Loading...
Gunner Sub-LR 980730 (2)Engineering Co. 9200 King Arthur Drive Dallas, Texas 75247-3610 Phone 214/631-4372 Fax 214/631-4380 Mr. Mark Morris EPI Property Development, L.P. 14990 Landmark Blvd., S-300 Dallas, Texas 75240-6729 Project No.: 1520EPI55 Project: St. Matin Apartments Location: Hike & Bike Path West Side of Property Report No.: 104/0466 RESULTS OF FIELD DENSITY TESTS TEST DATE RETEST TEST LOCATION LIFr/ PRoc'roR FIELD Fr~T,D PERCENT NO. OF DEFrH TEST DENSITY MOISTURE OF TEST (it.) NO. PCF % SPECIFIED NI..IlvlBER COMPACTION 312A 07/30/99 312 160' North of South End of Rental Building Final 6 93.6 23.5 95.8 313A 07/30/99 313 320' North of South End of Rental Building Final 6 93.3 23.3 95.5 ~ESTS PERFORMED 3Y: Walter Kirby TEST METHODS: ASTM D 2922, D 3017, D 1558, D2167 OR D 2937 NOTE: This area was saturated with water and allowed to soak overnight prior to retesting. SPECIFICATIONS: 95% compaction @ -2% to +3% of optimum moisture PROCTOR NO.: #6 - 97.7 pcf ~ 25.2% moisture (lime treated matexial) DISTRIBUTION: City of Coppell - Garreth Campbell lvlFC Construction - Dick Dermic AECC, Inc. - Mark Gottschalt SIGNED PAGE 1 OF 1 OUR LETrflI~ Alx~ RI~ORT~ ARE FOR lltE ~CLLr'~E USE OF T'r~ Ct~N'r 10 II~IOM THI~ AR,E AIXIRE~I~, AND APPLY ~Y ~ ~ ~ ~' ~ RE$UL'r$ ARE NOT I',~iCF..,~$~.RILY ~K)ICA'IW~ OF TI~ QUALITY OF APPARENTLY ~)EI,,'IICAL OR ~ ~ TI-~ REPORT ~IAI, L NOT BE REPRODUCED EXCI!i~T ~1 FUI-L WrIHOUT TI'IE APPROVAL OF STANTEc}[