Gunner P2-LR000801 TERI~&-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LO:¥GVIEW AUSTIN
11050 Ables Lane. Dallas. Fexas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-1.00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength {psi): 3000 Placement Date: 7 14'00
Slump i. in.): 4 - 6 Sampled By: E. Jennings
Air Content t%'}: 4 - 6 Weather: Clear
Concrete Temp t:Fl: N.:A SupplierMix: TXI
FIELD DATA: SET #1
Ticket -~' 1.4:89_- Time Batched: 6:00 AM Time Sampled: 6:45 AM
Slump (in.}: 5 Air Content i°'o}: 4 1'2 L:nit Weight ipcf):
Conc. Temp. I.::F): 90 Ambient Temp. (:F): 8_.~0 Yardage i.c.y. ~: 40
Placement Location: Paving - Eastside drive and parking
Sample Location: Paving - 30' S.: 40' E. of SE comer of building =.4
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYI_INDERS MOLDED AND (.'[:RED PER AS'[ M C3 '., TESTED PER AS i'N1 C39. C:\PPED PER \STM ('123 i
Set ~- Cylinder # Test Date Age Max Load Area Strength Notes
1 (Days) (lbs) (sq.in) (psi)
071401 7/21/00 7 77760 28.27 2750
071402 8/11/00 28
071403 8/11.."00 28
KAR
071404 Hold
(1 ~ NORM.-\I_ ('YI.INDER SIZE 6" X 12", .-\REA 28 2? sq. m, I;NI.ESS NOTE[)..\i:3¢-)\'E.
(2') L.'NBOND[!D ("AP SYSTEM [.;SED UNI_ESS OTHERWISE NOTED ABOVI:..
(3') I:[Ei.D TESTS .\RF. PER APPI.ICABI.E .\STM STANDARDS (7138. C'.43. ('I'~2. ('23!
Page 1 off 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERIL4,-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALL.4S FORT WORTH HOUSTON LONG~'TEW .4USTIN
11050 Ables Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group -Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8'I-'00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength ~ psi'): 3000 Placement Date: 7 14 00
Slump lin.): 4 - 6 Sampled By: E. Jennings
Air Content !%): 4 - 6 Weather: Clear
Concrete Temp t"F~: *'.-'A Supplier.-Mix: TXI
FIELD DATA: SET #2
Ticket r< 1543920 Time Batched: 8:07 AM Time Sampled: 9:00 AM
Slump (in.): _.~ 1 _~ Air Content i °',.',~: ~'~ 1-2 Unit \Vei~,ht= tpct'):.
Conc. Temp. (':F): 9.2 Ambient Temp. {fF}: 9{._2) Yardage i c.y. ~: 150
Placement Location: Paving - Eastside drive and parking
Sample Location: Paving- 50' S.: 50' E. of NE comer of building
Remarks: * Seven day compressive strenth indicates that the 28 day max.' be marginal.
CONCRETE COMPRESSION TEST RESULTS
CYI .INDERS MOLDED AND CURED PER ASTM ('3 i. TESTED PER ASTM ('39. CAPPED Pt:.R ASTM C'. 23 I
Set ~- Age Max Load Area Strength
Cylinder ¢ Test Date Notes
2 (Days) (lbs) (sq.in) (psi)
071405 7.-"21;00 7 .... 53430 ')8 '~'~, 1890 *
071406 8/11 .-"00 28
071407 8.-'11.-"00 28
IC4,R
07 1408 Hold
(1 ~ NORMAL CYI.INDER SIZE 6" X 12". ARE.\ 28 2~ sq. :n.. t.'NI.ESS NOTED -\BO\'ii.
~'2 .','NBONDED flAP SYSTEM USED t..iNLE>;S O'FIIERWISE N(,)Ti!D ABO\-'E.
