Gunner P2-LR000727 (2) TERI~¥MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
DALLAS FORT WORTH HOUSTON LO..VG[TEW .4USTLV
11050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 7..27 00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-054 Cib' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: 7.-'7 '00
Slump !in.!: -'~ -2 Sampled By: A. Haves
Air Content i%): -4 ' -2 Weather: Clear
Concrete Temp ~""F): 100 Supplier-'Mix: TXI
FIELD DATA: SET #1
Ticket =: 2676618 Time Batched: 7:02 AM Time Sampled: 7:48 AM
Slump lin.): 4 I 2 Air Content (%): 5 [.'nit Weight (pcf): N. A
Conc. Temp. (' F'): 9'4 Ambient Temp. ( :F): 92 Yardage ( c.y. ): 70 of 25
Placement Location: Building #11
Sample Location: Unit's 1121 & ! 111
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYI.INDERS MOLDED AND ('[.'RED PER ASTM C31. TESTED PER ASTM C3~). ("API~ED PER ASTM £"123 !
Set ..4 Cylinder ~ Test Date Age Max Load Area Strength Notes
1 (Days) (lbs) (sq.in) (psi)
070601 7.-."14.."00 7 61890 28.27 2190
070602 8/4/00 28
070603 8i4/00 28
IC4,R
070604 Hold
~ I, NOI~.*I.-\.: CYLINDER SIZE 6" X 12"..-\REY. 2,'4.27 sq m. t.'NI.ESS NOTED ABOV[!.
L'NBO\DED CAP S't'S-['ILM USED UNI.ESS O'IHER\VISE NO'FED ABOVE.
FIE! D TESTS .\RE PER APPI..ICABL[_ AST\I S'[.-\ND..\RDS: C1
Gary D.
Page 1 of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.4LL,4S FORT WORTH HOUSTON LONGVIEW AUSTIN
l lO~0.4bles Lane. Dallas. To:fas /~~9 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: 7-27.00 C.D. Construction - Garreth Campbell
TMI REPORT #: DC00-040-054 City of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength~psi): 3000 Placement Date: '7.-'7-00
Slump ~in.): ~; -2 Sampled By: A. Haves
Air Content t':'i)~: -4 -2 Weather: Clear
Concrete Temp I°F): lq)0 Supplier'Mix: TXI
FIELD DATA: SET #2
Ticket -~: 2676810 Time Batched: 8:40 AM Time Sampled: 9:30 AM
Slump ~in.~ 4_ Air Content i%): 4.75 Unit Weight {pcfl: N A
Conc. Temp. i:F): 95 Ambient Temp. (:'F): 94 Yardage lc y ) 140 of 250
Placement kocation: Building ~11
Sample Location: Unit's 1123 & 1113
Remarks:
CONCRETE COMPRESSION TEST RESULTS
CYI_!NDERS MOLDED AND (]'L'RE[) PER ASTM C3 I, TESTED PER ASTM C39. CAPPED PER ASTM C', 231
Set e Age Max Load Area Strength
2 Cylinder # Test Date (Days) (lbs) (sq.in) (psi) Notes
070605 7.-"14:'00 7 73540 28.27 2600
070606 8."4."00 28
070607 8:4/00 28
KAR
070608 Hold
{1) NORM..\L CYLINDER SIZE 6" X 12"..-\Rti..\ 2s '~ ·
_- ..q. :n., UNLESS NOTED ..\BO\'E
{2.) t.:NBONDED ('.\P SYSTEM [.SED I..'NI.ESS OTHERWISE NOTED ABO\-'E.
~.3) FIE\.\) TESTS \RE PER .\I'PI.[CABI_.E .-'\ST\! ST \NDARDS C135. ('143. ('~ 72. ('231
Page 2 of 3 Project .Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.
TERRA-MAR, INC.
GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS
D.4LL.4S FORT WORTH HOUSTON LONG~qEW .4USTIN
11050.4bles Lane. Dallas. Texas 75229 Phone.'972-488-8800 Fax.'972-488-8080
CONCRETE INSPECTION AND COMPRESSION TEST REPORT
DISTRIBUTION:
CLIENT: North American Communities Archon Group - Angie Rawe
PROJECT: Karrington Apartments North American Communities - Kurt Heinbecker
REPORT DATE: ?'27 00 C.D. Construction - Garreth Campbell
TMI REPORT it: DC00-040-054 CID.' of Coppell - Greg Jones
SPECIFICATIONS PROJECT DATA
Strength (psi): 3000 Placement Date: '7.'-7-00
Slump (in.): --'~ -2 Sampled By: A. Haves
Air Content ~"~,!: --4 -2 Weather: Clear
Concrete Temp i:F~: 100 Supplier Mix: TXI
FIELD DATA: SET #3
Ticket #: 2677076 Time Batched: 10:30 AM Time Sampled: 12"00 PM
Slump tin. }: 6_ Air Content I%.}: 5 Unit Weight ipcl): N A
Conc. Temp. I:F}: 9._~5 Ambient Temp. {°F): 9._.~8 Yardage Ic.y..l: 220 to 250
Placement Location: Building ~11
1~.11__ & 11
Sample Location: Unit's 1 ~'~ "q 15
Remarks:
CONCRETE COMPRESSION TEST RESULTS
( Y1 INDERS MOI_DI~D AND ('L'REI) PER ASTM C3 I. TESTED PER .\STM C_'-9. CAPPED PER ASTM (.'~ 23 I
Set e. Age Max Load Area Strength
3 Cylinder a Test Date (Days) (lbs) (sq.in) (psi) Notes
070609 7/14,'00 7 83000 28.2.7, 2940
070610 8:4.-'00 28
070611 8.-'4."00 28
ICa, R
070612 Hold
i [ ~ NORMAl. CYLINDER SIZE 0" X [~"" ..... ARIiA "4 ',':. sq. in .... r-NI_..~,Ssz" · NOTED .\BOVE.
~2~ UNBONI)I/D CAP SYSTI=.M USED UNLESS O'I-[tERWISE NOTED ABOVE.
t3~ F[EI.I') TFSTS \RF. PER APPLIC.\BL[:- ..\STM ST.-\ND:\RDS CI38. C143. ("[72. ~,'23
sd Gar)' D. Dr5', 7/25/o*
Page 3 of 3 Project Manager
Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its
entirety, without the written consent of TMI. Results apply only to above tests.