Gunner P2-LR000822 TERRA-MAR, LNC.
GEOTECI~NICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW ,-tUSTIN
i ! 050.4bles Lane. Dallas. Texas 75229 Phone:972-488-8800
REPORT OF CONCRETE PLACEMENT
CLIENT: North .-Mnerican Conmaunities DISTRIBUTION:
PROJECT: Karrington Apartments .&chon Group - .&~gie Rawie
TMI REPORT #: DC00-040-084 North American Conununities - Kurt Heinbecker
REPORT DATE: 8.'22.00 C.D. Construction - Garreth Campbell
SERVICE DATE: 8.'17.'00 City ofCoppell - Greg Jones
CONCRETE FOR: Paving
CUBIC YARDS PLACED: 300 DESIGN IDENTIFICATION: 8203
READY MLX PLANT: TX1
TIME OF POUR: START: 5:00 ,-U\,l FINISH: 11:30
CONCRE. TE TEMPERATURE IL-kNGE: 85 to 95 AIR TEMP. IL-kNGE: 105
SLUMP RANGE: Y' to 5" ENTRAINED AIR RANGE: 3'°."0 to 5%
TEST CYLINDER OR BEAM ID: KAR 081701 - 081712
TECHNICL-~N: Moe II
TLME: 6 I."2 hours
COMMENTS OR PROBLEMS:
sd
This report may not be reproduced except in its entirety, without ~/o~
the wril~en consent of'FMl. Resulls apply only' Io ilbo'cc tests. Project Manager