Gunner Sub-CS 990525P.O. Box 478
Coppell, Texas 75019
972-462-0022
May 2S~ 1~
J. Tab Neblett, Asst. Vice President
WHRL Real Estate Limited Partnership
600 Las Colinas Blvd., Suite 1900
Irving, TX 75039
RE: Fairway Drive Project # ST 96-04
Dear Mr. Neblett:
This letter is written as a follow-up to the agreement approved by the City of Coppell on
October 14, 1997 concerning a cost sharing on the traffic signal at Fairway Drive/Belt Line
Road. At the time of the agreement, the estimated cost of a'traffic signal was approximately
$85,000. Included with this letter is a copy of our final pay estimate from the contractor
with items pertaining to the traffic signal highlighted.
The total cost to the City of Coppell for the traffic signal was $125,135.10. This includes the
following:
Items 18-23/Street markings
Items 29-33/Conduits
Items 34-41/Wiring
Item 42/Opticon
Item 43/Railroad interconnect wiring
Item 44-45/Loop detector and hardware
Item 46/Controller
Items 47-49/Foundations
Items 50-52/Signal poles and Mask arms
Items 53-55/Signal heads and backplates
Items 56-57fPedestrian assemblies
Items 58/Electric Service
Items 59 & 60/Pull boxes
Item 6If Display board
Items 62-65/Traffic sign poles/foundations
Items 66-69/Traffic signs
Item 70/Street name
Total
$2,759.80
20,306.90
14,230.40
2,800.00
214.50
7,911.50
24,000.00
6,392.00
14,200.00
10,920.00
5,840.00
2,000.00
7,500.00
2,800.00
760.00
$125,135.10
It is my opinion that the cost of the traffic signal exceeded estimates because it was part of a
street project and the traffic signal contractor was a subcontractor to the street paving
contractor. We awarded a project in January 1999 for a very similar traffic si?sd along
Denton Tap Road at a total cost of $97,300. That was a stand-alone project of which the
low bidder was a contractor who specializes only in the installation of traffic signals.
To try to be as fair as possible and to stay somewhat close to the estimated $85,000, I have
reevaluated the bid items and am prepared to base your 1/3 cost share on a total value of
$92,049.30. This number is comprised of the following:
Items 29-33/Conduits
Items 34-41/Wiring
Item 46/Controller
Items 47-49/Foundatious
Item~ S0-52/Signal poles and mast arran
Items 53-55/Signal heads and backplates
Item 58/Electric service
Total
6,392.00
10,920.00
2,000.00
$92,049.30
All of these components would not constitute a completed traffic signal installation since it
does not include items such as markings, loop detectors, traffic signage, etc. However, they
do constitute the bulk of the items necessary for the construction of a traffic signal. Your
cost share of the $92,049.30 would be $30,683.10.
