Gunner P2-LR000809 TERRA-MAR, INC. -
GEOTECHNICAL ENVIRONMENTAL AND MATERI.4LS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW .4USTIN
11050.4hies Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8-"9-'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-064 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DAIA
Strength (psi): 3000 Placement Date: 7.-'28.'00
Slump (in.): I - ~ Sampled Bv: E. Jennings
Air Content (% ~: 3 - 6 Weather: Clear
Concrete Temp (c F I: N."A Supplier.'Mix: TXI
FIELD DATA: SET #1
Ticket =: 2694522 Time Batched: 5:31 AM Time Sampled: 6:30 AM
Slump ('in..): 6 Air Content I%): 3 1-2 Unit Weight Ipct'}: N."A
Conc. Temp. I:'F): 85 Ambient Temp. I°F): ~ Yardage (c.y.): 60 ¢-Y.
Placement Locanon: Paving lot - North of leasing building
Sample Location: North of leasing building - 25' N & 15' W of SE comer of SE parking spaces
Remarks: Slump non-compliant. Mike Ward notified, elected to place concrete
CONCRETE COMPRESSION TEST RESULTS
(.'YLINDERS MOLDED AND (_'URED PER ASTM C31. 'rESTED PER ASTM C39. CAPPED PER ASTM ('123
Set # Age .Max Load Strength
Cylinder # Test Date Area (sq.in) Notes
1 (Days) (lbs) (psi)
072801 8.."4.'00 7 83940 28.27 2970
072802 8.-'25,:00 28
072803 8.-"25:"00 28
IC, kR
072804 Hold
(I } NORMAL C'YLINDER SIZE 0" X !2"..&REA 28 2~ ~q m.. UNLESS NOTED ..\BOVE.
t2) UNBONDED CAP SYSTEM L'SED UNI.ESS OII [ERWISE NOTED ABOVE
t'3'~ FIELD TESTS ARE PER APPLICABLE ASTM ST.kND.\RDS. C1~8. C'.43, C 172. C23!
Page I of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERIL&-MAIL INC. -
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.qLLAS FORT WORTH HOUSTON LONG~TEW .dUSTIN
11050.4bles Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Conm~unities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Hembecker
REPORT DATE: 8;9.-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-064 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 7.-28.-00
Slump (in.): I - 5 Sampled By: E. Jennings
Air Content (%1: 3 - 6 Weather: Clear
Concrete Temp I°F): N.'A Supplier.'Mix: TXI
FIELD DATA: SET #2
Ticket ~: 2694797 Time Batched: 7:54 AM Time Sampled: 8:50 AM
Slump (in.): 8 1.2 Air Content I%~: 3 1..'2 Unit Weight ipcf): N.'A
Conc. Temp. (°F): 92 Ambient Temp. (:'F): 9.'.- Yardage !c.y. ~: 160
Placement kocation: Paving lot - North of leasing building
Sample Location: 30' N & 10' E of SW corner of SW parking spaces
Remarks: Slnmp non-compliant. Mike Ward notified, elected to place concrete.
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOLDED AND ('t. RED PER ASTM ("31. TESTED PER ASTM C39. C'..\PI~ED PER ASTM CI231
Set # Cylinder # Test Date Age Max Load Area (sq.in) Strength Notes
2 (Days) (lbs) (psi.)
072805 8."4/00 7 68020 28.27 2410
072806 8;25/00 28
072807 8-'25.-"00 28
KAR
0'm808.._ Hold
(!~ NORMAL CYLINDER SIZE U' X 12". ARE.& 28.2" ,q. m.. UNLESS NOTED ABOVE.
~.2~ UNBONDED CAP SYSTEM USED UNLESS OTH[!RWISE NOTED ABOVE.
(3~ FIELD TESTS ARE PER APPI_I( '..\BLE ASTM ST.-\N DARDS: C138. C143. C 172. ('23
~ Gary D. Dry,
Page 2 of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATEI~ALS ENGINEERS
D.4 LL.4S FOR T WOR TH HOUSTON LONG VIEW .4 USTIN
11050.4hies Lane. Dallas. Texas ,_ ~9 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Conm~unities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8-'9.-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-064 Ci~' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength Ipsil: 3000 Placement Date: '7.28 '00
Slump (in.~: 1 - 5 Sampled By: E. Jennings
Air Content !%): ~ - 6 Weather: Clear
Concrete Temp I.:F): N.-'A Supplier'Mix: TXI
FIELD DATA: SET #3
Ticket #: 269479v Time Batched: 7:54 A_X.I Time Sampled: 8:50 AM
Slump ('in.):. . 8 I 2 Air Content I"i,'~:. 3 1-'2 Unit Wei,,ht= Ipct3: N.-"A
Conc. Temp. I:F): 92 Ambient Temp. (°F): 95 Yardage tc.y.): 160
Placement Location: Paving - North access to leasing building
Sample Location: 10' S & 15' E of West expansion, joint to fire lane
Remarks: Slump non-compliant. Mike Ward notified, elected to place concrete.
CONCRETE COMPRESSION TEST RESULTS
CYi.INDERS Xl(')L_DED AND Cl.'RED PER ASTM C3 i. TESTED PER ASTM C3(). CAPPED PER ASTM C 1231
Set ~ Cylinder ~. Test Date Age .Max Load Area (sq.in) Strength Notes
3 (Days) (lbs) (psi)
072809 8.-'4,'00 7 71440 28.27 2530
0728 ! 0 8."25.."00 28
07281 1 8.'25/'00 28
KAR
072812 Hold
(1i NORMAL CYLINDER SIZE-. o" X 12". AREA 28.2- sq. :::. UNI.ESS NOTE[) ABOVE
(2) UNBONDED CAP SYSTEM I..;.SEI.) UNLESS OTI!ERWISE NOTED AB(')VE
~3'~ FIELD TESTS ARE PER AI'P!_I('.-\BLE ASTM STANDARDS. ('1_~8. C'l-:3. ('172, ('231
Page 3 of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, Without the written consent of TMI. Results apply only to above tests.