Loading...
Gunner P2-LR000630 (2) TERRA-MAR, INC. GEOTECHNICAL ENVIRONMENTAL AND MATERIALS ENGINEERS DALLAS FORT'WORTH HOUSTON LONGVIEW AUSTIN 11050 Ables Lane. Dallas'. Texas 75229 Phone:972-483-8800 Fcrx:972-488-8080 CONCRETE INSPECTION AND COMPRESSION TEST REPORT DISTRIBUTION: CLIENT: North American Communities Archon Group - .~ngie Rawie PROJECT: Karrmgton Apartments North .-M-nerican Communities - Kurt Heinbecker REPORT DATE: 6/30/00 C.D. Construction - Garreth Campbell TMI REPORT #: DC00-040-022 City. ofCoppell - Greg Jones SPECIFICATIONS PROJECT DATA Strength (psi): ,N/.~, Placement Date: ~/19/00 Slump (in.): N,'A Sampled By: Contractor Air Content (%): N,.'X, Weather: N/A Concrete Temp (°F): N;'A Supplier/Mix: N/A FIELD DATA: SET # 1 Ticket ~: N,'A Time Batched: ,N,',A Time Sampled: N,"A Slump (in.): N'3 Air Content {%): N,A Unit Weight (pcf}: N/A Cone. Temp. (°F): N/A Ambient Temp. (°F): N;A Yardage (c.y.): N;'A Placement Location: Inlet Sample Location: Remarks: Cylinders made and information furnished bv contractor. CONCRETE COMPRESSION TEST RESULTS CYLINDERS MOLDED AND CURED PER ASTM C31, TESTED PER ASTM C39, CAPPED PER ASTM C617 Set # Age Max Load Area Strength 1 Cylinder # Test Date (Days) (lbs) (sq.in) (psi) Notes 051901 5/26/00 7 97480 28.09 3470 051902 6/16/00 28 121340 28.37 4280 051903 6/16/00 28 119610 28.37 4220 KAR 051904 Discard (I) NOI~MAL CYLINDER SIZE O" X 12". AREA 28.2' sq. :n., UNLESS NOTED ABOVE. (2) U.'NBONDED CAP SYSTEM USED, TYPE A~CONE: F~-kCTL RE UNLESS OTHERWISE NOTED: B ~CONE-SPLIT); C(CONE-SHEAR.); D (SHEAR); E iCOLUMNAR} (3) FIELD TESTS ARE PER APPLICABLE ASTM STANDARDS: C138. C]43. C172. C23i Additional Distribution: Don Matlock - Fax: 972-906-0608 ,d Gary D. Dry., | Page I of' ! Project Manager Note: This report is for the exclusive use of the client addressed. This report may not be reproduced except in its entirety, without the written consent of TMI. Results apply only to above tests.