Loading...
Hollows-LR 990405 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/5/99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-33 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOlE ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~,,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 498 4/5/99 FG-9.0 1 26.8 92 28.2 88 96 1-A 499 4/5~99 FG-8.0 1 26.8 92 28.4 88 96 1 -A 500 4~5/99 FG-7.0 1 26.8 92 26.9 91 98 1-A 501 4/5/99 FG-6.0 I 26.8 92 28.1 89 97 1-AD 502 4/5~99 FG-5.0 I 26.8 92 29.0 88 96 1-A 503 4/5/99 FG-4.0 1 26.8 92 27.5 90 97 1-A 504 4/5/99 FG-3.0 I 26.8 92 28.8 89 97 1-A TEST LOCATION: 498 SANITARY SEWER LINE E AT STATION #13+00 499 SANITARY SEWER LINE E AT STATION #13+00 500 SANITARY SEWER LINE E AT STATION #13+00 501 RETEST OF TEST #.495 DATED 3~29~99 502 SANITARY SEWER LINE E AT STATION #13+00 503 SANITARY SEWER LINE E AT STATION #13+00 504 SANITARY SEWER LINE E AT STATION #13+00 1. FILL a, A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY W1TH SPECIFICATIONS 2. NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLYW1TH SPECIFICATIONS R~l;~c~ully Subm~ 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS // A~-P-I~A TESTINC~-'~ ~technical Engineering · Construc#on IV~Ls Tesl~3g · Envfronmenta/Eng/neer/r~ · Consut/fr~ REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/5/99 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-33A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 505 4/5/99 FG-2.0 I 26.1 92 26.9 90 97 1-A 506 4/5/99 FG-1.0 I 26.1 92 27.8 89 97 1-A 507 4/5/99 FG I 26.1 92 28.3 89 96 1-A 508 4/5/99 FG-8.0 I 26.1 92 29.2 88 95 1-A 509 4/5/99 FG-7.0 I 26.1 92 28.6 88 96 1 -A 510 4~5/99 FG-6.0 I 26.1 92 28.1 88 96 1-A 511 4/5~99 FG-5.0 I 26.1 92 27.7 89 97 1-A TEST LOCATION: 505 SANITARY SEWER LINE E AT STATION #13+00 506 SANITARY SEWER LINE E AT STATION #13+00 507 SANITARY SEWER LINE E AT STATION #13+00 508 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 509 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 510 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 511 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 I FILL ~r A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ~ "tY ~uDITlitted~ 3 LIME STABILIZED C PERCENT IN PI.ACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS Geotechnical Engineering · CanslTucfion Materials Testing · Environmental Engineering · Consul#ng REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/5/99 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-33B COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPT~,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 512 4/5/99 FG-4.0 1 26.1 92 29.4 89 97 1-A 513 4/5/99 FG-3.0 I 26.1 92 29.9 88 96 1-A 514 4/5~99 FG-2.0 I 26.1 92 29.8 88 96 1-A 515 4~5/99 FG-1.0 I 26.1 92 27.4 91 99 1-A 516 4/5/99 FG I 26.1 92 28.3 90 97 1-A TEST LOCATION: 512 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 513 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 514 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 515 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 516 TEST PIT BACKFILL AT SANITARY SEWER LINE E AT STATION #13+00 * A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS FILL NATURAL SUBGRADE B PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Res~ Submitted ] LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS CEMENT TREATED D RETEST L~LPHA . Geotechnical Engineering · ConsfnJc#on Motefiols Testing · Environmentol Engineering · Consulting