Loading...
Gunner Sub-LR 981117 (2) 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 83 Job No.: 1598-0018 Project: St. Marin Apartments Location: Paving - 20' E and 45' S of NE comer Bldg 15 Contractor: Reported To: EPI - Mark Morris Date Cast: Specifica~on: Quantity Represented: Sampled By. By Order Off. 10/13/98 3500 psi ~} 28 days 10130/350 cu. yds. L. Savage (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Field Number: SM101'301 Test Date: 10~20/98 Maximum Load, LBS: 97060 Age When Tested, Days: 7 Compressive Strength, PSI: 3440 Average Strength, PSI: Type Breal~ Conical (U.N.O.) Remarks: SM101302 11/10/98 124050 28 4390 4410 SM101303 11/10/98 125160 28 4430 Laboratory Number. SM101304 Hold 8088 Method of Curing: Temperature: Ambient Time of Sample: Source of Concrete: Fine Aggregate: Coarse A~gregate: Water. Cement: Fly Ash: Admixture(s): Field 1 76 °F 4:30 ( AM)/PM TXl/Plant 31 Days, Laboratory From Mix 94 °F 10114 Air Content Pick-Up Charge: Mix Code: 8204 3.6 Transported By: L. Savage % Slump 7 Inches Yes X No Ticket No.: 1157533 Unit Weight PCF Yield CFICY · Distribution: City of Coppell - Garmth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Page 1 of 4 Te~t MMhod~: ASTM C 31, G 3~, C 143, C 173, C 192, ~' C 1064 · · ,fg, tj2"YgC, l alii.emi 0200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 __ CONCRETE COMPRESSION TEST REPORT Report No.: 83 Job No.: Projec'c St. Matin Apartments Location: Paving -40'E of SE of comer Bldg 15 ContTactor. Reported To: EPI - Mark Morris (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. 1598-0018 Date Ca~: 10113198 Specification: 3500 psi ~ 28 days Quantify Represented: 10/120/350 cu. yds. Sampled By. L. Savage By Order Off. Labo, a[ory Number. 8089 Field Number: SM101305 Test Date: 10/20/98 Maximum Load, LBS: 97400 Age When Tested, Days: 7 Compressive Strength, PSI: 3440 Average Strength, PSi: Type Break; Conical (U.N.O.) Remarks: SM101306 11/10/98 133120 28 4710 47OO Method of Curing: SM101307 11/10/98 132330 28 4680 SM101308 Hold Field I Days, Laboratory From 10/14 T~sported By: L. Savage Temperature: Ambient 76 °F Time of Sample: 5:40 ( AM)/PM Source of Concrete: TXl/Plant 31 Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): Mix 96 Air Content Pick-Up Charge: Mix Code: 8204 4.0 % Slump 5.5 Yes X No Ticket No.: 1157582 Unit Weight Yield Distribution: City of Coppell - Garreth Campbell Inches PCF CF/CY EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Signed ' '~ Page 2 of 4 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 83 Job No.: 1598-0018 Projec'c St. Marin Apartments Location: Paving - 50' W and 30' S of SW comer Bldg 17 Contractor:. Reported To: EPI - Mark Morris Date Cas~ Speciflca~on: Quantity Represented: Sampled By:. By Order Of:. (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. 10113198 3500 psi ~} 28 days 101230/350 cu. yds. L. Savage Laboratory Number: 8090 Field Numben SM101309 Test Date: 10/20198 Maximum Load, LBS: 86080 Age When Tested, Days: 7 Compressive Strength, PSI: 3040 Average Strength, PSI: Type Break: Conical (U.N.O.) Remarks: SM101310 11/10/98 114960 28 4070 4100 Method of Curing: SM101311 11/10/98 116490 28 4120 SM101312 Hold Field I Days, Laboratory From 10114 Transported By: L. Savage Temperature: Ambient 74 °F Time of Sample: 7:45 ( AM)/PM Source of concrete: TXl/Plant 31 Fine Aggregate: Coarse Aggregate: Water:. Cement: Fly Ash: Admixture(s): Mix 94 °F Air content 4.1 Pick-Up Charge: Mix Code: 8204 % SlumP' 5.5 Inches' Yes X No Ticket No.: 1157662 Unit Weight PCF Yield CFICY Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Page 3 ,,of~ 4 Te~t Medtod~: ASTM C 31, C 39. C 143, C 173, C 192, °r C 1064 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 83 Job No.: 1598-0018 Project: St. Matin Apartments Location: Paving - 20' W and 30' S of SW comer of Bldg 21 Contractor: Reported To: EPI - Mark Morris Date Cast: Specification: Quantity Represented: Sampled By. By Order Of;. (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. 10113/98 3500 psi ~ 28 days 10/300/350 cu. yds. L. Savage Laboratory Number. 8091 Field Number: SM10i313 SM101314 Test Date: 10/20/98 11111/98 Maximum Load, LBS: 84240 112080 Age When Tested, Days: 7 28 Compressive Strength, PSI: 2980 3960 Average Strength, PSI: 4020 Type Break: Conical (U.N.O.) Remarks: SM101315 11/10/98 115120 28 4070 SM101316 Hold Method of Curing: Temperature: Ambient Time of Sample: Source of Concrete: Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): Field 1 74 °F 9:00 ( AM)/PM 'l'Xl/Plant 31 Days, Laboratory From Mb( 94 °F 10114 Air Content Pick-Up Charge: Mix Code: 8204 4.1 Transported By: L. Savage Slump 5.5 Inches Yes X No Ticket No.: 1157841 Unit Weight PCF Yield CFICY Distribution: City of Coppell -Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Page 4 of 4 Te~t Melhodt ASTM C 31, C 3~, C 143, C 173, C 192, ~' C 1064