Loading...
Gunner Sub-LR 990323[ngineering Co. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 Report No.: 99 Project St. Marin Apartments Location: Sidewalk 5' South x 165' West of South West Comer of BeEline and Fairway Road Contractor:. Reported To: Ewing Properties - Mark Morris CONCRETE COMPRESSION TEST REPORT Job No.: 1598-0018 DateCast Specifica~n: Quantity Represented: Sampled By. By Order Of:. 02/22/99 3000 psi ~} 28 days 10/20/30 cu. yds. R. Mannette (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Field Number. St Mar 1 SM022201 SM022202 Test Date: 03/01/99 03/22/99 Maximum Load, LBS: 78210 102130 Age When Tested, Days: 7 28 Compressive Strength, PSI: 2770 3610 Average Strength, PSI: 3920 Type Break: Conical (U.N.O.) Remarks: SM022203 03/22/99 119240 28 4220 Laboratory Number. SM022204 HOLD HOLD 9183 Method of Curing: Field Temperature: Ambient Time of Sample: 12:50 Source of Concrete: Fine Aggregate: Coarse Aggregate: Water. Cementc Fly Ash: Admixture(s): 1 Days, Laboratory From 50 °F Mb~ 61 °F AM/(PM) TXI f/31 02/23 Air Content 4.7 % Pick-Up Charge: Mix Code: 8203 Transported By: M. Boone Slump 5.0 Inches Yes X No Ticket No.: 1246955 Unit Weight PCF Yield CFICY Distribution: City of Coppell - Ga~elh Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Page. 1 of. 1 Test Methods: ASTM C 31, C 39, C 143, C 173, C 192, or C 1064