ Aue Max Load Strength ~ Cylinder ~ Test Date ~ Area (sq.in) ~ Notes 1 (Days) (lbs) (psi) 080801 8.." 15.-'00 7 80900 28.27 2860 080802 9/5:00 28 102230 28.27 3620 080803 9/5,'00 28 [08 150 28.27 3830 IC~R 080804 Discard (1 ~ NORMAL CYI.INDER SIZE o" X 12", ARE:\ _8 _.- ~-~, m.. I~:NI.ESS NOTED ABOVE. t2~ UNBONDED CAP SYSI'E~ :SED UNLESS OI'IlI!RWISE NOTED ABO\:E:. ,c f, ,[ f - ir_ ' "='~ C231 (3~ FIELD TESTS AR[i [ ..R A, I ._,( ABL~ ASTM S'I.-\NDARDS: (7138. [':43. C .... sd . . ry, Page 1 of 4 Project .Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERIL&-MAR, INC. GEOTECHNICAL ENVIRONMENTXL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW ..-tUSTIN !1050,4hies Lane. Dallas. Texas 75229 Phone:972-488-$800 Fax:972-488-$080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Hembecker REPORT DATE: 8.'24.00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 Ci~' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi'l: _, 00 Placement Date: 8.-8.'00 Slump i in.): 4 - 6 Sampled By: E. Jennnings Air Content I% I: N A Weather: Cleat' Concrete Temp {:FI: N-A Supplier Mix: TXI.-'9505 FIELD DAIA: SET #2 Ticket #: 270,~620 Time Batched: 8:19 AM Time Sampled: 9:10 AM Slump (in.):. ~ Air Content i",,}: N'A Unit Wei,,ht= (per'l: N..A Conc. Iemp. (:F}: 90 Ambient Temp. (:F'}: 86 Yardage lc.3'.}: 150 q:.y. Placement Location: Slab on grade, building ~-14 - 10' N & 30' E of SW builidng comer Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('x.'I.i\DEI~,S MOLDED AND (I. RED PER ASTM (.'31. TESTED PER AbT\I ('59. C..\I~PED PER ASTM ('125~ Set ~ Age Max Load Strength Cylinder ~ Test Date Area (sq.in) Notes 2 (Days) (lbs) (psi) 080805 8:15.-"00 7 69740 28.27 2470 080806 9.."5/00 28 1 11030 28.27 3930 080807 9.."5.."00 28 108440 28.27 3840 KAR 080808 Discard ( l ) NORMAL CYLINDER SIZE (~" X [ 2". AREA 28.2'7 .~q. :n.. UNLESS NOTED ..\BO\q/. ~2'~ UNBONDFD CAP SYSTEM ~.':ql:D UNLESS O'I-I [ERV¢ISE NOTED ABOVE. i3) FIELD TESTS Al{F! PFR ..\I'I~i.V,'.-\B[_E ASTM ST.kNI).-\RDs: CI38. ( . a, (. 1 -~, (__.~I ~ /~ D~.~Drv.~//~ Page 2 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS D.dLL,4S FORT WORTH HOUSTON LO.¥G~'TEW .4USTIN l i050..Ibles Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8 24'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strenoth Ipsi): 3000 Placement Date: 8 8.-00 Slump (in. ~: 4 - 6 Sampled By: E. Jennnings Air Content ¢'-,,~: N A Weather: Clear Concrete Temp I :F ~: N. A Supplier:Mix: TXI.'9505 FIELD DATA: SET #3 Ticket v:: 2703771 Time Batched: 9:22 AM Time Sampled: 10:20 AM Slump (in.): _6 Air Content (%}: N.'A Unit Weight ( pct'): Conc. Temp. t':F): 94 Ambient Temp. (:F}: 92 Yardage (c.v.): 250 c.v. Placement Location: Slab on grade, bnilding al4 - 45' S & 40' W of NE building corner Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS t'YI_INDER.'; \-IOLDED AND ~ 'I.'REI) PER ASTM ('3 l, TESTED ['ER AS,'!'M ('3'). CAPPED PER .\STM £': 231 Set '~ A~e Max Load Strenuth ? Cylinder ~ Test Date ~ Area (sq.in) ~ Notes 3 (Days) (lbs) (psi) 080809 8-'15;00 7 69550 28.27 2460 080810 9i5/00 28 103990 28.27 3680 080811 9.."5/00 28 104690 28.27 3700 }CAR 080812 Discard (1 } NORMAL CYLINDER SIZE ,:," X 12% ARE.-\ 28.27 se. :n.. UNLESS NOI'ED .&BOX-'E (2) [.;'NBONDF. D CAP 5;x.'$'I'EM i 'SE[') I,'NLI:.SS (.)'['l IFR',V;Y;E NOTED .\BOVE. 13; FIELD TESIS -\Rli !'Iii~, .\I'I'I.!('..\Ill_E .-\STM S'l- \N'.).\RDS: ('138. C143. (;172. (7231 Gary D. Dry, Page 3 of 4 Project .Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGI/IEW .4USTIN l l050 Ables Lane. Daila.s. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROSECT: Ka,'rington Apartmerrts North American Communities - Kurt Heinbecker REPORT DATE: 8-24.-00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 Cit3` of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3!)00 Placement Date: 8..'8-'00 Slump (in.): 4 - 6 Sampled By': E. Jennnings Air Content ~"i,): N A Weather: Clear Concrete Temp I :F }: N. A Supplier.-'Mix: TXI.-'9505 FIELD DATA: SET #4 Ticket .-.: 2':03972 Time Batched: 10:49 AM Time Sampled: 11:45 AM Slump (in.): 6_ Air Content {%}: N'A Unit Weight Ipcfl: N.A Conc. Temp. (:F ~: 96 Ambient Temp. { :F}: 90, Yardage lc.3-'. ~: 330 c.v. Placement Location: Slab on grade, building 14. South washroom area Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS Cx.':.:N DERS MOLDED AND ('t.'REI) PER ASTM (.'3 I. TESTED PER ..\STM C30. CAPPED PER ASTM C'. 23 I Set # Age Max Load Strength Cylinder ~ Test Date Area (sq.in) Notes 4 (Days) (lbs) (psi) 080813 8:15/00 7 72510 28.27 2560 080814. 9/5/00 28 9854.0 28.27 3490 080815 9/5/00 28 98720 28.27 3490 KAR 080816 Discard NORMAL CYLINDER SIZE fi" N 12". AREA 28 27 5,4- ;a.. UNLESS NOTED ABOVE. UNBONDED (.'AP SYS'i'I:M USED UNLESS OTi IERWIM~ NOTED AB()VE FIE. D -'ES'FS ARE PER APPI .I('ABLE ASTM S'I'ANDAIiI')S' ("1~8. ("':4~. C172. ('231 sd r~, Page 4 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. - GEOTECHNICAL ENVIRONMENTAL ,6dND MATERI,ALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGVIEW AUSTIN 11050.4bles Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.'24.-00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 CiD' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8.8-'00 Slump (in.}: 4 - 6 Sampled By: £. Jennnings Air Content (%): N-A Weather: Clear Concrete Temp {°F): N. A Supplier:Mix: TXI FIELD DATA: SET #1 Ticket -~: 2703424 Time Batched: 6:35 AM Time Sampled: 7:30 AM Slump (in.): 3 I 2 Air Content I%): N."A Unit Weight I pcf): N;'A Conc. Temp. t~F): 88 Ambient Temp. (°F): 84 Yardage Ic.y.): 50 c.y. Placement Location: Slab on grade. Builidng *14 - 60' N & 10' E of SW building comer Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YLINDERS MOI.DED AND ('URED PER ASTM C31. TESTED PER ASTM C39. CAPPED PER ASTM £'i 23 i Set ~4 A~e Max Load Strength '~ Cylinder # Test Date ~ Area (sq.in) ~ Notes 1 (Days) (lbs) (psi) 080801 8; l 5;00 7 80900 28.27 2860 080802 9:'5/00 28 080803 9/5;00 28 KAR 080804 Hold (1 } NORMAL CYLINDER SIZE 6" X ' ~" AREA 28 27 s~. in., UNLESS NOTED ABOVE. (2) UNBONDED CAP SYSTEM L. SED L..~LESS OTHERWISE NOTED ABOVE. (3) FIELD TESTS ARE !-'ER .-XPPLICAI~I_E ASTM STANDARDS: C138, CI43. C1'72, C231 sd Gar?D. Dr>', llt~Z~ Page 1 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, Without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICA~ ENVIRONMENTAL AND MATER~:xLS ENGINEERS DdLL.4S FORT WORTH HOUSTON LONGVIEW .4USTIN l l050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8-24-00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 City ofCoppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength ~psi): 3000 Placement Date: 8.'8-00 Slump (in.): 4 - 6 Sampled By: E. Jennnings Air Content ~%): N. A Weather: Clear Concrete Temp (:F): N..'A Supplier:Mix: TXI FIELD DATA: SET #2 Ticket ~-: 2703620 Time Batched: 8:19 AM Time Sampled: 9:10 AM Slump {'in.): ~ Air Content Iq'>0: N-A L-nit Weight (pcB: N."A Conc. Temp. (=F): 90 Ambient Temp. ~ ~-F): 86 Yardage I c.v. I: 150 c.y. Placement Location: Slab on grade, building ::14 - 10' N & 30' E ofSW builidng corner Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CLRED PER ASTM C31. TESTED PER AS'I'M ('30. CAPPED PER ASTM ('1231 Set # Age Max Load Strength 2 Cylinder ~- Test Date (Days) (lbs) Area (sq.in) (psi) Notes 080805 8/15/00 -7, 69740 28.27 2470 080806 9/5/00 28 080807 9/5/00 28 ICa~R 080808 Hold (I) NORMAL CYI.INDER SIZE 6" X 12", .AREA 28.27 _,q. m., UNLESS ×OTED ABOVE t-. UNBONDED CAP SYS'I'I_:M USED UNLESS OTHERWISE NOTED ABOVE ~3) FIELD TESTS ARI! PER .\PPL[CABLE ASTM STANDARDS: ('~ ?,. (-'~'3. CI72. C2) 1 Page 2 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety. Without the written consent of TMI. Results apply only to above tests. - TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS D.4LLAS FORT WORTH HOUSTON LONG~'IEW .4U'STIN 11050 dbles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Hembecker REPORT DATE: 8.24.'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-072 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 8.-'8-00 Slump {in.): 4 - 6 Sampled By: E. Jennnings A ir Content (% }: N A Weather: Clear Concrete Temp (':F): N-A Supplier. Mix: TXI FIELD DATA: SET #3 Ticket a: 2703771 Time Batched: 9.__ AM Time Sampled: 10:20 AM Slump (in.): fi .Air Content {%): N'A Unit Weight (pcf): N.-'A Conc. Temp. {':F): 94 Ambient Temp. (°F): 92 Yardage (c.y.~: 250 c.y. Placement Location: Slab on grade, building .--.-14 - 45' S & 40' W of NE building corner Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS ('YI_INDERS MOLDED AND CURED PER ASTM (_"31, TESTED PER ASTM C39. CAPI'EI.) PER .-\STM ('1231 Set ~ A~e Max Load Strength ?' Cylinder -~ Test Date ~ Area (sq.in) Notes 3 (Days) (lbs) (psi) 0808{)9 8.15/00 7 69550 28.27 2460 080810 9/5/00 28 08081 1 9/5/00 28 KAR 080812 Hold ( '~ NORMAl_ CYLINDER SIZE 6" X '2". ARE.& 25.27 sq 'n.. UNLESS NOTED ABOVE. ~~~ UNB()NDED C:\P SYSi'EM ! SEI) !;NI.ESS O'FF I RW SE NOTED .-\BOX-'E. ~3~ FIELD TESTS ARE I'ER APPI.I('.XBLE ASTM S'I' \ND.-\RDS: C138.(.- ...... :4:.( .... sd . · D;y, Page 3 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS D.4LLAS FORT WORTH HOUSTON LONGF[EW AUSTIN 11050.4hies Lane. Dallas'. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrmgton Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.'24.-'00 C.D. Construction - Garreth Campbell T_MI REPORT #: DC00-040-072 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength ~psi): 3000 Placement Date: 8-'8-00 Slump ('in. ~: 4 - 6 Sampled By: E. Jennnings Air Content i%): N A Weather: Clear Concrete Temp (=F): N.'A Supplier-'Mix: TXI FIELD DATA: SET #4 Ticket v:. .... ~9.~ Time Batched: 10:49 AM Time Sampled: 11:45 AM Slump (in.): _6 Air Content i%'}: N:A Unit Weight Ipcf}: N;A Conc. Temp. f:F): 96 .Ambient Temp. I=F.}: 94 Yardage Ic.y. }: 330 c.v. Placement Location: Slab on grade, building 14. South washroom area Sample Location: Remarks: CONCRETE COMPRESSION TEST RESULTS (. YLINDERS MOLDED AND CURED PER :\STM ('3:. rESTED PER .~s-rx-t c30. CAPPED PER .-\STM ('!231 Set # Age Max Load Strength 4 Cylinder ~ Test Date IDays) (lbs) ,Area (sq.in) (psi) Notes 080813 8.:15/00 7 72510 28.27 2560 080814 9:"5.,00 28 080815 9.."5.."00 28 080816 Hold I !', NORMY. I. CYI.!NDER SIZE tv'.. X I_~"..-\REA 28.2- sq. m. UNLESS NOTED ABOVE. !2', L'NBONDED C.