Loading...
Hollows-LR 990511 (2)ALPHA TESTING, INC. 2209 Wisconsin S?., Suite 100 STABILIZATION / MODIFICATION Dallas, Texas 75229~ FINAL MIX 972/620-8911 - 972/26~-4937 (Metro) FAX; 972/406-8023 TEST~-D FOa: N L W DEVELOPMENT GROUP DAT E: 05/l 1/99 DALLAS, TEXAS PROJECT: HOLLOW ~ NORTHLAKE OURRF. PORTNO: 99128-61 WOODLAND COPPEL, TEXAS ARgA OF WORK: PAVING SUBCdOkDE DATE CEMENT I I LIME i i INITIALLY APPLIED 0~/07199 AVERAGE FINAL COMPACTED DEPTH: 6 INCHES DATE Olt FINAL MLVaNG: 05/10/99 SAMPLE LOCATIONS: % I~ASSING % PASNING 13/4" ~EVE # 4 SIEVE CRESTVIEW DRIVE AT STATION #2+10 I0(PA 66% CRESTV1EW DRIVE AT STATION #5+50 10(PA 69% CRESTVIEW DRIVE AT STATION #7+00 100% 62% CRESTVIEW DRIVE AT STATION g9+22 100% 66% CRESTVIEW DRIVE AT STATION #11+75 100% 73% CRESTVIEW DRIVE AT STATION #13+50 100% 70% CRESTVIEW DRIVE AT STATION #15+90 100% 63% CRESTVIEW DRIVE AT STATION #18+00 100% 65% CRESTVIEW DRIVE AT STATION #20*09 100% 66% CRESTVIEW DRIVE AT STATION #22*50 100% 68% CRESTVIEW DRIVE AT STATION #24409 100% 74% HIDDEN HOLLOW COURT AT STATION #1400 100% 66% HIDDEN HOLLOW COURT AT STATION #34-50 100% 65% HIDDEN HOLLOW COURT AT STATION #5+90 100% 61% Geotechnical Engineering · Conslruction Materials Tes#ng · Environmentol Engineering · Consu~