Loading...
FS9903-CS 990429  COPPELL, TEXAS 75019 P.O. Box 478 Coppel Texas 75019 972-462-0022 April 29, 1999 Ms. Laura Bittner Michael Baker Jr. Inc. 3601 Eisenhower Avenue, Suite 600 Alexandria, VA 22304 Flood Study Conditional Letter of Map Revision for Elm Fork of Trinity River 10 acre / 48 acre tracts south of Sandy Lake Road Dear Ms. Bittner: The City of Coppell has reviewed the referenced study and is in support of the reclamation as submitted. It is my understanding that all fill on the referenced site will be placed in areas of ineffective flow and will have no impact on the 100-year water surface associated with the Elm Fork of the Trinity River. In conversations with the consultant, Ron Morrison, in reference to question 3C on form 5, it is my understanding that the answer to that question refers to f~ture placement of soil. Fill has not currently been placed so therefore no compac~on reports can be provided at this time. It is also my understanding that all compaction reports will be provided when a LOMR is submitted. The on/y real area of concern expressed by the City of Coppell during the review of the CLOMR was the impact on filling the western portion of the site adjacent to a Carrolton/Farmers Branch school site and a City park site. Detailed site grading plans from the general civil engineer have not been submitted to the City so there is a question whether or not the fill dirt on this site will create some standing or dammed up water on the aforementioned sites. That is an issue that will be addressed during plan review for the development and should not have an impact on the reclamation. Sincerely, Kenneth M. Griffin, P.E. Director of Engineering and Public Works cc: Ron Morrison file/~oodplain.baker499