WA9302-SP 950721 · OlAMETER~i ~:
~F,.Zi~ .oLEs l' ,r. l l
· mi~, 41~'m
' ....
I 1'-6"
4.-2" ji~iL~JPLAN VIEW
I
I
I BILCO TYPE J-5AL
I HATCH W/STAINLESSi
T'~m STEEL HARDWARE
8'
4"
-f DIA. HOLES
EACH SIDE
FLUSH LIFT HA,ilDLE
(NOT SHOWN)
SPRING LATCH WITH
INSIDE-OUTSIDE
HANDLES AND
PADLOCK HASPS
NOTES:
ALL ALUM. IN CONTACT WITH
CONCRETE SHALL RECEIVE
A COAT OF BmTUMASTIC.
2. COVER HATCH WITH POLYETHYLENE
FOR PROTECTION DURING CONSTRUCTION.
3. FOR HATCH REINFORCING AND
DETAILS. SEE DwG. 13.71.
4. lOCATE HATCH AS SHOWN. ON DWG. 1.25.
5. 1 HATCH REQUIRED.
EAC SIDE (12 REO'D PER HATCH).
7. NATGUN TO PROVIDE PADLOCK AND KEYS
,e.-"--' ''~' 01AIdOND PLATE
COVER
RED VINYL GRIP
~..~o..~...... ^o.~2.~J~.
CONTINUOUS ~
~CHOR F)GE ' ~ R~NN~ ~RUDED
~UN E ~ ~pE 6 ~ 3k I~ F I
DOME P~EL
sEcTioN
NATGUN CORPORATION
n TIAL lOAD
IEI. O IVIG WATER STORAGE REEBERVOIR
Ut.i-i-,P_LL TEXAB
ENGI:I: Bi-IVEK, JACOBIS & FI~LEA
DALLAB, TEXAB
JOB No. BSCfl
DOME HATCH
!',~,:',:q i',~*-~-/j*-- __ ~ N're
--{~NO EXCEPTION TAKEN [] MAKE CORRECTIONS NOTED
[] REJECTED [] REVISE AND RESUBMIT
[] SUBMIT SPECIFIED ITEM
Checking is only for l]eneral conformance with the design
concept of the project and general compliance with th:
information given in the contract documents. Any acriD-,
shown is subject to the requirements of the plans ant,'
Specifications. Contractor is responsible for: dimension:~
Which shall be confirmed and correlated at the iob site;
fabrication processes and techniques of construction, co-
ordination of his work with that of all other trades and
performing his work in a safe and satisfactory manner.
SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS DALLAS, TEXAS
----l---l
3
//,
112
4
EXTRUDED NEOPRENE J.-63 GASKET
(ALL AROLJ!~)
GASKET RETAINER
EXTRUDED WITH FRAHE
1/4" ALUM. EXTRUDED CHANNEL
WITH ANCHOR ANGLE
NOTE: LENGTH 14'-0"'
Planufaclurers of Doors for Sl~eCb[ Services
~, o · THE liLCO COHP~
~ Ne~ Haven, Connecticut ,06505
BL CO TYPE J AL t]~
FRAME WITH GASKETS
Drat. en By
ADDroved
J...~ T~m~anc~ ~ 1/64
RRO EXCEPTION TAKEN [] MAKE CORRE ~.TIONS NOTED
EJECTED [] REVISE AND RESUEI~IIT
[] SUBMIT SPECIFIED ITEM
CheckinE is only for general conformance wifh 'he
concept of the project and general comp;i~nce
information given in the contract document'. A'~y ,~.'-
s~wn is subject to the requirements of ~he
specifications. Contractor is responsible ~n: d~T~en
which shall ~ confirmed and correlated a~ he =oh ~; e;
fabrication processes and techniques of con~t"u~ion, .~'",-
ordination of his work with that of all o'her tr?den n-i
~ming his work in a safe and satisfan o~'y ~n~:n~er.
SHIMEK, JACOBS & FINKLEA
CONSULTING ENGINEERS DALLAS, TEXAS