Loading...
ST9702-CS 970326 - PROPOSAL - - ABCON PAVING, INC. Proposal ASPHALT & CONCRETE N.0 . 11 ~ ~- 5 ' 1045 E, Highway 121 PARKING AREAS Lewisville, Tx 75057 REPAIR PAVING 214-221-7535 GRADING SEAL COATING Date 3/26/97 METRO '434-2811 Proposal Submitted To Work To Be Performed At City of Coppell Southwestepn Blvd. Engineeping Depaptment Fpeepopt Papkway P.O. Box N78 Coppell, Texas Coppell, Texas 75019 Attn: Mp. Atul Patel We hereby propose to furnish the materials and perform the labor necessary for the completion of 1. Conepete Stpeet Repaip: Saw cut and pemove the existing conePete pavement and conepete median at the intepsection of Southwestepn Blvd. and Fpeepopt Papkway. Excavate to a depth of 12 inches below top of exist- ing conePete. Remove all spoils Pocks, bollapds, and GTE Util- ity vault fpom job site. Backfill vault apea with suitable matepial. Place 6 inches of Cement Tpeated Base. Pave with 8 inches of 3500 psi eoncpete~ peinfopeed with ~3 pebap on 2N inch eenteps~ dowelled into adjacent conepete. Ppiee: $7~000.00 All material is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workman- like manner for the sum of Seven Thousand 8 no/100 Dollars ($7,000.00) with payments to be made as follows: ~BC.~ IN~ On completion of job. ' " B Note: This proposal may be withdrawn by us if not accepted within 30 days. ACCEPTANCE OF PROPOSAL The specifications and conditions as set forth above and on the r rs ide of this proposal are satisfactory and are hereby accepted. ~ Signature . Date ~"'2~"'~ 7 Signature _ TERMS AND CONDITIONS 1. Any deviation from the specifications or modification of the terms of this contract and any extra or incidental work shall be set forth in writing and signed by both parties thereto. 2. Company will provide PUblic Liability and Property Damage Insurance. 3. If, in the opinion of Company, your credit becomes unsatisfactory before commencement or at any time during the course ofthework, adequatesecurity shall be furnished by you to Company upon its request, or Company shall have the right to discontinue work treat the contract as having been breached by you, and bring suit for the completed work and for its damages by reason of your having breached this contract. 4. There shall be no liability on the part of the Company for damages resulting to utilities or other facilities or objects buried beneath the area of construction.