Loading...
Hollows-LR 990401 REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Daflas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/1/99 DALLAS, TEXAS PROJECT HOLLOWS @ NORTHLAKE WOODLAND OUR REPORT NO. 99128-29C COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH ~'~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % PCF 423 4/1/99 FG-7.0 2 24.3 95.2 25.1 92 97 1-A 424 4/1/99 FG-6.0 2 24.3 95.2 25.1 93 97 1 -A 425 4/1/99 FG-$.0 2 24.3 95.2 25.8 92 97 1 -A 426 4/1/99 FG-4.0 2 24.3 95.2 26.4 94 99 1 -A 427 4/1/99 FG-3.0 2 24.3 95.2 27.0 93 97 1-A 428 4/1/99 FG-2.0 2 24.3 95.2 24.5 92 96 1-A 429 4/1/99 FG-1.0 2 24.3 95.2 26.9 94 98 1 -A TEST LOCATION: 423 SANITARY SEWER LINE G AT STATION #0+50 424 SANITARY SEWER LINE G AT STATION #0+75 425 SANITARY SEWER LINE G AT STATION #1 +00 426 SANITARY SEWER LINE G AT STATION #1 +50 427 SANITARY SEWER LINE G AT STATION #1 +75 428 SANITARY SEWER LINE G AT STATION #2+00 429 SANITARY SEWER LINE G AT STATION #2+50 A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICAI~IONS Res~ Geotechnical Engineering · C~ Materials Testing · Environmental Engineering · Consu#k~ REPORT OF FIELD OMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St.. Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/1/99 DALLAS, TEXAS PROJECT HOLLOWS @ NORTHLAKE WOODLAND OUR REPORT NO. 99128-29 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCEN1 NO. DATE DEPTH ~,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % pCF % PCF 402 4/1/99 FG-9.0 2 24.3 95.2 24.8 95 100 1 -A 403 4/1/99 FG-8.0 2 24.3 9§.2 26.4 95 100 1 -A 404 4/1/99 FG-7.0 2 24.3 95.2 24.9 93 98 1-A 405 4/1/99 FG-6.0 2 24.3 95.2 24.5 93 98 1 -A 406 4/1/99 FG-5.0 2 24.3 95.2 25.7 94 99 1 -A 407 4/1/99 FG-4.0 2 24.3 95.2 26.1 92 97 1 -A 408 4/1/99 FG-3.0 2 24.3 95.2 24.7 94 99 1-A TEST LOCATION: 402 SANITARY SEWER LINE F AT STATION #0+50 403 SANITARY SEWER LINE F AT STATION #1 +00 404 SANITARY SEWER LINE F AT STATION #1 +25 405 SANITARY SEWER LINE F AT STATION #1 +50 406 SANITARY SEWER LINE F AT STATION #1 +75 407 SANITARY SEWER LINE F AT STATION #2+00 408 SANITARY SEWER LINE F AT STATION #2+25 FILL # A. IN PLACE PERCENI MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS NATURAL SUBGRADE S. P/RCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Resp_.eet'fOIly Submitte'b~ j LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS CEMENT TREATED D. RETEST ~.~~. Geotechnical Engineering · Canstruc#on ~ Testing · Environmental Eng~ee#r~ · Conscf4~/~ REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/1/99 DALLAS, TEXAS PROJECT HOLLOWS @ NORTHLAKE WOODLAND OUR REPORT NO. 99128-29E COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOlE ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH ~.~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* · % PCF % PCF 437 4/1/99 FG-2.0 2 24.3 95.2 27.1 95 100 1 -A 438 4/1/99 FG-1.0 2 24.3 95.2 25.7 95 99 1 -A 439 4/1/99 FG 2 24.3 95.2 26.8 95 99 1 -A TEST LOCATION: 437 SANITARY SEWER LINE G AT STATION #4+00 438 SANITARY SEWER LINE G AT STATION #4 + 10 439 SANITARY SEWER LINE G AT STATION #4-+25 1. FILL # A. IN PLACE PERCENT MOISTURE AND PERCENT COMPAC110N COMPLY WITH SPECIFICATIONS 2. NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY W;1H SPECIFICATIONS 3. LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS 4. CEMENT TREATED D. RETEST Geotechnical Engineering · Construction Matedats Tes#ng · Environmen~ Engineering · Cortsuffing REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/1/99 DALLAS, TEXAS PROJECT HOLLOWS @ NORTHLAKE WOODLAND OUR REPORT NO. 99128-29A COPPELLo TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH"~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT % PCF % PCF 409 4/1/99 FG-2.0 2 24.3 95.2 25.8 95 100 1 -A 410 4/1/99 FG-1.0 2 24.3 95.2 26.1 93 97 1-A 411 4/1/99 FG 2 24.3 95.2 25.4 95 99 1 -A 412 4/1/99 FG-9.0 2 24.3 95.2 24.9 94 99 1 -A 413 4/1/99 FG-8.0 2 24.3 95.2 24.4 93 97 1 -A 414 4/1/99 FG-7.0 2 24.3 95.2 27.2 95 100 1 -A 415 4/1/99 FG-6.0 2 24.3 95.2 26.4 93 98 1-A TEST LOCATION: 409 SANITARY SEWER LINE F AT STATION #2 +50 410 SANITARY SEWER LINE F AT STATION #2 +75 411 SANITARY SEWER LINE F AT STATION #2 +90 412 SANITARY SEWER LINE F AT STATION #3 +25 413 SANITARY SEWER LINE F AT STATION #3+50 414 SANITARY SEWER LINE F AT STATION #3+75 415 SANITARY SEWER LINE F AT STATION #4+00 FILL # A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS Respectfull~.~j~m!t*.c.~ LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS CEMENT TBEATED D. RETEST ~' ALPHA T~ ........ Geotechnical Enginccdng · Cons#uctton Materials Testing · Envi~fal Engineering · Consultk~ REPORT OF FIELD COMPACTION TESTS ALPHA TESTING, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/1/99 DALLAS, TEXAS PROJECT HOLLOWS @ NORTHLAKE WOODLAND OUR REPORT NO. 99128-29B COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH ~.,~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 416 4/1/99 FG-5.0 2 24.3 95.2 26.8 93 97 1-A 417 4/1/99 FG-4.0 2 24.3 95.2 26.§ 93 97 1 -A 418 4/1/99 FG-3.0 2 24.3 95.2 25.7 92 96 1-A 419 4/1/99 FG-2.0 2 24.3 95.2 24.5 93 98 1-A 420 4/1/99 FG-1.0 2 24.3 95.2 25.1 93 97 1-A 421 4/1/99 FG 2 24.3 95.2 25.1 93 98 1 -A 422 4/1/99 FG-8.0 2 24.3 95.2 24.5 94 98 1 -A TEST LOCATION: 416 SANITARY SEWER LINE F AT STATION #3+75 417 SANITARY SEWER LINE F AT STATION #3+50 418 SANITARY SEWER LINE F AT STATION #3+40 419 SANITARY SEWER LINE F AT STATION #3 +25 420 SANITARY SEWER LINE F AT STATION #3 + 10 421 SANITARY SEWER LINE F AT STATION #3 +25 422 SANITARY SEWER LINE G AT STATION //0+25 FILL A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS NATURAL SUBGRAD~ B. PERCENT COMPACTION DO{ES NOT COMPLY WITH SPECIFICATIONS ~ ~~ LIME STAB/LIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS CEMENT TREATED D. RETES! Geotechnicol Engineering · Consln~tion Motertc#s Testk'tg · Environmentol ~ · Cc:ftsultY~ REPORT OF FIELD COMPACTION TESTS ALPHA TESTtNG, INC. 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 4/1/99 DALLAS, TEXAS PROJECT HOLLOWS @ NORTHLAKE WOODLAND OUR REPORT NO. 99128-29D COPPELLo TEXAS TEST DATA: TEST ~. ELEV. SOIL ID OPTIMUM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE DEPTH ~-~ NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT' % PCF % PCF 430 4/1/99 FG 2 24.3 95.2 26.2 92 97 1 -A 431 4/1/99 FG-8.0 2 24.3 95.2 25.6 93 97 1 -A 432 4/1/99 FG-7.0 2 24.3 95.2 26.6 93 97 1 -A 433 4/1/99 FG-6.0 2 24.3 95.2 26.8 94 99 1 -A 434 4/1/99 FG-5.0 2 24.3 95.2 25.4 95 99 1 -A 435 4/1/99 FG-4.0 2 24.3 95.2 26.0 94 99 1 -A 436 4/1/99 FG-3.0 2 24.3 95.2 26.1 95 . 100 1 -A TEST LOCATION: 430 SANITARY SEWER LINE G AT STATION #2+75 431 SANITARY SEWER LINE G AT STATION #3+10 432 SANITARY SEWER LINE G AT STATION #3+20 433 SANITARY SEWER LINE G AT STATION #3 +40 434 SANITARY SEWER LINE G AT STATION #3 + 50 435 SANITARY SEWER LINE G AT STATION #3 +70 436 SANITARY SEWER LINE G AT STATION #3+90 FILL # A. IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS ~~*'"-~~ NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY WITH SPECIFICATIONS CEMENT TREATED D. RETEST Geotechnical Engineering · Consh1.1ction Materia~ Testing · Environmental Erlgirleefing · Corlsulfitlg