Gunner P2-LR000731 TERRA-I~LAR~ ENC.
GEOTECI~'ICAL ENVIRONMENTAL ANI) MATERIALS ENGINEERS
D.-tLL-tS FORT fI.'ORTH HOUSTON LONG~'IE~V AUSTIN
! i050.4blex Lane. Dallas. To:fas 75229 Phone:972-488-8800
REPORT OF CONCRETE PLACEMENT
CLIENT: North American Communities DISTRIBUTION:
PROJECT: Karrin~on Aparmtents Archon Group - Angle Rawie
TMI REPORT #: DC00-040-062 North .~dnerican Conm~unities - Kurt Heinbecker
REPORT DATE: 7.-'31.'00 C.D. Construction - Garreth Campbell
SERVICE DATE: 7:25.'00 City of Coppell - Greg Jones
CONCRETE FOR: Curbs, embankments and garage slab.
CUBIC YARDS PLACED: 150 DESIGN IDENTIHCATION: 8203
READY MIX PLANT: TXI
TIME OF POUR: START: 5:00 AM FINISH: 12:00 PM
CONCRETE TEMPER_ATURE IL-XNGE: 85-90 AIR TEMP. IZ-XNGE: 69-82
SLUMP RANGE: 4"-5" ENTRAINED AIR RANGE: 4 - - 2
TEST CYLINDER OR BEAM ID: KAR 072501 - 072508
TECHN'ICL-XN: E. Je~mings
TI>IE: 7 hours
COM~IENTS OR PROBLEMS:
sd
Note: This report is Ibr !he exclusive use or'the Client ::ddressed.
This report nmy utq be r=p,,'oduccd except m its enth',2tv, v.-ithout Gar~- D. Dry
the written COllSelI1 of'l'_~lL Results apply only' to :~bovc ~ests. Project Manager