Gunner Sub-CS 980202,--.
DEVELOPMENT FEE TABLE
Project:
Date:
Gunner Addition, Phase H
2/2/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $11,925.00 $11,925.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic/Fire) $9,628.50
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation) $0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic/Fire) $70.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Irrigation) $0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $10,800.00 $10,800.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $100.00
(100% due at Issuance of Building Permit)
Park Fee $0. O0 Fee Waived Per
(100% due prior to Council Approval) Or01,~,¢e # 91500-A-182
Roadway Impact Fee $3 6,682.50 $36,682.50
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this tLrne
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $69,406.00
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $59,407.50
DEVELOPMENT FEE WORKSHEET
PROJECT: Gunner Addition, Phase II
DATE: 1/26/98
Water Impact Fee:
Domestic Meter(s): 1 - 3 inch
1 - 2 inch =
Irrigation Meter(s): --
Fireline Meter(s): I - 6 inch =
1 - 4 inch --
16
8
2.5
0
Total #: 26.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of mater)
Water Meter Fee (Domestic/Fire):
Total #: 1 3"X6" Meter(s) @ $5,580.75
Total #: 1 2"X4" Meter(s) @ $4,047.75
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation):
Total #: 0 Irrigation Meter(s) @
(100% due prior to issuance of water meters)
$0.00
Water Meter Deposit Fee (Domestic/Fire):
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Irrigation):
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
24
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
ESU's
ESU's
ESU's
ESU's
ESU's
$11,925.00
$100.00
$5,580.75
$4,047.75
$0.00
$70.00
$0.00
$10,800.00
$100.00
$100.00
Page 3
DI:VELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ 8150.00 / Lot
Multi-family @ 875.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ 8350.00 / Lot
Multi-family @ 8350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
25O
Single-family @ 81285.00 / Lot
Multi-family @ 81285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, 8292.60 per light will be assessed.
(100% due prior to final acceptance of development)
N/A
N/A
N/A
N/A
N/A
* 8321,250.00
836,682.50
Information not
available at this time
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not
available at this time
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
* This fee is waived per City Ordinance # 91500-A-182
Need submittal of
development contracts
Page 4
ROAD"WAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Gunner Addition, Phase H
2/2/98
ROADWAY IMPACT FEE:
Service Area * 8
Category ** Residential
Land Use **
Buildin~ Size (Sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
iFee per Vehicle Mile ***
Multi-Family
N/A
250
2.01
$73
Roadway Impact Fee due = (Development Units) x
Vehicle Miles Per Development Unit) x (Fee per Vehicle Mile) = $36,682.50
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
DEVELOPMENT FEE TABLE
Project:
Date:
Gunner Addition, Phase I
1/26/98
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $0.00 Fee Waived Per
(100% due prior to Council Approval) Ord~ce # 91500-A-182
Water Tap Inspection Fee $0.00 Fee Waived Per
(100% due at Issuance of Water Meter) Ord~e # 9~00-Aa82
Water Meter Fee (Domestic/Fire) $9,628.50
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation) $195.98
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic/Fire) $70.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Irrigation) $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00 Fee Waived Per
(100% due prior to Council Approval) O~di,-,nce # 91500-n-182
Wastewater Tap Inspection Fee $0.00 Fee Waived Per
(100% due at Issuance of Building Permit) O~diaa=e # 91500-A-182
Utility Final Inspection Fee $0.00 Fee Waived Per
(100% due at Issuance of Building Permit) Ordi.ance # 91500-A-152
Park Fee $0.00 Fee Waived Per
(100% due prior to Council Approval) Oramnce # 9XS00-A-X82
Roadway Impact Fee $0.00 Fee Waived Per
(100% due prior to Council Approval) Ordi,,ance ~ 91500-A-182
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100 % due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $9,924.48
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $0.00
,,-..
DEVELOPMENT FEE WORKSHEET
PROJECT: Gunner Addition, Phase I
DATE: 1/26/98
Water Impact Fee:
Domestic Meter(s): 1 - 3 inch =
1 - 2 inch =
Irrigation Meter(s): I - 2 inch --
Fireline Meter(s): I - 6 inch =
1 - 4 inch =
16
8
8
2.5
0
Total #: 34.5 ESU's @ $450.00 ea.
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic/Fire):
Total #: 1 3"X6" Meter(s) @ $5,580.75
Total #: 1 2"X4" Meter(s) @ $4,047.75
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation):
Total #: 1 Irrigation Meter(s) @
(100% due prior to issuance of water meters)
$195.98
Water Meter Deposit Fee (Domestic/Fire):
Total #: 2 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Water Meter Deposit Fee (Irrigation):
Total #: 1 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU'
24
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 2 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 2 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
* Fees waived as per Ordinance # 91500-A-182
ESU's
ESU's
ESU's
ESU's
ESU's
* $15,525.00
* $150.00
$5,580.75
$4,047.75
$195.98
$70.00
$30.00
, $10,800.00
. $100.00
* $100.00
Page 3
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
Preliminary plat approved after October 26, 1993:
N/A
35O
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electri'c submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
* Fees waived as per Ordinance # 91500-A-182
N/A
N/A
N/A
N/A
N/A
* $449,750.00
* $51,355.50
Information not
available at this time
Information not
available at this time
Page 4
,,.,,,
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
Gunner Addition, Phase I
1/26/98
ROADWAY IMPACT FEE:
Service Area * 8
Category ** Residential
Land Use **
Su~dm~ Size (sq. rt.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Multi-Family
N/A
35O
2.01
$73
Roadway Impact Fee due = (Development Units) x
Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) =
$51,355.50
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)