Gunner P2-LR000725 (3)TERRA-MAR -'
~~__~ GEOTECHNICAL ENVIRON~.IENTAL AND MATERIALS ENGINEERS
~ '--- ~-- D,4LL.4S F'ORT WORTH HOUSTON ,4 USTIN LONGYlEW
ii050 Ables Ln.. D(d!as. Fexas :'5229 phone.-(972)488-8800 _,t'ax't972~488-~5080
Report of Moisture-Density Relationship
Client North American Communities
Project Karrington Apartments Report Distribution N. American Com. - K. Heinbecker
ARCHON Group - Angle Rawie
C. D. Const.- Doyle Dammon
TMI Project No. DC00-040 City of Coppell - G. Campbell
City of Coppell - G. Jones
TMI Report No. DC00-040-048 Don Matlock - FAX: 972-906-0608
Report Date 7/25/00
] Project Information
I
Material Origin: On Site / Native Sampled By: Moe II
Sample Location: Fire lane. East entrance at parking area Sample Date: 7/3/00
Material Description: Light Brown Clay (Lime Treated) Tested By: Charles Ray
Material Use: Lime Stabilized Sub-Grade
] Moisture-Density Relationship - Curve No. 7052 ]
N I
100% Sa turn ti(an
99.0 ..... lgs=2.65)
'._%
cb---95.o~f'I
95.0.
91.0 ~
87.0
19.0 21.0 23.0 25.0 27.0
Moislure Content (~,-~
I Material Properties and Test Information Curve No. 7052
Maximum Dry Density: 95 pcf Liquid Limit: 45 Passing No. 200: 53.0
Optimum Moisture Percent: 25 % Plastic Limit: 37 USCS:
Plasticity Index: 8
Test Method(s): ASTM D698-B, D4318-B, D1140
Rammer Description: Mechanical Preparation Procedure: Moist
Remarks:
The results presented in this report pertain only to the specific items tested. This report was produced for the exc, usive use of the ~,ient. Any geP/=~duction of
this report, or any part therein, is strictly prohibited without the express written consent of 7MI.
Page 1 of 1