Loading...
Gunner Sub-LR 981103 9200 King Arthur Drive Dallas. Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 66 Job No.: Project: St. Matin Apartments Location: Paving - 20' S of SW comer Bldg. 7 Contractor: Reported To: EPI - Mark Morris 159~0018 Date Cast: Specification: Quantity Represented: Sampled By. By Order Of: 09/18198 3500psi(~28 days 10/50/400 cu. yds. L. Savage (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Field Number: SM091801 Test Date: 09/25/98 Maximum Load, LBS: 64900 Age When Tested, Days: 7 Compressive Strength, PSi: 2300 Average Strength, PSi: 2260 Type Break: Conical (U.N.O.) SM091802 SM091803 09/25/98 10/16/98 62870 79270 7 28 2220 2800 2720 Remarks: Laboratory Number. SM091804 10/16/98 74580 28 2640 28 day compressive strength does not meet the required specifications. 7799 Method of Curing: Field Temperature: Ambient Time of Sample: 5:20 Source of concrete: Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): 3 74 °F (AM)/PM TXI Days, Laboratory From 09/21 Transported By: Mix 88 °F Air Content 3.9 % Pick-Up Charge: Mix Code: 8203 Unit Weight Yield M. Boone Slump 8.5 Inches Yes No X Ticket No.: 1140183 PCF CF/CY Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Signed (~ ~ ' ' Page. I of Test Methods: ASTM C 31, C 39, C 143. C 173, C 192, or C 1064 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 66 Job No.: 1598-0018 Project St. Marin Apartments Location: Paving - 40' W and 45' S of SE comer Bldg. 7 Contractor. Reported To: EPI - Mark Morris Date Cast: Specification: Quantity Represented: Sampled By:. By Order Off. 09/18/98 3500 psi <~ 28 days 10/110/400 cu. yds. L. Savage (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Field Number: SM091805 Test Date: 09~25/98 Maximum Load, LBS: 55380 Age When Tested, Days: 7 Compressive Strength, PSI: 1960 Average Strength, PSI: 2020 Type Break: Conical (U.N.O.) SM091806 SM091807 09/25/98 10/16/98 58640 77740 7 28 2070 2750 '2780 Laboratory Number. SM091808 10/16/98 79470 28~ 2810 Remarks: 28 day compressive strength does not meet the required specifications. 7800 Method of Curing: Field Temperature: Ambient Time of Sample: 6:45 Soume of Concrete: Fine Aggregate: Coarse Aggregate: Water. Cement:. Fly Ash: Admixture(s): 3 Days, Laboratory From 09/21 74 °F Mix 88 °F Air Content 4.2 (AM)/PM Pick-Up Charge: TXI Mix Code: 8203 Transported By: M. Boone % Slump 11.5 Inches Yes X No Ticket No.: 1140206 Unit Weight PCF Yield CFICY Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Signed Page Test Methods: ASTM C 31, C 39, C 143, C 173, C 192. C 231 and C 1064 2 of 4 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 66 Job No.: 1598-0018 Project: St. Marin Apartments Loc~on: Paving - 40' N and 40' E of SE comer Bldg. 19 Contractor: Reported To: EPI - Mark Morris Date cast:. Specification: QUantity Represented: Sampled By: By Order Of:. 09/18198 3500 psi (~ 28 days 101200/350 cu. yds. L. Savage (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Field Number: SM091'809 Test Date: 09~25~98 Maximum Load, LBS: 73260 Age When Tested, Days: 7 Compressive Strength, PSh 2590 Average Strength, PSI: 2570 Type Break: Conical (U.N.O.) Remarks: SM091810 09~25/98 71690 7 2540 SM091811 10/16/98 103550 28 366O '3600 Laboratory Number. SM091812 10/16/98 99900 28 3530 7801 Method of Curing: Field 3 Days, Laboratory F[om Temperature: Ambient 80 °F Mix 90 °F Time of Sample: 9;30 (AM)/PM Source of Concrete: TXI Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): 09/21 Transported By: Air Content 4.7 % Pick-Up Charge: Yes Mix Code: 8203 M. Boone Slump No X Ticket No.: Unit weight Yield 6.5 Inches 1140529 PCF CF/CY Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Signed (~ Page 3 of. 4 Test Methods: ASTM C 31, C 39, C 143, C 173, C 192, or C 1064 Emllagerl,I Cl. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 66 Job No.: 1598-0018 Project: St. Madn Apartments Location: Paving - 50'E and 20' S of SE corner Bldg. 19 Contractor: Reported To: EPI - Mark Morals Date cast: Specification: Quantity Represented: Sampled By: By Order Of: 09/18/98 3000 psi (~ 28 days 10/310/320 cu. yds. L. Savage (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Field Number: SM091'813 Test Date: 09/25/98 Maximum Load, LBS: 84120 Age When Tested, Days: 7 Compressive Strength, PSi: 2980 Average Strength, PSh 2880 Type Break: Conical (U.N.O.) Remarks: SM091814 09/25~98 78270 7 2770 SM091815 10/16/98 106990 28 3780 '3820 Laboratory Numbe~ SM091816 10/16/98 109120 28 3860 7802 Method of Curing: Field Temperature: Ambient Time of Sample: 11:30 Source of Concrete: TXI Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): 3 Days, Laboratory F~rom 83 °F Mix 90 °F (AM)/PM 09/21 Air Content 3.8 Pick-Up Charge: Mix Code: 8203 Transported By: % M. Boone Slump Yes Ticket No.: Unit Weight Yield 5.5 Inches No X 1140753 PCF CF/CY Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie ^ECC, Inc. - Mark Gottschalt Signed Page. 4 of Test Methods: ASTM C 3t, C 39, C 143, C 173, C 192, or C 1064