In order for the City to f'mal out thlg project please remit a check in the amount of
$30,683.10 in accordance with paragraph 2 of the Traffic Signalization Cost Sharing
Agreement. I hope that you agree that my analysis of the costing is fair, however, if you
should have any questions please feel free to contact me at your convenience.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
cc: Jim Witt, City Manager
Cit of Coppell Project No: ST 9]~-04; P.O.# 98-0003203-00¶
--"",7 .... ! r f ·
fContractoc No.: 5 & Final Revised
Pay
Estimate
. Rebcon, Inc. Project Name: Faimmy Drive
1868 W. Northwest Hwy City of Coppell
Dallas, TX 75220 Estimate Pedod: 12/01/98 - 1/31/99
RI Job # 9811
~ UNIT CON~CT QTY UNIT WORK COMP
ITEM DESCRIPTION MEAS QUANTITY TO DATE PRICE TO DATE
I PREP ROW LS 1.0 I $32,000.00 $32,000.06
2 UNCL STREET EXCAV CY 140.0 0 $19.00 SO.0(
3 BORROW CY 2750.0 2213 $10.00 $22,130.00
4 REM EXIST CONC PVMT SY 210.0 139 $10.00 $1,390.00
5 6" 650 FLEX (~ 7 DAY PVMT SY 520.0 548.4 $69.00 $37,839.601
6 6" CURB LF 273.0 255i $2.00 $510.00
7 CONC STR_;ET HEADER LF 37.0 0 $9.00 S0.00
8 CONC RAILROAD HEADER LF 74.0 74 $15.00 $1,110.00
9 6" LIME STAB SUBGRADE SY 725.0 667 $7.00 $4,669.00
10 LIME (30~/SY) TON 11.0~ 10 $98.00 $980.00
11 4" 3000 PSI CONC SIDEWALK SF 830.0 954.8 $4.00 $3,819.20
12 UNI-DECOR PAVING STONE ON CONC SF 620.0 696 $9.00 $6,264.00
13 HOLLAND PAVING STONE ON CONC LF 34.0 0 $20.00 SO.00
14 VlONO MEDIAN SY 21.0 19.4 $90.00 $1,746.00
15 6" TOPSOIL CY 375.0 375 $25.00 $9,375.0(;
16. HYDROMULCH SY 1750.0 0 $3.00 S0.1X)
17 SOLID SOD BUFFALO GRASS SY 140.0 0 $5.00 $0.0(
18 4" LANE STRIPE WHITE · LF 72.0 52 $2.00 $104.0~.
19 8" LANE STRIPE YELLOW · LF 104.0 102 $3.40 $346.8(~
20 18" WIDE STOP LINE WHITE · LF 115.0 127 $7.00 $889.00
21 24" WIDE STOP LINE WHITE o..~' , LF 36.0 65 $8.00 $520.00 --
22 ADV MARKER ARROW & ONLY · EA 1.0 1 $500.00 $500.00
23 ADV MARKER STRAIGHT & ARROW · EA 1.0 1 $400.00
24 ADV MARKER R-X-R EA 2.0 3 $500.00 $1,500.00
25 MBGF W/TERM ANCH EA 2.0 2 $1,700.00 $3,400.00
26 PRE-CAST CONC RR CROSSING LF 63.0 63 $300.00 $18,900.00i ~'
27 RR TRACK WORK LS 1.0 1 $35,000,00 $35,000.00 ~
28 EROSION CONTROL LS 1.0 0 $5,000.00 $0.00 -"
29 1" PVC SCH 40 TRENCHED o LF 172.0 346 $2.50 $865.00 ---
30 2" PVC SCH 40 TRENCHED · LF 3649.0 4065 $3.40 $13,821.00 ~
31 3- PVC SCH 40 TRENCHED · LF 387.0 173 $5.30 $916.90
32 3" PVC SCH 40 BOF~;n , LF 204.0 262 $17.00 $4,454.00 --
33 4" PVC SCH 40 TRENCHED · LF 18.0 25 $10.00 $250.00
34 ELECT CONDTR #8 XHHW · LF 465.0 471 $0.60 $282.60 ~
