Gunner P2-LR000802 TERRA-MAR. ENC.
GEOTECI'LNICAL ENVIRONMENTAL ~--MND MATERIALS ENGENEERS
DALLA3' FORT g'ORTH IIOUSTON LO:\:GI/IEIV .4L~'TL\'
l i 050 Ables Lane. Dallas. Texas 75229 Phone.'972-488-,~800
REPORT OF CONCRETE PLACEMENT
CLIENT: North American Communities DISTRIBUTION:
PROJECT: Karrington Aparunents Archon Group - .4ingle Rawie
TMI REPORT #: DC00-040-065 North .American Conmmnities - Kurt HeLubecker
REPORT DATE: 8.'2.'00 C.D. Construction - Garreth Campbell
SERVICE DATE: 7:28:00 City of Coppell - Greg Jones
CONCRETE FOR: PavLug
CUBIC YARDS PLACED: 300 DESIGN IDENTIFICATION: 8203
READY MIX PLANT: TXI
TIME OF POUR: START: 5:00 FINISH:
CONCRETE TEMPERATURE RANGE: 85 AIR TEMP. RANGE: S0
SLUMP RANGE (in.): 5-6 ENTRAINED AIR RANGE: 3.5-4.5
TEST CYLINDER OR BEAM ID: KAR 073101 - 073112
TECHNICLAN: S. Adli
TIME: 5 hours
COMMENTS OR PROBLEMS:
sd
This report nm3' nt,t bc reproduced cxizept in its enti:-ety, without rY. ~,. D . g/f/od
the ,.vrirten consen! ol'T.M [. Results apply only to above tests. Project Manager