Gunner Sub-CS 990525P.O. Box 478 Coppell, Texas 75019 972-462-0022 May 2S~ 1~ J. Tab Neblett, Asst. Vice President WHRL Real Estate Limited Partnership 600 Las Colinas Blvd., Suite 1900 Irving, TX 75039 RE: Fairway Drive Project # ST 96-04 Dear Mr. Neblett: This letter is written as a follow-up to the agreement approved by the City of Coppell on October 14, 1997 concerning a cost sharing on the traffic signal at Fairway Drive/Belt Line Road. At the time of the agreement, the estimated cost of a'traffic signal was approximately $85,000. Included with this letter is a copy of our final pay estimate from the contractor with items pertaining to the traffic signal highlighted. The total cost to the City of Coppell for the traffic signal was $125,135.10. This includes the following: Items 18-23/Street markings Items 29-33/Conduits Items 34-41/Wiring Item 42/Opticon Item 43/Railroad interconnect wiring Item 44-45/Loop detector and hardware Item 46/Controller Items 47-49/Foundations Items 50-52/Signal poles and Mask arms Items 53-55/Signal heads and backplates Items 56-57fPedestrian assemblies Items 58/Electric Service Items 59 & 60/Pull boxes Item 6If Display board Items 62-65/Traffic sign poles/foundations Items 66-69/Traffic signs Item 70/Street name Total $2,759.80 20,306.90 14,230.40 2,800.00 214.50 7,911.50 24,000.00 6,392.00 14,200.00 10,920.00 5,840.00 2,000.00 7,500.00 2,800.00 760.00 $125,135.10 It is my opinion that the cost of the traffic signal exceeded estimates because it was part of a street project and the traffic signal contractor was a subcontractor to the street paving contractor. We awarded a project in January 1999 for a very similar traffic si?sd along Denton Tap Road at a total cost of $97,300. That was a stand-alone project of which the low bidder was a contractor who specializes only in the installation of traffic signals. To try to be as fair as possible and to stay somewhat close to the estimated $85,000, I have reevaluated the bid items and am prepared to base your 1/3 cost share on a total value of $92,049.30. This number is comprised of the following: Items 29-33/Conduits Items 34-41/Wiring Item 46/Controller Items 47-49/Foundatious Item~ S0-52/Signal poles and mast arran Items 53-55/Signal heads and backplates Item 58/Electric service Total 6,392.00 10,920.00 2,000.00 $92,049.30 All of these components would not constitute a completed traffic signal installation since it does not include items such as markings, loop detectors, traffic signage, etc. However, they do constitute the bulk of the items necessary for the construction of a traffic