Loading...
Gunner Sub-LR 980910 (4)bllneerlal Ge. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 CONCRETE COMPRESSION TEST REPORT Report No.: 38 Job No.: Project St. Matin Apartments Location: Utility Vault - 60' W of East Entrance Contractor:. Reported To: EPI - Mark Morris 1598-0018 Date Cast: Specinca~on: Quantity Represented: Sampled By:. By Order Of:. 08/06/98 3600 psi ~;! 28 days 9/9/9 cu. yds. S. Spinks (6 x 12 Inch) Nominal Cylinder Size: Area-28.27 SQ. IN. Field Number. SM080613 Test Date: 08/13/98 Maximum Load, LBS: 107190 Age When Tested, Days: 7 Compressive Strength, PSI: 3790 Average Strength, PSI: 3780 Type Break: Conical (U.N.O.) Remarks: Laboratory Number. SM~)80614 SM080615 SM080616 08/13198 09/03/98 09~03~98 106690 130220 126700 7 28 28 3770 4610 4480 4550 Compressive strength complies with specifications. 7327 Method of Curing: Field 1 Days, Laboratory From Temperature: Ambient 82 °F Mix 90 °F Time of Sample: 7:30 (AM)/PM Source of Concrete: Lattimore Fine Aggregate: Coarse Aggregate: Water. Cement: Fly Ash: Admixture(s): 08/07 Transported By: S. Spinks Air Content 4.5 % Slump Pick-Up Charge: Yes X Mix Code: 42 Ticket No.: Unit Weight Yield 3.5 Inches No 7056136 PCF CF/CY Distribution: City of Coppell - Garreth Campbell EPI - Don Matlock (FAX) MFC Construction - Dick Dennie AECC, Inc. - Mark Gottschalt Site Concrete Te~ Meetod~: ASTM C 31. C 39. C 143. C 173. C 192. or C 1064