Loading...
Gunner P2-LR000809 (2) TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL .-kIND MATERIALS ENGINEERS DALLAS FOR T WORTH HOUSTON LONG[TEW .4L'STIN 11050 Ables Lane. Dallas. l'exas 75229 Phone.'972-488-8800 REPORT OF CONCRETE PLACEMENT CLIENT: North American Conununities DISTRIBUTION: PROJECT: Karrin~on Aparuneuts Archon Group - Angie Rawie TMI REPORT #: DC00-040-069 North .-Mllericall Conmmnities - Kurt Heinbecker REPORT DATE: 8/9,'00 C.D. Construction - Garreth Campbell SER'vlCE DATE: 8;3;00 City of Coppell - Greg Jones CONCRETE FOR: Slab CUBIC YARDS PLACED: 330 DESIGN IDENTIFICATION: 139505 READY MLX PLANT: TXI TIME OF POUR: START: 4:00 ,~M FINISH: 10:30 A3,1 CONCRETE TEMPERATURE RANGE: 84-92 AIR TEMP. RANGE: 79-94 SLUMP RANGE: ENTRAINED AIR RANGE: TEST CYLLNDER OR BEAM ID: 3 i.-2 - 6 TECHNICIAN: E. Jennings TIME: 7.5 hours COMMENTS OR PROBLE31S: As a representative ofTMl. Elisha Jennings obtained a sample of the 150 yard truck. Slump test h~dicated that thc slump was in excess of the project requirements. The Contractor's representative decided to combine truck .--.723 ~ wet load~ with the next drier load. A sample was obtained from me next available truck. Contractor was hfformed. sd Note: This report is tbr the exclusive use o£the Client addressed. ~'",-~..*~'~w~. ~l~ ~po~ ~5' not be reproduced except m its entirety, without TE~-MAR. ~c. This the 'x-fi~en mmsent ufTMI. Results apply only to above tests.