CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 7.'29-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-060 CiD' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength ~psi): 3000 Placement Date: 7.-'19'00
Slump (in.): 5 Max. Sampled By: S. Adli
Air Content (% !: 3 - 6 Weather: Clear
Concrete Temp (':F): 9.~5 Supplier.'Mix: TXI '8203
FIELD DATA: SET #1
4 ..... -kM Time Sampled: 5:20 AM
Ticket #: 2685989 Time Batched: ' ~ ~
Slump (in.): 5 Air Content I%): ~ Unit \Veight (pcf~: N."A
Conc. Temp. (W'~: 9_~ Ambient Temp. (':F'~: 8.~5 Yardage Ic.y.): 10"20.'300
Placement Location: Paving at Building 2
Sample Location: South of Building 2 - 180' South & 20' West of NE exit
Remarks:
CONCRETE COMPRESSION TEST RESULTS
('YLINDERS MOLDED AND ('.',.,'RED PER ASTM C31. TESTED PER AS-I'M C30. CAPPED ['ER ASTM C1231
Set # Age Max Load Strength
Cylinder v_. Test Date Area (sq. in) Notes
1 ' (Days) (lbs) (psi')
071901 7.:26i00 7 75630 28.27 2680
071902 8/16;00 28
071903 8il6/00 28
KAR
071904 Hold
tI~NORMALCYLINDERSIZEU'X 12",AREA28.2?:,q m..UNLESSNO'FEDABOVE.
~2 L'NBONDED CAP SYSTEM t, SED UNLESS OTIIER~VISE N(YI-ED ABOVE.
~3) F ELD TESTS ..\RE PER API~LICABLE ..\SI'M ST.-\NI).-\RDS: (7!38. ('!43. (':':2, C231
Gary~D- Dry. lg~]oo
Page 1 of 4. Project :Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
-- TER~4,-M.Mt, INC. -
GEOTECHNICA~ ENVIRONMENTAL AND MATER~.4LS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGFIEW .4 USTIN
11050.4bles Lane, Dallas, Texas 75229 Phone:972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION':
CLIENT: North American Communities Archon Group - Angle Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: "29-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-060 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (.psiS: 3000 Placement Date: 7 '19-00
Slump tin.): 5 Max. Sampled By: S. Adli
Air Content (%): ~ - 6 Weather: Clear
Concrete Temp (:F): 95 Supplier-Mix: TXI ..' 8203
FIELD DATA: SET #2
Ticket #: 265603S Time Batched: 5:34 AM Time Sampled: 6:30 AM
Slump (in.): 2 Air Content I°';o): _4 Unit Weight Ipcf}: N."A
Conc. Temp. !':Fi: 95 Ambient Temp. (:F): 85 Yardage tc.y.): 10-'100-'300
Placement Location: Paving at Building 2
Sample Location: IS0' South & 60' West of NE exit
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYLINDERS MOLDED AND Ct:RED PER AS-FM C31. TESTED PER ASTM C39. C.-\PPED PER .-\STM ("1231
Set # Age Max Load Strength
Cylinder ~. Test Date Area (sq.in) Notes
2 (Days) (lbs) (psi)
071904 7:26..'00 7 72790 28.27 2570
071905 8.-'16!00 28
071906 8116/00 28
IC~R
071907 Hold
(I ~ NORMAL CYI..!NDER SIZE .:," X !2% AREA 28.2? sq in.. L/NLESS NOTED ABOVE
(2) UNBONDED CAI' SYSTEM L'SED UNkESS OT}IERWISE NOTED ABOVE.
{3} FIELD TESTS _\RE PER At~PLIC \BLE ASTM STANDARDS C13fi. ('1~3. Ci72. C23
Page 2 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERI~4-MAR, INC. --
GEOTECHNICA~ ENVIRONMENTAL AND MATERtALS ENGINEERS
DALLAS FORT WORTH HOUSTON LONGVIEW ,4USTIN
l l050 Ables Lane, Dallas. Texas 75229 Phone.'972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 7.'29.'00 C.D. Construction - Garretb Campbell
TMI REPORT #: DC00-040-060 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DAIA
Strength (psi}: .2000 Placement Date: 7.-19.00
Slump (in.): ~ Max. Sampled By: S. Adli
Air Content (%): ~- - 6 Weather: Clear
Concrete Temp {=F): 95 Supplier Mix: IXI "8203
FIELD DATA: SET #3
Ticket #: 2686266 Time Batched: 7:48 AM Time Sampled: 8:30 AY..'I
Slump (in.): 5 Air Content I%): 4_ Unit Weight (pct-): N A
Conc. Temp. I:F): 95 Ambient Temp. [>F): 95 Yardage lc..'.'.}: N.-'A
Placement Location: Paving at Building 2
Sample Location: 220' South & 15' West of NE exit
Remarks:
CONCRETE COMPRESSION TEST RESULTS
(_'YI.INDERS MOLDED AND CURED PER ASTM (_'3 i. TESTED PER AS'FM C39. CAPPED PER ASTM (.'123:
Set ~ Age Max Load Strength
Cylinder ~; Test Date Area (sq.in) Notes
3 (Days) (lbs) (psi)
071909 7.:26/00 7 64640 28.27 2290
071910 8/16/00 28
071911 8/16/00 28
KAR
071912 Hold
NORMAl_ CY[.INDER SIZE o" X .... AREA 28.27 sq. m.. UNLESS NOTED .-\BOVE.
UNBONDED ('AP SYSTEM USED UNLESS OTIIER\VISI-i NOTED .-\BOVE.
FIELD TESTS -\ RI! PER A P.r'l .I(.'.-\BI_E &STM ST..\ND.-\RI)S. (_'135. Ci43. C I '72. (.'231
~ G'~ary .Dry,
Page 3 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-~IAR, INC. -
GEOTECHNICA~. ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT I~"ORTH HOUSTON LONGVIEIt/ ..4USTIN
l l050.4bles Lane. Dallas. Texas 75229 Phone:972-488-8800 Fax:972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 7.'29.-00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-060 CID.' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Stren,,th= (psi): 3000 Placement Date: 7'19.-00
Slump (in.): < Max. Sampled By: S. Adli
Air Content (%'}: 3 - 6 Weather: Clear
Concrete Temp {=F'I: 95 Supplier.'Mix: TXI 8203
FIELD DATA: SET #4
Ticket #: 268538 Time Batched: 9:45 AM Time Sampled: 10:45 AM
Slump (in.'): 3 Air Content {%'}: ~ Unit Weight {pcf): N-'A
Conc. Temp. (°F}: 95 Ambient Temp. C'F): 100 Yardage Ic.y.}: 10-310
Placement Location: Paving at Building 2
Sample Location: 220' South & 50' West of NE exit
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYI_[NDERS MOLDED AND (.'URED PER ASTM C31. TESTED PER AS'I'5,1 C.79. ('AI'PED PER :\STM C] 23 I
Set # Age Max Load Strength
4 Cylinder ~. Test Date (Days) (lbs) Area (sq.in) (psi) Notes
071913 7.-'26.:'00 7 100840 28.27 3570
071914 8.'16,'00 28
071915 8'16/00 28
KAR
071920 Hold
(I) NORMAL CYLINDER SiZE (:," X 12". AREA 28.27 sq. in.. UNLESS NOTED ABOVE
~2) UNBONDED C.-\I' SYSTEM USED t.'NLESS OTHERWISE NOTED ABOVE.
~3) FIELD TES'I'S ..... ARE PFR .\PP!.IC.-\BI_E ASTM ST.\ND.\RDS
~d Gar>' D.~ Dr5,,
Page 4 of 4 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its