signal. Your cost share of the $92,049.30 would be $30,683.10. In order for the City to f'mal out thlg project please remit a check in the amount of $30,683.10 in accordance with paragraph 2 of the Traffic Signalization Cost Sharing Agreement. I hope that you agree that my analysis of the costing is fair, however, if you should have any questions please feel free to contact me at your convenience. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering and Public Works cc: Jim Witt, City Manager Cit of Coppell Project No: ST 9]~-04; P.O.# 98-0003203-00¶ --"",7 .... ! r f · fContractoc No.: 5 & Final Revised Pay Estimate . Rebcon, Inc. Project Name: Faimmy Drive 1868 W. Northwest Hwy City of Coppell Dallas, TX 75220 Estimate Pedod: 12/01/98 - 1/31/99 RI Job # 9811 ~ UNIT CON~CT QTY UNIT WORK COMP ITEM DESCRIPTION MEAS QUANTITY TO DATE PRICE TO DATE I PREP ROW LS 1.0 I $32,000.00 $32,000.06 2 UNCL STREET EXCAV CY 140.0 0 $19.00 SO.0( 3 BORROW CY 2750.0 2213 $10.00 $22,130.00 4 REM EXIST CONC PVMT SY 210.0 139 $10.00 $1,390.00 5 6" 650 FLEX (~ 7 DAY PVMT SY 520.0 548.4 $69.00 $37,839.601 6 6" CURB LF 273.0 255i $2.00 $510.00 7 CONC STR_;ET HEADER LF 37.0 0 $9.00 S0.00 8 CONC RAILROAD HEADER LF 74.0 74 $15.00 $1,110.00 9 6" LIME STAB SUBGRADE SY 725.0 667 $7.00 $4,669.00 10 LIME (30~/SY) TON 11.0~ 10 $98.00 $980.00 11 4" 3000 PSI CONC SIDEWALK SF 830.0 954.8 $4.00 $3,819.20 12 UNI-DECOR PAVING STONE ON CONC SF 620.0 696 $9.00 $6,264.00 13 HOLLAND PAVING STONE ON CONC LF 34.0 0 $20.00 SO.00 14 VlONO MEDIAN SY 21.0 19.4 $90.00 $1,746.00 15 6" TOPSOIL CY 375.0 375 $25.00 $9,375.0(; 16. HYDROMULCH SY 1750.0 0 $3.00 S0.1X) 17 SOLID SOD BUFFALO GRASS SY 140.0 0 $5.00 $0.0( 18 4" LANE STRIPE WHITE · LF 72.0 52 $2.00 $104.0~. 19 8" LANE STRIPE YELLOW · LF 104.0 102 $3.40 $346.8(~ 20 18" WIDE STOP LINE WHITE · LF 115.0 127 $7.00 $889.00 21 24" WIDE STOP LINE WHITE o..~' , LF 36.0 65 $8.00 $520.00 -- 22 ADV MARKER ARROW & ONLY · EA 1.0 1 $500.00 $500.00 23 ADV MARKER STRAIGHT & ARROW · EA 1.0 1 $400.00 24 ADV MARKER R-X-R EA 2.0 3 $500.00 $1,500.00 25 MBGF W/TERM ANCH EA 2.0 2 $1,700.00 $3,400.00 26 PRE-CAST CONC RR CROSSING LF 63.0 63 $300.00 $18,900.00i ~' 27 RR TRACK WORK LS 1.0 1 $35,000,00 $35,000.00 ~ 28 EROSION CONTROL LS 1.0 0 $5,000.00 $0.00 -" 29 1" PVC SCH 40 TRENCHED o LF 172.0 346 $2.50 $865.00 --- 30 2" PVC SCH 40 TRENCHED · LF 3649.0 4065 $3.40 $13,821.00 ~ 31 3- PVC SCH 40 TRENCHED · LF 387.0 173 $5.30 $916.90 32 3" PVC SCH 40 BOF~;n , LF 204.0 262 $17.00 $4,454.00 -- 33 4" PVC SCH 40 TRENCHED · LF 18.0 25 $10.00 $250.00 34 ELECT CONDTR #8 XHHW · LF 465.0 471 $0.60 $282.60 ~ 35 SOLID COPPER 12 CONDTR #18 AWG · LF 2809.0 3020 $1.50 $4,530.0~ ~ 36 SIGNAL CABLE 16 CONDTR #12 AWG , LF 526.0 600 $4.00 $2,400.00 ~ 37 NO 14 DETECTOR LOOP LEAD IN · LF I~Z5.0 7942 $0.60 $4,765~'~0 ~ 38 SIGNAL CABLE 5 CONDTR #16 AWG o LF 468.0 493 $1.20 $591.00 39 SIGNAL CABLE 7 CONDTR #16 AWG , LF 234.0 250 $1.70 $425.00 ~ 40 13 CONDTR ~6 POWER , LF 209.0 280 $2.00 $560.00 / 41 OPTICOM CABLE 3 CONDTR #20 AWG · LF 673.0 520 $1.30 $676.00 ~ 42 3 M OPTICOM DETECTOR , EA 4.0 4 $700.00 $2,800.00 43 INTERCONNECT 2 CONDTR #14 AWG · LF 194.0 195 $1.10 $214.50 ~ 44 LOOP DET INSTALLATION , LF 1820.0 1447 $4.50 $6,511.50 ~ 45 DIGITAL LOOP DET VEHICLE DET 2 CHAN · EA 7.0 7 $200.00 $1,400.00 ,' 46 S20A MULT~SO~C S PHASE N_~'u~ ~ ~ ~R W~ C..~Nm' · EA 1.0 1 $24,000.00 $24,000.00 ~ 47 FOUNDATION TY 30-B WI CASING ~ LF 13.0 13 $84.00 $1,092.0( ' 48 FOUNDATION 'FY 36-A WI CASING , LF 45.0 45 $100.00 $4,500.0( ~ 49 CONTROLLER FOUNDATION * CY 2.0 2 $400.00 $800.0( ~' 50'SIGNAL POLE W/30' MAST ARM o EA 1.0 I $3,000.00 $3,000.0C ~ 51 SIGNAL POLE WI 36' MAST ARM * EA 1.0 I $3,200.00 $3,200.0( ~ 52 SIGNAL POLE WI 44' MAST ARM ' EA 2.0 2 $4,000.50 $8,000.0(,~ '~ 53 12" TRAFFIC SIGNAL HEAD · EA 50.0 50 $200.00 $10,000.0( .~ 54 TRAF SIG 3 SECT HEAD BACKPLATE · EA 10.0 10 $60.00 $600.00., 55 TRAF SIG 5 SECT HEAD BACKPI.ATE · EA 4.0 4 $80.00 $320.00~ ,~ 561PRED SIG ASSEMBLEY 2 INDICATION 5~PED PUSH BUTTON 581SERVICE METER INSTALLATION · 591TY A GROUND PULL BOX 1TY C GROUND PULL BOX INTERSECTION DISPLAY BOARD TRAF SIGN WLO-1 POLE & CONC FOUND TRAF SIGN W3-3 POLE & CONC FOUND TRAF SIGN W10-2L POLE & CONC FOUND TRAF SIGN WIO-2R POLE & CONC FOUND TRAF SIGN R10-12 TRAF SIGN R10-4bR TRAF SIGN R10-4bL TRAF SIGN R3-SLR STREET NAME SIGNS ON MAST ARM MOUNTED BARRICADE UPLOAD/DOWNLOAD DEVICE EXTRA WORK 8.0 8.0 1.0 15.0 1.0 1.0 4.0 2.0 1.0 1.0 4.0 4.0 1.0 1 4.0 50.0 1.0 0.0 $0.00 $0.00 "'"' $0.00 ~ Work Completed to Date: Less 0% Retainage: Less Previous Payments: Total Due This Estimate: Calendar Days for Final Completion: 180 Recommended forJ;~j~'Tent: t Garreth~_,aT~-pbell. ~ns~n Ins~r Kehnd~ M. G~n( P.E[Oi~r of E~~ & Pu~ Wo~ REBCON, IN~ Data: l ? Calendar Days Remarks: $310,767.90t Used To Date: 180 b~- -- +~, +~9 + Zo + +ZT_ 865.00 13,821'00 916'90 4,454'00 250'00 282'50 4,530'00 2,400'00 4,765'20 591'60 425'00 560.00 575.00 2,800'00 214.50 5,511'50 1,400'00 3,250'30 8,300'00 1Z,ZCO'O0 620'00 4,8C0'00 1,C40'00 2,~C0'00 7,..~u ~0 5CO.O0 9SO.O0 400.00 420.00 4C0.00 80.C0 80.00 2CC.00 1,6C0.00 150,447"10 +~ +¢~ +56 + ~q +~ +~¢ +4¢ +~. +~ +~ + ~ +5~ + ¢4 +55. +5~ +5~ +~l +¢~ ~ +~ ~w