\P SYSTEM LSEI') UNLESS OT[ IER'3.'ISE NOTED .\BOVE !3 ~ FIELD TESTS .-\RE ['[iR .-\PPLIC.\BLE AS'FM ST.\NI_)ARDS: CI38. ('1-;3. (.'172. ("23' Page 4 of 4 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERRA-MAR, INC. - GEOTECHNICAL ENVIRONMENTAL :.~-ND MATERI.-qLS ENGINEERS DALLAS FORT WORTH HOC'STON LONGVIEW AUSTIN 11050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.-'24'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-062 Cit'5.' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): 3000 Placement Date: 7 '25-'00 Slump (in.): 5 Sampled By: E. Jennings Air Content (% I: ~ _ 7 Weather: Clear Concrete Temp (°F): Supplier-Mix: TXI FIELD DATA: SET #1 Ticket .=.: 1450690 Time Batched: 4:48 AM Time Sampled: 5:40 AM Slump (in.): 5 Air Content (%): N;A Unit Weight {pct): 3000 Conc. Temp. I.:F): 85 Ambient Temp. (=F): 69 Yardage (c.y. }: 2_QO Placement Location: Parking slab ' clubhouse head in parking area Sample Location: Remarks: Air meter seal leaked: unable to perform accurate air test on this sample. CONCRETE COMPRESSION TEST RESULTS t'YLINDERS MOLDED AND CURED PER AS'i'M C31, TESTED PER AS'I'M C39. CAPPED PER ASTM C1231 Set # Age Max Load Strength Cylinder e. Test Date Area (sq.in) Notes 1 (Days) (lbs) (psi) 072501 8:1.-00 7 78590 28.27 2780 072502 8.-'22/00 28 115650 ~8._, 4090 072503 8-'22/00 28 119420 28.27 4220 072504 Discard (1 ~ NORMAL CYLINDER SIZE o" X i2". AREA 28 2? sq. :n.. UNLESS NOTED ABOVE. t2~ L'NBONDED ('AP SYSTEM I_.SED UNkESS OTHERXA'ISE NOTED ABOVE ~3~ FIELD TESTS ARE PER ..\PPI.ICABLE :\STM S'FANDARDS C;38, (_'143, C172. C231 Additional Distribution: Gary b. Dr.;', I1[~'~ Page 1 of 2 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. TERICA-MAR, INC. "- GEOTECHNICAI~ ENVIRONMENTAL AND MATEI~.4LS ENGINEERS DALLAS FORT t~'ORTH HOUSTON LONGVIEW AUSTIN 11050 Ables Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'9.,'_'-488-8 ')80 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISIRIBUTION: CLIENT: North American Communities Archon Group - Angle Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8.-'24.-'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-062 City,' of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength ~psi'): 3000 Placement Date: 7"25 00 Slump {'in. ~: 5 Sampled By: E. Jennings Air Content (%}: ', _ '7 Weather: Clear Concrete Temp I~F'}: Supplier.'Mix: TXI FIELD DATA: SET #2 Ticket ~: 1546449 Time Batched: 8:41 AM Time Sampled: 9:40 AM Slump lin.): 4_ Air Content I%): N-'A l_.'nit Weight (pcfl: 3000 Conc. Temp. !:'F): 9() Ambient Temp. I:F'): 82 Yardage Ic.y.): 120 Placement Location: Utility garage across from buildin~ pad 6 Sample Location: Remarks: Air meter seal leaked - unable to perform accurate air tests. CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOI.DED AND CURED PER ASTM C_'- i. TESTED PER AS'I'M C39. CAPPED PER ASTM C123 I Set # Age Max Load ,aa'ea Strength Cylinder.~ Test Date Notes 2 (Days) (lbs) (sq.in) (psi) 072505 8/1.-"00 7 87080 28.27 3080 072506 8:22/00 28 115650 28.27 4090 072507 8/22.."00 28 119420 28.27 4220 072508 Discard (1) NORMAL CYI.INDER SIZE 6" X 12", ARE \ 28.2~ sq. :n.. UNI.ESS NOTED ABOVE. !2) UNBONI)FI') (':',P SYSTEM USED UNLESS OTHERWISE NOTED ABOVE. 1.3 ~ FIEI_D TESTS :\RE PER APPLICABLE :\STM STANDARDS. £'i 38. C 143. C172. (_'23 I Additional Distribution: :d Gary D. Dr>,, ~t~J{o~ Page 2 of 2 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.