Loading...
Gunner P2-LR000802 (2) TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOUSTON LONGI'IEW .4USTIN 11050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Comnmnines Archon Group - Angie Rawe PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker REPORT DATE: 8-2'00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-062 City of Coppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength {psi): 3000 Placement Date: 7 25-00 Slump (in. ~: 5 Sampled By: E. Jennings Air Content (%): 3 - ? Weather: Clear Concrete Temp !':F): Supplier Mix: TXI FIELD DATA: SET #1 Ticket #: 1480690 Time Batched: 4:48 AM Time Sampled: 5:40 AM Slump (in.'}: ~ Air Content i% }: N. A Unit Weioht= I pcF}: 3000 Conc. Temp. (CF}: 85 Ambient Temp. (°F'}: 69 Yarda,',e lc.3'.): 2(._!) Placement Location: Parking slab ' clubhouse head in parking area Sample Location: Remarks: Air meter seal leaked: unable to perform accurate air test on this sample. CONCRETE COMPRESSION TEST RESULTS ( YLINDER.S MOLDED AND ('L I>`ED PER .-xSIM (_'31. TESTED PER .-\S:'M ("3'). C.-M'PIiD PEI>` .\STM t ~231 Set .=..' Age Max Load Strength Cylinder .= Test Date Area (sq. in) Notes 1 " (Days) (lbs) ' {psi) 072501 8: l .'00 7 78590 28.27 2780 072502 8:22.-"00 28 072503 8:22/00 28 ICAR 072504 Hold {l ) NORMAL CYI.INDEI>, SIZE (>" X 12". AREA 28.2- ~q. m.. UNLESS NOTED ABOVE. t2:, UNBONDED C.-\P SYS'FEM I '.~;FD L:NLESS OTHERWISE NOTED .-\BOVE i3', FIELD TESTS .\RE PEI>, APPL[£'.XBLE ASTM STAN[) \RDS. UI 3'~. ('1-'3. ('1-2. C231 Additional Distribution: ,d . D.'Dry, '~ Page 1 of 2 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests. IERRA-MAR, INC. GEOTECHNIC.'kL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT WORTH HOL."STON LO:¥GI'TEW AUSTIN 11050 AbM'Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - Angie Rawe PROJECI: Karrington Apartments North American Communities - Kurt lteinbecker REPORT DATE: 8-'2.00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-062 City of Coppell - Greg Jones SPECIFICAIIONS PROJECT DATA Strength {psi}: 3000 Placement Date: ,.-.:_ 00 Slump iin.~: 5 Sampled By: E. Jennings Air Content I':b.l: ~ - ? Weather: Clear Concrete 'Femp I':F): Supplier. Mix: TXI FIELD DATA: SEI #2 Ticket =.: 1546449 Time Batched: 8:41 A.X-I Time Sampled: 9:40 AM Slump ~in. ~: 4_ Air Content (%): N A [_.'nit Weight tpcf): 3000 Cone. Temp. I:Fl: 9~_2 Ambient Temp. (:F): 8.~~ Yardage !c.y. }: 120 Placement Location: L'tility garage across from building pad 6 Sample Location: Remarks: Air meter seal leaked - unable to perform accurate air tests. CONCRETE COMPRESSION TEST RESULTS \ --~" -.-,-\ -,.~. ,:. ":'LIN r)ERS. IOIDED .\ND t ~. RED PER .\SI M (1'31. TESTED PER AS'IM C_'-'). C..\PPED PER .\S ~. 1 (: __-, Set ~ Cvlinder.'¢- Test Date Age Max Load Area Strength Notes 2 (Days) (lbs) (,sq.in) (psi) 072505 8/1/00 -.' 87080 28.27 3080 072506 8/22:-'00 28 072507 8/22/00 28 072508 Hold ('..) NORM.\L CYI.!NDER SIZE o" X 12"..-\RE:\ 28.2- sa. in.. UNLESS NOTE[) ABOVE. ~2~ UNBOND[XD C.\P SY:-;'I'EM I~SED UNLESS OTItER\VISE NOTED ABOVE. i_'- ) FIELD TESTS :\RE PER .\PPL!CABLE AST\! ST:\ND:XRDS. C138. C1-;3, C1-2. £'231 Additional Distribution: Page~of" 2 Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.