~3'~ FIELD TES ~ ~7 ARE I ER .-\P, LICABI.E :\b",'x. 1 STANDARDS. CI38. (,'143. (-'1-2. ¢ 231
Page 2 of 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERI~&-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGFIEW AUSTIN
l l050.4bles Lane, Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: Noah American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.'1-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psik 3000 Placement Date: 7.14 00
Slump (in.~: 4 - 6 Sampled By: E. Jennings
Air Content I'"o I: 4 - 6 Weather: Clear
Concrete Temp t':F}: N.'A Supplier. Mix: TXI
FIELD DATA: SET #3
Ticket -~: 1.4_9_ 1 Time Batched: 9:40 AM Time Sampled: 10:35 AM
Slump (in. }: ; _Air Content f%): ~ 1.2 Unit Weight ~pcf):
Conc. Temp. (:Fl: 9" Ambient Temp. I:F): 96 Yardage Ic.y.): 250
Placement Location: Paving - Eastside drive and parking
Sample kocation: Paving - 10' N.: 60' E. of SE corner of building -a2
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYI..INDERS \IOLDED AND CURED PER ASTM ('31. TESTED PER ASTM C39. C..\PPED PER ASTS, I CI23 l
Set # Cvlinder-~Test Date Age Max Load Area Strength Notes
3 (Days) (lbs) (sq.in) (psi)
071409 7/21.-'00 7 60380 28.27 2140
071410 8,'11/00 28
071411 8/l 1/00 28
KAR
0? 1412 Hold
i I ~ NORMAL CYLINDI-iR SIZE 6" X 12"...\RE.\ 2.3.27 sq. !n.. UNLESS 'gO'FED .AB()\ E.
(2~ t.'NBONDED ('.-\P SYSTEM USED I_.'NI.I/SS t)-I'HERW[SE NOTED ABOVE
~3i FIELD TESTS ARE PER .-\PPLICABI.]~ .-\S'FM STANDARDS ('138. ('143. C172. (.'23i
~d Gary D~. Dry.
Page 3 of' 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
I'ERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.4LL,4S FORT WORTH HOUSTON LONGVIEW .dUSTIN
11050.4bles Lane. Dallas. Te. ras~'~9, ~_,_ Phone:972-488-8800 Fax.'9-2-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.-'1 00 C.D. Construction - Garreth Campbell
TMI REPORT it: DC00-040-059 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength!psi'): 3000 Placement Date: ? 14 00
Slump (in. I: 4 - 6 Sampled By: E. Jennings
Air Content 1"'o): 4 - 6 Weather: Clear
Concrete Temp (*F.): N. A Supplier.-Mix: TXI
FIELD DATA: SET #4
Ticket .-v: 1181918 Time Batched: 12:05 PM Time Sampled: 1:10 PM
Slump lin. }: 6 Air Content (%}: 3 1-2 Unit Weight (pct'):
Conc. Temp. i::F): 98 Ambient Temp. (':F): 100 Yardage lc.','.'}: 369
Placement Location: Paving - Eaststde drive and parking
Sample Locanon: Paving - 50' N.: 60' E. of NE comer of building ~3
Remarks:
CONCRETE COMPRESSION TEST RESULTS
(_'Y LINI)E'i*,S MOI.DED AND (':,,'RED PER ASTM C3:. TESTED PER ASTM C3g. CAPPED PER ASTM ('1231
Set # Cylinder.a Test Date Age Max Load Area Strength Notes
4 (Days) (lbs) (sq.in) (psi)
071413 7,'21.,O0 7 65090 28.27 2300
071414 8/1 li00 28
071415 8..'11/00 28
IC, S, R
071416 Hold
{1 ) NORM_.\L CYLINDEI,~. SIZE 6" X 12"..-\RE.\ 2S.2'z sq. :n.. ',.NI._ESS NOTED .\BOVE.
'2. UNB()NDED C.\P SYSTEM L'.SED ['NI.i~SS OTIIERWISE NOTED ABOVE.
! J i FIEI_D TESTS .-\RE PER .-\PPI_~CAI-II_[: .\S ['\! ST.-XND.-\RDS C ! 3'3. C143. ('1 ?2. ~ '23 !
i0 Gary D.XDry, X/t t/~
Page 4 of 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-.MAR, INC.
