Loading...
Gunner Sub-LR 981113 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 77 Job No.: 1598-0018 Project: St. Marin Apartments Location: Paving - 30' N of NE Comer of Bldg. #18 Contractor. Reported To: EPI - Mark Morris Date Cast: Specification: QuantJbj Represented: (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Sampled By. By Order Of:. Labora[ory Number. 10102/98 3500 psi ~ 28 days 10/60/600 cu yds. L. Savage 7994 Field Number. St Mar 1 SM100201 Test Date: 10/09198 Maximum Load, LBS: 81310 Age When Tested, Days: 7 Compressive Strength, PSI: 2880 Average Strength, PSI: Type Break: Conical (U.N.O.) Remarks: Method of Curing: SM100202 10130/98 106550 28 3770 3780 SM100203 10/30198 107190 28 3790 SM100204 Hold Field 3 Days, Laboratory From 10/05 Transported BT. L. Savage Temperature: Ambient Time of Sample: 5:00 Source of Concrete: Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): 74 °F (AM)/PM 'FXI MIX 100 °F Air content 3.4 % Pick-Up Charge: Yes Mix Code: 8203 Slump 5.5 Inches X No Ticket No.: Unit Weight Yield 1151631 PCF CFICY Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction, Dick Dennie AECC, Inc. - Mark Gottschalt Signed Page 1 of 3 Teat Melhod~: ASTM C 31, C 39, C 143, C 173, C 192, °r C 1064 iaiiaeerla! Ga. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 77 Job No.: 1598-0018 Project St. Marin Apartments Location: Paving 40' N X 20' E of NW Comer of Bldg. #17 Contractor. Reported To: EPI - Mark Morris Date Cast: Specification: Quantity Represented: Sampled E~. By Order Of;. (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. 10102/98 3500 psi {~ 28 days 101120/600 cu yds. L. Savage Labof=[ury Number:. 7995 Field Number. St Mar 2 SM100205 Test Date: 10/09/98 Maximum Load, LBS: 87330 Age When Tested, Days: 7 Compressive Strength, PSI: 3090 Average Strength, PSI: Type Breal~ Conical (U.N.O.) Remarks: Method of Curing: SM100206 10/30/98 110520 28 3910 SM100207 10/30/98 114930 28 4060 SM 100208 Hold 3990 Field 3 Days, Laboratory From 10/05 Transported BT. L. Savage Temperature: Ambient Time of Sample: 6:05 Source of Concrete: Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): 76 °F (AM~PM TXl Mb( 102 °F Air Content 4.7 Pick-Up Charge: Yes Mb( Code: 8203 Slump 5.5 Inches No Ticket No.: Unit Weight Yield 1151717 PCF ' ' cFicY Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschait Signed Page 2 of 3 Test Melhod~: ASTM C 31, C 39, C 143, C 173, C 192, or C 1064 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 77 Job No.: 1598-0018 Project: St. Madn Apartments Location: Paving - 35' W of NW Comer of Bldg. #17 Contractor. Reported To: EPI - Mark Morris Date Ca~c Specification: Quan0ty Represented: Sampled B~. By Order Of.. (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. 10/02/98 3500 psi (~ 28 days 10/240/600 cu yds. L. Savage Laboratory Number. 7g~'"~ Field Number. St. Mar 3 Test Date: Maximum Load, LBS: Age When Tested, Days! Compressive Strength, PSI: Average Strength, PSi: Type Break: Conical (U.N.O.) Remarks: Method of Curing: SM100206 10109/98 69870 SM100207 10/30/98 99510 28 3520 7 2470 3530 SM100208 10130/98 100080 28 3540 SM100209 Hold Field 3 Days, Laboratory From 10105 Transported By: L. Savage Temperature: Ambient Time of Sample: 7:40 Source of Concrete: Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): Diatdbution: 74 °F Mix 98 '°F Air Content 4.3 (AM)/PM Pick-Up Charge: TXI Mix Code: 8203 Slump Yes No Ticket No.: Unit Weight Yield 6.0 Inches 1151864 PCF CFICY City of Coppell - Garreth camPbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Signed {~ (~ Page 3 of 3 Te~t MMhod~: ASTM C 31, C3~,C 143, C 173, C 192, or C 1064