Loading...
Hollows-LR 990301 REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 220g Wisconsin St.. Suite 100 Dallas. Texas 7522g 972/620-8911 - 972/263-4937 (Metro) FAX: 972/40~-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 3/1/99 DALLAS, TEXAS PROJECT HOLLOWS (~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-13A COPPELL, TEXAS TEST DATA: TEST ~ ELEV. SOIL ID OPT~UM MAX]MUM LAB , IN PLACE IN PLACE ~ERCENT NO. DATE DEPTH"~ NUMBER MO~S'I'tJRE DRY DENSITY MOISTURE DRY DENSrI~ COMPACTION COMMENT* % I:~CF % PCF 124 3t1/99 FG-4.9 3 23.2 98.2 24.1 96 98 1-A 125 3/1/99 FG-3.9 3 23.2 98.2 24.7 94 96 1-A 126 3/1/99 FG-4.3 3 23.2 98.2 25.2 97 99 1 -A 127 3/1199 FG-3.3 3 23.2 98.2 24.8 95 97 1-A 128 3/1/99 FG-2.9 3 23.2 98.2 25.2 94 96 1-A 129 3/1/99 FG-1.9 3 23.2 98.2 25.0 95 97 1-A 130 3/1/99 FG-0.9 3 23.2 98.2 24.1 96 98 1-A TEST LOCATION: 124 ,BLOCK A, PAD 44 125 BLOCK A, PAD 44 126 BLOCK A, PAD 45 127 BLOCK A, PAD 45 · 128 BLOCK A, PAD 46 129 BLOCK A, PAD 46 130 BLOCK A, PAD 46 1. FILL ,e A IN PL~,CE PERCENT MOISTURE AND PERCENT COMI='ACTION COMPLY'WrI'H SPECIFICATIONS 3 LIME STABILIZED C. PERCENT IN PLACE MOISTURE DOES NOT COMPLY VVlTH 5'PEClFICA.TIONS ~.~~/ 4 CEMENT TREATED D RE'rEST Geotechnical Engineering · Construction Materia~ Testing · Environmental Engineering · Consutfing REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 CMetro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 3/1/99 DALLAS, TEXAS PROJECT HOLLOWS ~;1 NORTHLAKE WOODLAND OUR REPORT NO. 99128-13B COPPELL, TEXAS TEST DATA: TEST SOIL ID o~nMuM MAXIMUM LAB IN PLACE IN PLACE PERCENT NO. DATE NUMBER MOIST!JRE DRY DENSITY MO~TURE DI~Y DENSITY COMPACTION COMMENT* % PcF % Pc.= 131 3/1/99 FG-2.9 3 23.2 98.2 24.4 95 97 1 -A 132 3/1/99 FG-3.1 3 23.2 98.2 25.3 95 9~ 1 -A 133 3/1 I99 FG-2.6 3 23.2 98.2 27.4 92 94 1 -BC 134 3/1/99 FG-2.6 2 24.3 95.2 24.9 94 99 1 -AD TEST LOCATION: 131 BLOCK A, PAD 44 132 BLOCK A, PAD 43 133 BLOCK A, PAD 42 134 RETEST OF TEST ~58 PERFORMED ON 02/20/99 1 FILL * A IN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY WITH SPECIFICATIONS 2 NATURALSUBGRADE B PERCENT COMPACT~N DOES NOT COMPLY WITH SPECIFiCATtONS Re~~ 43 CEMENTTREATEDLIME STABILIZEO CD RETESTPERCENT IN PLACE MOISTURE DOES NOT COMPLY W~'TH SPECIFICATIONS A~HA~/~'~TE_~ING, INC. · Geotechnical Engineering · Construction Materials Testing · Environmental Engineering · Consulting REPORT OF FIELD ALPHA TESTING, INC. COMPACTION TESTS 2209 Wisconsin St., Suite 100 Dallas, Texas 75229 972/620-8911 - 972/263-4937 (Metro) FAX: 972/406-8023 TESTED FOR N L W DEVELOPMENT GROUP DATE 3/1/99 DALLAS, TEXAS PROJECT HOLLOWS ~ NORTHLAKE WOODLAND OUR REPORT NO. 99128-13 COPPELL, TEXAS TEST DATA: TEST SOIL ID OPTIMUM MAXIMUM LAB IN PLACE iN PLAC.,~ PERCENT NO. DATE NUMBER MOISTURE DRY DENSITY MOISTURE DRY DENSITY. COMPACTION COMMENT* % PCF % PCF 117 3/1/99 FG-5.3 3 23.2 98.2 25.6 94 98 1-A 118 3/1/99 FG-4.3 3 23.2 98.2 26.1 97 99 1-A 119 3/1/99 FG-5.6 3 23.2 98.2 24.8 95 97 1-A 120 3/1/99 FG-4.6 3 23.2 98.2 24,1 94 96 1 -A 121 3/1/99 , FG-3.6 3 23.2 98.2 23.3 96 98 1-A 122 3/1/99 FG-5.1 3 23.2 98.2 25.6 95 97 1-A 123 3/1/99 FG-4.1 3 23.2 98.2 23.7 96 98 1-A TEST LOCATION: 117 BLOCK A, PAD 41 118 BLOCK A, PAD 41 119 BLOCK A, PAD 42 120 BLOCK A, PAD 42 121 BLOCKA, PAD 42 122 BLOCK A, PAD 43 123 BLOCK A, PAD 43 FiLL ~ A. fN PLACE PERCENT MOISTURE AND PERCENT COMPACTION COMPLY V~ffTH SPECIFICATIONS NATURAL SUBGRADE B. PERCENT COMPACTION DOES NOT COMPLY WITH SPECIFICATIONS ReS~M~ .~ubmitt~-~t ~ UME STABILIZED C PERCENT IN PLACE MOI~I'URE DOES NOT COMPLY WITH SPECIFICATIONS ...-- j~ CEMENT TREATED D RETEST H Geotechnical Engineering · Construction Materials Testk~ · Environmental Engineedng · Consulting