GEOTECHN1CAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGV1EW .4 USTIN
11050 Ables Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 8.1..00 C.D. Construction - Garreth Campbell
TMI REPORT It: DC00-040-059 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength !psil: }000 Placement Date: 7'14 00
Slump (in. }: 4 - 6 Sampled Bx': E. Jennings
Air Content I.'?~,~: 4 - 6 Weather: q'lear
Concrete Temp I.:T): N.A Supplier. Mix: TXI
FIELD DATA: SET #5
Ticket =: 1181931 Time Batched: 2:17 PM Time Sampled: 3:30 PY.t
Slump (in.): 5 Air Content ~°o): 3 I 2 Unit Weight (pcf):
Conc. Temp. i.:FI: 102 Ambient Temp. {:F): 110 Yardage Ic.y.~: 469
Placement Location: Paving - Eastside drive and parking
Sample Location: Paving - 40' S.: 45' E. of SE comer of building '-~2
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YI_INI)ERS MOI.DED AND CL, RED PER ASTM C31. TESTED PER ASTM C39. CAPPED PER ASTM C122:
Set e Age Max Load Area Strength
Cylinder ~ Test Date Notes
5 (Days) (lbs) (sq.in) {psi)
071417 7"21.."00 7 68330 28.27 2420
071418 8.-'11."00 28
KAR 071419 8.-'11.."00 28
071420 Hold
NORS. \ _ ('Y'_INDF_'I~, SIZE o" X ~2". ARE.-\ 28.2v sq. m.. UNLESS NOTED .-\BOVi:{
UNBONDED C.-\P SYS'I'EM USED UNI_ESS O'I-HERWISI~ NOTED ABOVE
FIELD '.rESTS ..\ RE ['Ell APPI.ICABLE .-\STM STANDARDS. ('138. CI43. CI72. ('231
,a Gary D.'Dry, ~[~/~
Page 5 of 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.,tLLAS FORT WORTH HOUSTON LONGPTEW ,dUSTIN
!1050.4bles Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments _North American Communities - Kurt Heinbecker
REPORT DATE: S. 1.00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-059 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength ~,psi): 3000 Placement Date: 7 14 00
Slump (in. I: 4 - 6 Sampled By: E. Jennings
Air Content (%): 4 - 6 Weather: Clear
Concrete Temp (CF): N A Supplier Mix: TXI
FIELD DATA: SET #6
Ticket ~: 11S 1943 Time Batched: 3:58 PM Time Sampled: 5:00 PM
Slump lin.l: 6 l 2 Air Content !%): -4_ Unit Weight ~pcf~:
Conc. Temp. i:F): 100 Ambient Temp. (:'FI: 110 Yardage (c.y.): 569
Placement kocation: Paving - Eastside drive and parking
Sample Locanon: Paving - 30' N.: 40' E. of NE comer of building :2
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYLINDERS MOI.DED AND CI.'R["_I) P£R ASTM ('3 I, TESTED PER :\STM C.3',9. C.-\I~PED PER ASTM ('~ 2~ I
Set # Age Max Load Area Strength
Cylinder .-e Test Date Notes
6 (Days) (lbs) (sq.in) (psi)
071421 7/21.'00 7 69820 28.27 2470
071422 8.-'11/00 28
071423 8!11/00 28
IC&R
071424 Hold
~.I~ NORMAl. CYLINDER SIZE .'.F' X 12", .-XI~,I::.A 2S 2~ sa. in.. UNt. ESS NOTED AB()\ E.
(2~UNBONDED ( AP SYS'FEM USED UNI.ESS O'FHERWISE N()TED ABOVE
t3'~ FIELD ['ESTS ARE PER \i)['!..IC:\BLE .-\STM ST..kNDAI{DS: ('128. C!:3. ('!-2. ('2.31
,~ . . Dr:', /o~
Page 6 of 6 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its