Gulf Bearing-CS 990510VERBAL COMMUNICATION MEMORANDUM
HARDY McCULLAH/MLM ARCHITECTS, INC.
· Telephone Call
· Party 1: ~ ~ City af~# El Conversation
· Party 2: Kyle McCullah
· Date andTime: May 10, 1999 10:00AM
· Project: 51 Acre - Coppell
· Re: City Requirements
· Confirmation Note: If you take exception to, or have a different understanding of any of the above, please contact this office as soon as possible.
· Distribution:
Creek view expansion will have street light assessmem from T.U. Electric;
can be reduced by size of development.
A mutual access agreement is on file from golf bearing project, 15' x 60'
shown with copy.
A hooded left hand turn lane between Tech C & D could have option.
8'-0" wide pave stone feature at driveways on Royal Lane will be required.
The median opening must have concrete detail so trucks can drive over curb
and not damage landscape.
Driveway radius:
25' maximum for 40' wide driveway.
30' required with fire lane for 24' wide driveway.
· 12221 Merit Drive
Suite 280
Dallas, TX 75251
Phone: 972-385-1900
Fax: 972-385-1937
hardyl ~airmail.net
· Fort Worth Otlic~
Metro: 817-577-1270 F:\WPDOCS.99XWEI~KS~350XMARIIgS. 10V