Gunner P2-LR000814 TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL :--~ND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW .dUSTIN
l1050.4blex Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8 14-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 7.'14."00
Slump (in. }: .4 - 6 Sampled By: E. Jennings
Air Content I%): 4 - 6 Weather: (7lear
Concrete Temp {:'F): N.'A Supplier-'Mix: TXI
FIELD DATA: SET #1
Ticket =: 1543893 Time Batched: 6:00 AM Time Sampled: 6:45 AM
Slump ~'in.): 5 Air Content (%): 4 1-2 Unit Weight {pcB:
(eric. Temp. {.:Fi}: 90 Ambient Temp. (¢F): 80 Yardage {c.y.): 4(.~)
Placement Location: Paving - East side drive and parking
Sample Location: Paving - 30' S.: 40' E. of SE comer of building ':4
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YI .INDERS MOLDED AND CURED PER ASTM ('31, TESTED PER ..\S-FM C30. CAPPED PER ASTM(_"'~ ...." ~'
Set v; Cvlinder# Test Date Age Max Load Area Strength Notes
I (Days) (lbs) (sq.in) (psi)
071401 7;21.-'00 7 77760 28.27 2750
071402 8;11."00 28 104290 28.27 3690
071403 8;11.."00 28 100390 28.27 3550
KAR
071404 Discard
(i } NORM.-\L CYI,INDER SIZE 0" X 12". ARE.-\ 23.27 sq. in., UNLESS NOTED ABOVE.
{2.'.. UNBONDI_:D (":\P SYSTEM USED UNLESS O-FHERWISE NOTED ABOVE.
{2) FIE[.I)'I'IZ:,;TS .ARE i ER APPLICABLE .\STM STANDARDS: ('138. C143. C'1 "('231
Page 1 of 6 Project Manager
Note: T~is report is for t~e exclusive use of the client addressed. This re~ort may not ~e reproduced except in its
entirety, without t~e written consent of TMI. Results apply only to a~ove tests.
TERIL4.-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.4LLAS FORT WORTH HOUSTON LONGFIEW ,4 L'STIN
11050.4bles Lane. Dallas. Texm' 75229 Phone.'972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-' 14.-'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 City ofCoppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength l. psil: 3000 Placement Date: 7'14-00
Slump i in.): 4 - 6 Sampled By: E. Jennings
Air Content ~o.,,): 4 - 6 Weather: Clear
Concrete Temp I':F}: N."A Supplier. tX-Iix: TXI
FIELD DATA: SET #2
Ticket '~: 1543920 Time Batched: 8:07 AM Time Sampled: 9:00 AM
Slump {lin.): ~ 1.'2 Air Content !%) 3 1.-2 Unit Weight {.pct'):
Cone. Temp. I ::'[: }: 92 Ambient Temp. {:F'}: 90 Yardage (c.y. 1: 150
Placement Location: Paving - East side drive and parking
Sample Location: Paving - 50' S.: 50' E. of NE comer of building
Remarks: * Seven day compressive strenth indicates that the 28 day may be marginal.
CONCRETE COMPRESSION TEST RESULTS
t'YLINDERS MOI.DED AND CURED PER ASTM C3I. TESTED PER ASTM C39. CAPPED PER ..\STM ('1231
Set ¢ Age Max Load Area Strength
2 Cylinder ~: Test Date (Days) (lbs) (sq.in) (psi) Notes
071405 7.."2l.."00 7 53430 28.27 1890 *
071406 8;11;00 28 88170 28.27 3120
071407 8,"11;00 28 87610 28.27 3100
KAR
07 1408 Discard
~1) NORM\L CYLINDER SIZE 6" X 12"..-\REA 2~.27 sq. in., UNLESS NOTEI)AB()VI-L
(2) L:NBONDED (.'.\1' SYSTEM USED UNLESS OTHERWISE NOTED ABOVE.
