Loading...
ST9702-CS 970702 ME~'IORAND~ To: Vivyon Bowman, Director of Administration/Human Resources From: Atul Patel, E.I.T., Graduate Engineer, Engineering Dept. RE: Freeport Parkway/Southwestern Blvd. radius enlargement Date: July 2, 1997 This is in reference to the radius enlargement at the N.E. corner of Freeport Parkway & Southwestern Boulevard. Before the improvement was constructed, I sent a letter to G.T.E. on March 12, 1997 requesting a timeline on how long it would take a G.T.E. to relocate the existing vaull~ and cables along Southwestern & Freeport Parkway. On March 17, 1997, I received a letter back from Mac Beth Whaley at G.T.E. stating they have completed work to relocate lines out of the proposed turn radius on the northeast corner of the intersection, and the vault can be demolished during the construction of the radius. I have attached the letter for your information. Abcon Paving was contracted to begin the radius enlargement on April 15, 1997. According to the contractor, the irrigation line was already cut before the work on the radius had started. All work on the enlargement of the radius at the northeast corner of the intersection was in the city's R.O.W. I have attached an exhibit for your information. If you have any questions, let me know. ap freptrad. rnrn i! 'I 1;i T ! I I II" ~ NORTH NOR'H \ GTE Telephone Operations Central Area March 17, 1997 City of Coppell P. O. Box 478 Coppell, Texas 75019 Attn: Mr. Atul I. Patei- Re: Proposed radius enlargement Freeport Pkwy. & Southwestern Blvd. Dear Mr. Patel: GTE has completed work to relocate lines out of the proposed turn radius on the northeast corner of this intersection. We abandoned the vault in place; it can be demolished during your construction process. If I can answer any questions on this matter, please contact me at (972) 318-3832. Sincerely, Mae Beth Whaley Engineer, O.S. P. GTE Service Corporation/A part of GTE Corporation