Loading...
Gunner Sub-CS 980202,--. DEVELOPMENT FEE TABLE Project: Date: Gunner Addition, Phase H 2/2/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $11,925.00 $11,925.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic/Fire) $9,628.50 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation) $0.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic/Fire) $70.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Irrigation) $0.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $10,800.00 $10,800.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $100.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $100.00 (100% due at Issuance of Building Permit) Park Fee $0. O0 Fee Waived Per (100% due prior to Council Approval) Or01,~,¢e # 91500-A-182 Roadway Impact Fee $3 6,682.50 $36,682.50 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this tLrne Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $69,406.00 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $59,407.50 DEVELOPMENT FEE WORKSHEET PROJECT: Gunner Addition, Phase II DATE: 1/26/98 Water Impact Fee: Domestic Meter(s): 1 - 3 inch 1 - 2 inch = Irrigation Meter(s): -- Fireline Meter(s): I - 6 inch = 1 - 4 inch -- 16 8 2.5 0 Total #: 26.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of mater) Water Meter Fee (Domestic/Fire): Total #: 1 3"X6" Meter(s) @ $5,580.75 Total #: 1 2"X4" Meter(s) @ $4,047.75 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation): Total #: 0 Irrigation Meter(s) @ (100% due prior to issuance of water meters) $0.00 Water Meter Deposit Fee (Domestic/Fire): Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Water Meter Deposit Fee (Irrigation): Total #: 0 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 24 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) ESU's ESU's ESU's ESU's ESU's $11,925.00 $100.00 $5,580.75 $4,047.75 $0.00 $70.00 $0.00 $10,800.00 $100.00 $100.00 Page 3 DI:VELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ 8150.00 / Lot Multi-family @ 875.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ 8350.00 / Lot Multi-family @ 8350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A 25O Single-family @ 81285.00 / Lot Multi-family @ 81285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, 8292.60 per light will be assessed. (100% due prior to final acceptance of development) N/A N/A N/A N/A N/A * 8321,250.00 836,682.50 Information not available at this time Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Information not available at this time Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) * This fee is waived per City Ordinance # 91500-A-182 Need submittal of development contracts Page 4 ROAD"WAY IMPACT FEE CALCULATIONS PROJECT: DATE: Gunner Addition, Phase H 2/2/98 ROADWAY IMPACT FEE: Service Area * 8 Category ** Residential Land Use ** Buildin~ Size (Sq. Ft.) Development Units ** Vehicle Miles per Development Unit ** iFee per Vehicle Mile *** Multi-Family N/A 250 2.01 $73 Roadway Impact Fee due = (Development Units) x Vehicle Miles Per Development Unit) x (Fee per Vehicle Mile) = $36,682.50 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) DEVELOPMENT FEE TABLE Project: Date: Gunner Addition, Phase I 1/26/98 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $0.00 Fee Waived Per (100% due prior to Council Approval) Ord~ce # 91500-A-182 Water Tap Inspection Fee $0.00 Fee Waived Per (100% due at Issuance of Water Meter) Ord~e # 9~00-Aa82 Water Meter Fee (Domestic/Fire) $9,628.50 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation) $195.98 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic/Fire) $70.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Irrigation) $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 Fee Waived Per (100% due prior to Council Approval) O~di,-,nce # 91500-n-182 Wastewater Tap Inspection Fee $0.00 Fee Waived Per (100% due at Issuance of Building Permit) O~diaa=e # 91500-A-182 Utility Final Inspection Fee $0.00 Fee Waived Per (100% due at Issuance of Building Permit) Ordi.ance # 91500-A-152 Park Fee $0.00 Fee Waived Per (100% due prior to Council Approval) Oramnce # 9XS00-A-X82 Roadway Impact Fee $0.00 Fee Waived Per (100% due prior to Council Approval) Ordi,,ance ~ 91500-A-182 Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100 % due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $9,924.48 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00 ,,-.. DEVELOPMENT FEE WORKSHEET PROJECT: Gunner Addition, Phase I DATE: 1/26/98 Water Impact Fee: Domestic Meter(s): 1 - 3 inch = 1 - 2 inch = Irrigation Meter(s): I - 2 inch -- Fireline Meter(s): I - 6 inch = 1 - 4 inch = 16 8 8 2.5 0 Total #: 34.5 ESU's @ $450.00 ea. (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 3 Connections @ $50.00 ea. (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Domestic/Fire): Total #: 1 3"X6" Meter(s) @ $5,580.75 Total #: 1 2"X4" Meter(s) @ $4,047.75 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Water Meter Fee (Irrigation): Total #: 1 Irrigation Meter(s) @ (100% due prior to issuance of water meters) $195.98 Water Meter Deposit Fee (Domestic/Fire): Total #: 2 Meter(s) @ $35.00 ea. (100% due prior to issuance of water meters) Water Meter Deposit Fee (Irrigation): Total #: 1 Meter(s) @ $30.00 ea. (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU' 24 @ $450.00 ea. Wastewater Tap Inspection Fee: Total #: 2 Connections @ $50.00 ea. (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 2 Lots @ $50.00 ea. (100% due prior to issuance of building permit) * Fees waived as per Ordinance # 91500-A-182 ESU's ESU's ESU's ESU's ESU's * $15,525.00 * $150.00 $5,580.75 $4,047.75 $195.98 $70.00 $30.00 , $10,800.00 . $100.00 * $100.00 Page 3 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A N/A Single-family @ $150.00 / Lot Multi-family @ $75.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after June 23, 1992: N/A N/A Single-family @ $350.00 / Lot Multi-family @ $350.00 / Unit (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) Preliminary plat approved after October 26, 1993: N/A 35O Single-family @ $1285.00 / Lot Multi-family @ $1285.00 / Unit (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) Street Lighting Fees: Assessed for lighting in the City's right-of-way. This fee cannot be assessed until after T.U. Electri'c submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Assessed for signage in the City's right-of-way. (See attached fee calculations if applicable) Construction Inspection Fees: A copy of the development contract must be submitted for assessment. The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) * Fees waived as per Ordinance # 91500-A-182 N/A N/A N/A N/A N/A * $449,750.00 * $51,355.50 Information not available at this time Information not available at this time Page 4 ,,.,,, ROADWAY IMPACT FEE CALCULATIONS PROJECT: DATE: Gunner Addition, Phase I 1/26/98 ROADWAY IMPACT FEE: Service Area * 8 Category ** Residential Land Use ** Su~dm~ Size (sq. rt.) Development Units ** Vehicle Miles per Development Unit ** Fee per Vehicle Mile *** Multi-Family N/A 35O 2.01 $73 Roadway Impact Fee due = (Development Units) x Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $51,355.50 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study)