(3) FIELD TESTS ARE PER APPLICABLE ..\STM STANDARDS- C138. ('143, C1 ?2. ('23'.
Page 2 of 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONG~"IEW ,4USTIN
l1050.4bles Lane. Dallas. Texas 75229 Phone:972-488-8800 FeLt.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8 14.-'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 Ci~' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 7..14 00
Slump {in.): 4 - 6 Sampled By: E. Jennings
Air Content {"i,): 4 - 6 Weather: Clear
Concrete Temp {':F): N.'A Supplier.'Mix: TXI
FIELD DATA: SET #3
Ticket #: 1543951 Time Batched: 9:40 A*-I Time Sampled: 10:35 AM
Slump (in. ~: ~ Air Content (%): ~ 1-,_" Unit Wei~,ht~ ~pcfl:
Conc. Temp. {:F): 95 Ambient Temp. {.:F): 96 Yardage {c.y.): 250
Placement kocation: Paving - East side drive and parking
Sample Location: Paving - 10' N.: 60' E. of SE corner of building ~3
Remarks:
CONCRETE COMPRESSION TEST RESULTS
L'YI_INDERS MOLDED AND ('I, jI~.[-_'D PER. ASTM (_'31. TESTED PER AS-I'M C39, CAPPED PER ASTM C~23:
Set .=.' Cylinder # Test Date Age Max Load Area Strength Notes
3 (Days) (lbs) (sq.in) (psi)
071409 7/21/00 7 60380 28.27 2140
071410 8/11/00 28 85260 28.27 3020
071411 8,-'11/00 28 85120 28.27 3010
071412 Discard
t 1~ NORMAL ('YLINDER SIZE 6" X .... ,-' . :\REA 28.27 sc. in.. UNI.ESS NOTED ABOVE.
t2} UNBONDED C.-\P SYSTL:M USED L'Ni. ESS OTHERWISE NOTED ABOVE.
t'3~ FIELD TESTS .-\RE PER .-\PPLICABLE .-XSIM STANDARDS: CI38. C143. C:72. {'231
~ G'~ary D. Dry?~//~/o~
Page 3 of' 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERI~X-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTO:V LONGVIEW .4USTI:V
11050 Ables Lane, Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8-14.-'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength Ipsi~: 3000 Placement Date: 7-'14 00
Slump i in. I: 4 - 6 Sampled By-': E. Jennings
Air Content ~"o): 4 - 6 \Veather: Clear
Concrete Temp I :F): N.-A Supplier. Mix: TXI
FIELD DATA: SET #4
Ticket =: l 181918 Time Batched: 12:05 PM Time Sampled: 1:10 PM
Slump lin.): fi Air Content t°'M: 3 1.2 Unit Weight IpcB:
Conc. -l'emp. I:F!: 98 Ambient Temp. (:'F): 100 Yardage Ic.y. ~: 369
Placement Locanon: Paving - East side drive and parking
Sample Location: Paving - 50' N.: 60' E. of NE corner of building e3
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOLDED AND ('t.'RED PER ASTM (-? 1. TESTED PER .-\STM C39. CAPPED PER ASTM ('i 23 ~
Set # Cy...'linder ~ Test Date Age Max Load Area Strength Notes
4 (Days) (lbs) (sq.in) (psi)
071413 7,"21,"00 7 65090 28.27 2300
071414 8/11/00 28 89480 28.27 3170
071415 8111!00 28 89960 28.27 3180
IC4~R
071416 Discard
(1 '~ NORM.-\L CYLINDER SIZE 6" X 12"..&RE.-\ 2S.27 sq. in. UNI.ESS NOTED AB(.)VIL
~2~ L'NBONDI:D ('AP SYSTEM USED UNI_ESS ()T[-ERX&'ISE NOTED ..\BOVE.
