Loading...
Hollows-LR 990313 REPORT OF FIELD ALPHA rESItNG, tNC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 3/13/99 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO, 99128-18 COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPTIMUM MAXIMUM LAB iN PLACE IN PLACE PERCENT NO. DATE DEPT~ NUMBER MOISI~JRE DRY DENSITY MOISTURE DRY DENSITY COMPACTION COMMENT* % PCF % P~F 226 3/13/99 SG+I.0 3 23.2 98.2 23.4 97 99 1-A 227 3/13/99 SG+1.5 3 23.2 98.2 24.8 94 95 1-A 228 3tl 3/99 FG 3 23.2 98.2 23.7 93 95 1-A 229 3/13199 SG+2.5 3 23.2 98.2 24.2 93 95 1-A 230 3/13/99 FG 3 23.2 98.2 24.5 93 95 1-A 231 3/13~99 SG I 26.8 92 27.6 91 99 2-A 232 3/13/99 SG+0.5 3 23.2 98.2 23.8 98 99 1-A TEST LOCATION: 226 HOLLOW RIDGE PLACE AT STATION #2+50 227 HOLLOW RIDGE PLACE AT STATION #2+50 228 HOLLOW RIDGE PLACE AT STATION #2+50 229 ALLEY 1 AT STATION #1+00 230 ALLEY 1 AT STATION #1+00 231 ALLEY 1 AT STATION #3+50 232 ALLEY 1 AT STATION #3~50 I FILL w A. IN PLACE PERCE[NT MOISTURE AND PERCENT COMPACTtON COMPLY ~ SPECIFICATIONS 2 NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COI~OLY wrrH SPECIFICATIONS 3 LIME STABILIZED C PERCENT IN PLACE MOISTURE DOES NOT COMPLY WI~H SPECIFICATIC~IS '~-' A'"" L~{;~ · 4 CEMENT TREATED O RETEST Geotechnical Engineering · ConsfTuction Materials Tes#r~g · Envfranmentat Engineering · Consulting