Loading...
Hollows-LR 990408 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 7~229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4~8~99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-37 COPPELL, TEXAS TEST DATA: TEST '~ ELEV. SOIL ID o~nMUM MAXJMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* ~ I:~CF % PCF 592 4/8/99 FG-3.0 I 26.8 92 28.3 88 96 1-A 593 4/8/99 FG-2.0 1 26.8 92 27.3 90 97 1-A 594 4/8/99 FG-1.0 1 26.8 92 27.1 90 98 1-A 595 4/8199 FG I 26.8 92 29.0 89 96 1-A 596 418199 FG-4.0 1 26.8 92 27.1 90 98 1-A 597 4/8/99 FG-3.0 1' 26.8 92 29.3 88 95 1-A 598 4/8199 FG-2.0 I 26.8 92 29.0 89 97 1 -A TEST LOCATION: 592 WATER LINE AT PAVING STATION HOLLOW RIDGE PLACE AT STATION #3+00 593 WATER LINE AT PAVING STATION HOLLOW RIDGE PLACE AT STATION #3+00 594 WATER LINE AT PAVING STATION HOLLOW RIDGE PLACE AT STATION f~,+00 595 WATER LINE AT PAVING STATION HOLLOW RIDGE PLACE AT STATION #3+00 596 WATER LINE AT PAVING STATION HOLLOW CIRCLE AT STATION 597 WATER LINE AT PAVING STATION HOLLOW CIRCLE AT STATION #2+00 598 WATER LINE AT PAVING STATION HOLLOW CIRCLE AT STATION #2+00 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY VVlTH SPECIFICA"I~)NS RJ~l!~'::~ly Subm~ed ~ Geotechn/ca/Eng/neefing · ~ Moteflo/s Testing · Envfronmen/of Eng/needng · Consu/fing REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/8/99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-37A COPPELL, TEXAS TEST DATA: TEST '~. ELEV. SOIL ID OrmMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH~ NUMBER MOISTURE DRY DENsrrY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 599 4/8/99 FG-1.0 I 26.8 92 28.1 90 98 1-A 600 4/8/99 FG I 26.8 92 30.3 88 95 1-A 601 418199 FG-2.0 1 26.8 92 29.2 89 96 1 -A 602 4/8/99 FG-1.0 1 26.8 92 28.3 90 98 1-A 603 418199 FG 1 26.8 92 28.9 89 97 1-A 604 4/8/99 FG-2.0 I 2618 92 29.7 88 96 1-A 605 418/99 FG-1.0 I 26.8 92 30.6 88 96 1-A TEST LOCATION: 599 WATER LINE AT PAVING STATION HOLLOW CIRCLE AT STATION #2+00 600 WATER LINE AT PAVING STATION HOLLOW CIRCLE AT STATION #2+00 601 STORM SEWER LINE A AT STATION #3+00 602 STORM SEWER LINE A AT STATION #3+00 603 STORM SEWER LINE A AT STATION #3+00 604 STORM SEWER LINE A AT STATION ~6+00 605 STORM SEWER LINE A AT STATION ~+00 1. FILL *' A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WTTH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Res~!~'B~ubmitte~ 3 LIME STABILIZED C. PERCENT IN PLACE MOIb~rURE DOES NOT COMPLY wrrH SPECIFICATIONS 4 CEMENT TREATED D. RETEST Geotechn/ca/Eng/nee#ng · ~ Mate#a/s Testing · Envfronmentaf ~ · Consu/ff~ REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4~8~99 DALLAS, TEXAS PROJECT HOLLOWS ¢~} NORTHLAKE WOODLAND OUR REPORT NO. 99128-37B COPPELL, TEXAS TEST DATA: TEST '~. ELEV. SOIL ID OPTIMUM MAXJMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 606 41819g FG I 26.8 92 26.8 91 99 1-A 607 418199 FG-3.0 I 26.8 92 30.0 89 96 1-A 608 4/8199 FG-2.0 I 26.8 92 28.8 89 97 1-A 609 418/99 FG-1.0 I 26.8 92 27.6 90 98 1-A 610 418/99 FG I 26.8 92 30.1 88 96 1-A 611 4/8/99 'FG-3.0 I 26.8 92 29.2 89 97 1-A 612 4/8~99 FG-2.0 I 26.8 92 28.1 90 98 1-A TEST LOCATION: 606 STORM SEWER LINE A AT STATION #~+00 607 STORM SEWER LINE A AT STATION #9+00 608 STORM SEWER LINE A AT STA~TION #9+00 609 STORM SEWER LINE A AT STATION #9+00 610 STORM SEWER LINE A AT STATION #9+00 611 STORM SEWER LINE A AT STATION #12+00 612 STORM SEWER LINE A AT STATION #12+00 FILL a, A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY W~TH SPECIFICATIONS LIME STABILIZED C. PERCENT IN PLACE M(~STURE DOES NOT C~Y WITH SPECIFICATIONS CEMENT TREATED D RETEST ~~_~ Geotechnk~ol Engineering · Construc~ Matedats Tesflr~ · Environmental Engineering · Consulf~ REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4~8~99 DALLAS, TEXAS PROJECT HOLLOWS ~} NORTHLAKE WOODLAND OUR REPORT NO. 99128-37C COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH'~ NUMBER MOIS-FURE DRY D~NSITY MOISTURE DRY DENsrrY COMPACTION COMMENT* % PCF % PCF 613 4/8/99 FG-1.0 I 26.8 92 29.6 89 97 1-A 614 4/8/99 FG 1 26.8 92 29.7 89 96 1-A TEST LOCATION: 613 STORM SEWER LINE A AT STATION #12+00 614 STORM SEWER LINE A AT STATION #12+00 1. FILL * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACI~K~N COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE a. PERCENT COMPACTION DOES NOT COMPLY WlTH SPECIFICATIONS R~f~y Subm~ed~.. 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED O. RETEST / ALPI::IA-I~TING Jl,~ , Geotechnical Engic~.c,'i~ · Consln~ Materials Testing · Environmental Engin~ · Con~