t3i F[EI.D TESTS .',RE ['ER APPLICABI_E ASTM ST..\NDARDS ("[38. C143. (':72. ('231
,a Gar)' i5. Dr>', j'tqa~/o~
Page 4 of 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTO:¥ LONGFJEW AL:STIN
!1050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8. 14.-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 7.-'14'00
Slump (in.): 4 - 6 Sampled By:: E. Jennings
Air Content t°i,l: 4 - 6 Weather: Clear
Concrete Temp i:F): N.'A Supplier. Mix: TXI
FIELD DATA: SET #5
Ticket .=.: 1181931 Time Batched: 2:17 PM Time Sampled: 3:30 PM
Slump (in. ~: ~'~ Air Content !%): 3 1 ~" Unit Weight (pct-):
Conc. Temp. I~F~: 102 Ambient Temp. (~F): 110 Yardage (c.y. ~: 469
Placement Location: Paving - East side drive and parking
Sample Location: Paving - 40' S.: 45' E. of SE corner of building --.2
Remarks:
CONCRETE COMPRESSION TEST RESULTS
("(LINDERS MOLDED AND Ut.'RED PER ASTM C~I. TESTED PER ASTM C.'39. CAPPED PER ASTM (':23~
Set # Cylinder ~-Test Date Age Max Load Area Strength Notes
5 (Days) (lbs) (sq.in) (psi)
071417 7.."2 Ii00 7 68330 28.27 2420
071418 8/11/00 28 102190 28.27 3610
KAR 071419 8/11/00 28 99290 28.27 3510
071420 Discard
II ) NORM..\I_. CYI.INDER SIZE 6" X 12". ARE.-\ 2S.2? ~q. in.. UNLESS NOTED ..\BOVE.
1.2 ~ UNBONDED ( .-\I' SYSTEM USED UNLESS OTHERWISE NOTED ABOVE.
13) FIEi_i)'"~:~ ,_b I 3' ' ' ARE ['ER APPLICABLE &STM S'['ANDARDS ("138. C", 43. ('I ="._. ('231
~a Gar), D. Dr.;', ~//o/oo
Page 5 of 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW AUSTIN
11050.4hies Lane. Dallas. Tt:ras 75229 Phone.'972-488-$800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 851:00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 Cit3,' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 7:14.00
Slump lin. l: 4 - 6 Sampled By: E. Jennings
Air Content ~'o): 4 - 6 Weather: Clear
Concrete Temp (=F): N."A Supplier.Mix: TXI
FIELD DATA: SET #6
Ticket =.: 1181943 Time Batched: 3:58 PM Time Sampled: 5:00 PM
Slump (in. ~: 6 I 2 Air Content (%): 4_ Unit Weight (pcf):
Conc. Temp. t:FJ: 100 Ambient Temp. C:F): 110 Yardage I.c.y.): 569
Placement kocation: Paving - East side drive and parking
Sample Location: Paving - 30' N.: 40' E. of NE corner of building -~2
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYLINDERS M(')LDED AND Ct.'I>,ED PER ASTM C31. TESTED PER AS'tM C30. CAPPED PER ASTM C122- '.
Set .=.' Age Max Load Area Strength
Cylinder.-" Test Date Notes
6 (Days) (lbs) (sq.in) (psi)
071421 7.,'21.."00 7 69820 28.27 2470
071422 8/11/00 28 88860 28.27 3140
071423 8/11/00 28 96180 28.27 3400
KAR
071424 Discard
(I .~ NORMAL £'YLINDER SiZE 6" X '.,;"" ARE..\ 28 ~7 sq. in.. UNLESS NOTED ABOVE.
i2') UNBONDED (':\P SYSTEM L'SED UNLESS O'I'Hi_:Ii:WISE NOTED ABOVE.
i3 ) FIELD TESTS .ARE PER APPLICABLE ASTM STANDARDS: C138. C :43. C ! 72. (_'231
~ Garyb. Dr>', ~/)t,/~o
Page 6 of 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.