35 SOLID COPPER 12 CONDTR #18 AWG · LF 2809.0 3020 $1.50 $4,530.0~ ~
36 SIGNAL CABLE 16 CONDTR #12 AWG , LF 526.0 600 $4.00 $2,400.00 ~
37 NO 14 DETECTOR LOOP LEAD IN · LF I~Z5.0 7942 $0.60 $4,765~'~0 ~
38 SIGNAL CABLE 5 CONDTR #16 AWG o LF 468.0 493 $1.20 $591.00
39 SIGNAL CABLE 7 CONDTR #16 AWG , LF 234.0 250 $1.70 $425.00 ~
40 13 CONDTR ~6 POWER , LF 209.0 280 $2.00 $560.00 /
41 OPTICOM CABLE 3 CONDTR #20 AWG · LF 673.0 520 $1.30 $676.00 ~
42 3 M OPTICOM DETECTOR , EA 4.0 4 $700.00 $2,800.00
43 INTERCONNECT 2 CONDTR #14 AWG · LF 194.0 195 $1.10 $214.50 ~
44 LOOP DET INSTALLATION , LF 1820.0 1447 $4.50 $6,511.50 ~
45 DIGITAL LOOP DET VEHICLE DET 2 CHAN · EA 7.0 7 $200.00 $1,400.00 ,'
46 S20A MULT~SO~C S PHASE N_~'u~ ~ ~ ~R W~ C..~Nm' · EA 1.0 1 $24,000.00 $24,000.00 ~
47 FOUNDATION TY 30-B WI CASING ~ LF 13.0 13 $84.00 $1,092.0( '
48 FOUNDATION 'FY 36-A WI CASING , LF 45.0 45 $100.00 $4,500.0( ~
49 CONTROLLER FOUNDATION * CY 2.0 2 $400.00 $800.0( ~'
50'SIGNAL POLE W/30' MAST ARM o EA 1.0 I $3,000.00 $3,000.0C ~
51 SIGNAL POLE WI 36' MAST ARM * EA 1.0 I $3,200.00 $3,200.0( ~
52 SIGNAL POLE WI 44' MAST ARM ' EA 2.0 2 $4,000.50 $8,000.0(,~ '~
53 12" TRAFFIC SIGNAL HEAD · EA 50.0 50 $200.00 $10,000.0( .~
54 TRAF SIG 3 SECT HEAD BACKPLATE · EA 10.0 10 $60.00 $600.00.,
55 TRAF SIG 5 SECT HEAD BACKPI.ATE · EA 4.0 4 $80.00 $320.00~ ,~
561PRED SIG ASSEMBLEY 2 INDICATION
5~PED PUSH BUTTON
581SERVICE METER INSTALLATION
· 591TY A GROUND PULL BOX
1TY C GROUND PULL BOX
INTERSECTION DISPLAY BOARD
TRAF SIGN WLO-1 POLE & CONC FOUND
TRAF SIGN W3-3 POLE & CONC FOUND
TRAF SIGN W10-2L POLE & CONC FOUND
TRAF SIGN WIO-2R POLE & CONC FOUND
TRAF SIGN R10-12
TRAF SIGN R10-4bR
TRAF SIGN R10-4bL
TRAF SIGN R3-SLR
STREET NAME SIGNS ON MAST ARM
MOUNTED BARRICADE
UPLOAD/DOWNLOAD DEVICE
EXTRA WORK
8.0
8.0
1.0
15.0
1.0
1.0
4.0
2.0
1.0
1.0
4.0
4.0
1.0 1
4.0
50.0
1.0
0.0
$0.00
$0.00 "'"'
$0.00 ~
Work Completed to Date:
Less 0% Retainage:
Less Previous Payments:
Total Due This Estimate:
Calendar Days for Final Completion: 180
Recommended forJ;~j~'Tent:
t
Garreth~_,aT~-pbell. ~ns~n Ins~r
Kehnd~ M. G~n( P.E[Oi~r of E~~ & Pu~ Wo~
REBCON, IN~
Data: l ?
Calendar Days
Remarks:
$310,767.90t
Used To Date:
180
b~- --
+~,
+~9
+ Zo
+
+ZT_
865.00
13,821'00
916'90
4,454'00
250'00
282'50
4,530'00
2,400'00
4,765'20
591'60
425'00
560.00
575.00
2,800'00
214.50
5,511'50
1,400'00
3,250'30
8,300'00
1Z,ZCO'O0
620'00
4,8C0'00
1,C40'00
2,~C0'00
7,..~u ~0
5CO.O0
9SO.O0
400.00
420.00
4C0.00
80.C0
80.00
2CC.00
1,6C0.00
150,447"10
+~
+¢~